Construction of Cascade Lakes National Scenic Byway Welcome Station
Award Notice Posted
- Solicitation number
- AG-04GG-S-14-0002
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Awarded
- to Cohen Skovborg, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG04GGC140017 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- 5 miles out of Bend, OR on the Cascade Lakes National Scenic Byway Bend, Oregon 97701, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
This is AMENDMENT #5. Posting 4 new documents for this Amendment.
Clarification on offer due date, septic site evaluation, revisions.
This project is located near the junction of the Cascade Lakes National Scenic Byway/Century Dr./County Highway 46 and Conklin Rd. (Forest Service Road 41). Location is Township 18S, Range 11E. Section 21 SE, WM.
The Welcome Station will provide scenic byway, general recreation, forest information and conservation education displays. The scope of this project is to provide new construction on a 2,083 sq. ft. single story building with composite roofing. The facility will be Architectural Barriers Act (ABA) compliant, energy efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the byway, and compliment the surrounding landscape character.
Work includes but is not limited to the following construction methods and descriptions; outside patios, rock walls, pathways, signage, paving of parking lot and entrance road, vault toilet and drain field. The exterior of the building will be wood siding with rock fascia; the interior will be painted gypsum board finish. The earthwork at the site will consist of clearing and grubbing, construction of entrance road and parking lot, ABA compliant trail development, and general earthwork for construction of a building with septic system. The electrical system will include; security system, access control system, fire alarm system, IT system, outlets, lighting, water and irrigation controls.
A requirement for this project is an Electronic Document Submittal Service used for submittals, reporting, request for information (RFI's), progress documentation, contract modifications, and many other documentation aspects that all parties may utilize for construction management. Examples of these systems are Buzzsaw, Constructware and Submittal Exchange or others that meet the intent of the service needed.
Look for the construction contract to be posted in FBO in the next few weeks.
Update #4 ·
This is AMENDMENT #4. Posting 4 new documents for this Amendment.
Answering RFI's and clarifications in specifications. This project is located near the junction of the Cascade Lakes National Scenic Byway/Century Dr./County Highway 46 and Conklin Rd. (Forest Service Road 41). Location is Township 18S, Range 11E. Section 21 SE, WM.
The Welcome Station will provide scenic byway, general recreation, forest information and conservation education displays. The scope of this project is to provide new construction on a 2,083 sq. ft. single story building with composite roofing. The facility will be Architectural Barriers Act (ABA) compliant, energy efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the byway, and compliment the surrounding landscape character.
Work includes but is not limited to the following construction methods and descriptions; outside patios, rock walls, pathways, signage, paving of parking lot and entrance road, vault toilet and drain field. The exterior of the building will be wood siding with rock fascia; the interior will be painted gypsum board finish. The earthwork at the site will consist of clearing and grubbing, construction of entrance road and parking lot, ABA compliant trail development, and general earthwork for construction of a building with septic system. The electrical system will include; security system, access control system, fire alarm system, IT system, outlets, lighting, water and irrigation controls.
A requirement for this project is an Electronic Document Submittal Service used for submittals, reporting, request for information (RFI's), progress documentation, contract modifications, and many other documentation aspects that all parties may utilize for construction management. Examples of these systems are Buzzsaw, Constructware and Submittal Exchange or others that meet the intent of the service needed.
Look for the construction contract to be posted in FBO in the next few weeks.
Update #3 ·
This is AMENDMENT #3. Posting 10 new documents for this Amendment.
Extension of Bid/Proposal due dates. (See attached SF 30)
This project is located near the junction of the Cascade Lakes National Scenic Byway/Century Dr./County Highway 46 and Conklin Rd. (Forest Service Road 41). Location is Township 18S, Range 11E. Section 21 SE, WM.
The Welcome Station will provide scenic byway, general recreation, forest information and conservation education displays. The scope of this project is to provide new construction on a 2,083 sq. ft. single story building with composite roofing. The facility will be Architectural Barriers Act (ABA) compliant, energy efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the byway, and compliment the surrounding landscape character.
Work includes but is not limited to the following construction methods and descriptions; outside patios, rock walls, pathways, signage, paving of parking lot and entrance road, vault toilet and drain field. The exterior of the building will be wood siding with rock fascia; the interior will be painted gypsum board finish. The earthwork at the site will consist of clearing and grubbing, construction of entrance road and parking lot, ABA compliant trail development, and general earthwork for construction of a building with septic system. The electrical system will include; security system, access control system, fire alarm system, IT system, outlets, lighting, water and irrigation controls.
A requirement for this project is an Electronic Document Submittal Service used for submittals, reporting, request for information (RFI's), progress documentation, contract modifications, and many other documentation aspects that all parties may utilize for construction management. Examples of these systems are Buzzsaw, Constructware and Submittal Exchange or others that meet the intent of the service needed.
Look for the construction contract to be posted in FBO in the next few weeks.
Update #2 ·
This is the SOLICITATION.
The wrong date for the site visit is in the solicitation. The site visit is scheduled for Tuesday July 29, 2014 at 10:00 at the building site.
Technical contact for this solicitation is Zac Hiedeman. His phone number is 541-383-5615.
This project is located near the junction of the Cascade Lakes National Scenic Byway/Century Dr./County Highway 46 and Conklin Rd. (Forest Service Road 41). Location is Township 18S, Range 11E. Section 21 SE, WM.
The Welcome Station will provide scenic byway, general recreation, forest information and conservation education displays. The scope of this project is to provide new construction on a 2,083 sq. ft. single story building with composite roofing. The facility will be Architectural Barriers Act (ABA) compliant, energy efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the byway, and compliment the surrounding landscape character.
Work includes but is not limited to the following construction methods and descriptions; outside patios, rock walls, pathways, signage, paving of parking lot and entrance road, vault toilet and drain field. The exterior of the building will be wood siding with rock fascia; the interior will be painted gypsum board finish. The earthwork at the site will consist of clearing and grubbing, construction of entrance road and parking lot, ABA compliant trail development, and general earthwork for construction of a building with septic system. The electrical system will include; security system, access control system, fire alarm system, IT system, outlets, lighting, water and irrigation controls.
A requirement for this project is an Electronic Document Submittal Service used for submittals, reporting, request for information (RFI's), progress documentation, contract modifications, and many other documentation aspects that all parties may utilize for construction management. Examples of these systems are Buzzsaw, Constructware and Submittal Exchange or others that meet the intent of the service needed.
Look for the construction contract to be posted in FBO in the next few weeks.
Update #1 ·
This is a pre-solicitation notice for a construction contract. This project is for new construction of a 2,083 sq. ft. single story building on the Deschutes National Forest out of Bend, OR.
This project is located near the junction of the Cascade Lakes National Scenic Byway/Century Dr./County Highway 46 and Conklin Rd. (Forest Service Road 41). Location is Township 18S, Range 11E. Section 21 SE, WM.
The Welcome Station will provide scenic byway, general recreation, forest information and conservation education displays. The scope of this project is to provide new construction on a 2,083 sq. ft. single story building with composite roofing. The facility will be Architectural Barriers Act (ABA) compliant, energy efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the byway, and compliment the surrounding landscape character.
Work includes but is not limited to the following construction methods and descriptions; outside patios, rock walls, pathways, signage, paving of parking lot and entrance road, vault toilet and drain field. The exterior of the building will be wood siding with rock fascia; the interior will be painted gypsum board finish. The earthwork at the site will consist of clearing and grubbing, construction of entrance road and parking lot, ABA compliant trail development, and general earthwork for construction of a building with septic system. The electrical system will include; security system, access control system, fire alarm system, IT system, outlets, lighting, water and irrigation controls.
A requirement for this project is an Electronic Document Submittal Service used for submittals, reporting, request for information (RFI's), progress documentation, contract modifications, and many other documentation aspects that all parties may utilize for construction management. Examples of these systems are Buzzsaw, Constructware and Submittal Exchange or others that meet the intent of the service needed.
Look for the construction contract to be posted in FBO in the next few weeks.
Files
Show all 29
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cascade Lakes Scenic Byway Welcome Station | Award Notice | |
| This notice | Award Notice | |
| Construction of Cascades Lakes National Scenic Byway Welcome Station | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity