This document is a Performance Work Statement (PWS) for Supervisory Control and Data Acquisition (SCADA) Front End and Integration testing at Cape Cod Space Force Station in Bourne, Massachusetts, dated May 2021 (05/21).

The PWS establishes requirements for testing a power generation microgrid control system through Performance Verification Testing (PVT) and Factory Testing. PVT must be conducted in two phases: Phase I involves field testing of devices, components, subsystems, and the overall system using approved procedures to demonstrate compliance with contract specifications; Phase II consists of a one-week continuous endurance test to verify system operation without failure. The contractor must develop comprehensive PVT plans including system documentation, equipment lists, and detailed test procedures based on a provided template. Factory Testing must demonstrate the proposed control system's capability to meet project specifications and include setup documentation, test plans, test procedures with surge protection verification, and a complete test report documenting all results and corrective actions. Test equipment must be calibrated to National Institute of Science and Technology (NIST) standards with overall accuracy of at least 50 percent better than sensor specifications. Key submittals requiring Government approval include PVT plans, Phase I and Phase II reports, and test instrumentation calibration certificates. The contractor is responsible for scheduling coordination with Government and other ongoing work, conducting testing at Government-approved locations with Government witness, and maintaining detailed records of all test failures and remedial actions.

View the file

Other files

File Type Posted
Amendment 0009 Updated Sheet Vol 1 CU-201.pdf PDF
Amendment 0009 Update Sheet X-601.pdf PDF
Amendment 0009 Updated Sheet 3-T-112.pdf PDF
Amendment 0009.pdf PDF
Amendment 0009 Update Sheet Vol 4 ES103 and ES501.pdf PDF
Amendment 0008 Attachment 11690371.pdf PDF
Amendment 0008 Attachment 11699407.pdf PDF
Amendment 0008 Attachment 11699397.pdf PDF
Amendment 0008 Attachment 11692148.pdf PDF
Amendment 0008 Attachment 11680816.pdf PDF
Amendment 0008 Attachment 11699385.pdf PDF
Amendment 0008 Attachment 11699393.pdf PDF
Amendment 0008 Attachment 11676438.pdf PDF
Amendment 0008 Submission Requirements and Evaluation Criteria.pdf PDF
Amendment 0008 Attachment 11699366.pdf PDF
Amendment 0008 Attachment 11712612.pdf PDF
Amendment 0008 Attachment 11699373.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 Submission Requirements and Evaluation.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Attachment A - Joint Venture Agreement.pdf PDF
Attachment B - Past Performance Questionnaire.pdf PDF
Attachment C - Small Business Participation Commitment Document.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf PDF
Submission Requirements and Evaluation Criteria.pdf PDF
Site Security Requirements.pdf PDF
JA 03 - Fire Alarm System (Redacted).pdf PDF
Solicitation W912WJ26RA003.pdf PDF
JA 02 - Disconnect Switches (Redacted).pdf PDF
JA 01 - Power Filters (Redacted).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .