Amendment_4_DetailScheduleItems.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Construction of Cascade Lakes National Scenic Byway Welcome Station
Solicitation number
AG-04GG-S-14-0002
Issued by

About this file

Amendment 4 - Updated - Schedule of Items

View the file

Other files

File Type Posted
Amendment_5_Septic_Site_Eval_F-24008.pdf PDF
Amendment_5_narrative.docx DOCX document
Amendment_5_SF-30.doc DOC document
Amendment_4_Well_Location.pdf PDF
Amendment_4_SF-30.doc DOC document
Amendment_4_8-20.docx DOCX document
Amendment_3_260902-SubmersibleLevelTransmitter-20110512.doc DOC document
Amendment_3_Interior_Finishes_Schedule.pdf PDF
Amendment_3_260573-OvercurentProtectiveDeviceCoordinationStudy.docx DOCX document
Amendment_3_specs_for_hydroseeding_and_soil_prep.docx DOCX document
Amendment_3_Addendum.docx DOCX document
Amendment_3_DeschutesDoubleGateLayout2014.pdf PDF
Amendment_3_260900-ControlsAnd_instrumentation-20140806.doc DOC document
Amendment_3_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_3_Bid_Bond_Form_SF_24.pdf PDF
Amendment_3_SF-30.doc DOC document
Amendment_2_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_2_EFS_1.pdf PDF
Amendment_2_7th_Mountain_Pit.pdf PDF
Amendment_2_USFS_CLWS_IFS-1.pdf PDF
Amendment_2_8-4.docx DOCX document
3.Welcome_St_All_Dwgs_in_Order.pdf PDF
5.Technical_Evaluation_Questionnaire.docx DOCX document
6.Fire_Clauses.pdf PDF
7.Welcome_Station_Wage_Rates_OR25_dvb.mht MHT file
4.Welcome_Station_Bidders_Packet2.docx DOCX document
2.WelcomeStAllSpecs0718.pdf PDF
1.Welcome_Station_RFP.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SECTION B - SUPPLIES OR SERVICES AND PRICES SCHEDULE OF ITEMS
Name of Offeror or Contractor
Cascade Lakes Welcome Station ‐ SCHEDULE OF ITEMS - AMENDMENT #4
METHOD OF MEASURE
ITEM NO.DESCRIPTIONQUAN.UNITTOTAL

BASE BID ITEMS

1.0GENERAL REQUIREMENTS
1.1Mobilization/De-Mobilization
1.2Testing & Inspections
1.3General Requirements
1.4Contractor Required Insurance
1.5Bid, Payment and Performance Bond
1.6Document Submittal Service

Division Total Lump Sum 1 L.S.Q

Buildings
2.0CONCRETE
2.1Cast-in-Place Concrete
2.2Architectural Pre-Cast Concrete

Division Total Lump Sum 1 L.S.Q

3.0MASONRY
3.1Unit Masonry Assemblies
3.2Stone Masonry Veneer

Division Total Lump Sum 1 L.S.Q

4.0METALS
4.1Metal Fabrications
4.2Gratings

Division Total Lump Sum 1 L.S.Q

5.0WOOD & PLASTICS, AND COMPOSITES
5.1Rough Carpentry
5.2Sheathing
5.3Structural Glued-Laminated Timber
5.4Exterior Finish Carpentry
5.5Interior Finish Carpentry
5.6Interior Architectural Woodwork

Division Total Lump Sum 1 L.S.Q

6.0THERMAL & MOISTURE PROTECTION
6.1Water Repellants
6.2Building Insulation
6.3Asphalt Shingles
6.4Sheet Metal Flashing and Trim
6.5Joint Sealants

Division Total Lump Sum 1 L.S.Q

7.0OPENINGS
7.1Flush Wood Doors
7.2Access Doors and Frames
7.3Wood Patio Doors
7.4Wood Windows
7.5Unit Skylights
7.6Door Hardware
7.8Glazing

Division Total Lump Sum 1 L.S.Q

8.0FINISHES
8.1Gypsum Board
8.2Acoustical Panel Ceilings
8.3Reclaimed Wood Flooring
8.4Resilient Wall Base and Accessories
8.5Linoleum Composition Flooring
8.6Carpet Tile
8.7Painting

Division Total Lump Sum 1 L.S.Q

9.0SPECIALTIES
9.1Signage
9.2Toilet and Bath Accessories
9.3Fire Protection Cabinets
9.4Fire Extinguishers

Division Total Lump Sum 1 L.S.Q

10.0EQUIPMENT
10.1Residential Appliances

Division Total Lump Sum 1 L.S.Q

11.0FURNISHINGS
11.1Horizontal Louver Blinds

Division Total Lump Sum 1 L.S.Q

12.0FIRE SUPPRESSION
12.1Fire Protection

Division Total Lump Sum 1 L.S.Q

13.0PLUMBING
13.1Plumbing Materials and Methods
13.2Plumbing Insulation
13.3Plumbing Piping
13.4Plumbing Fixtures

Division Total Lump Sum 1 L.S.Q

14.0HEATING, VENTILATION, AND AIR CONDITIONING
14.1Common HVAC Materials and Methods
14.2Testing, Adjusting and Balancing
14.3HVAC Insulation
14.4Refrigerant Piping System
14.5Air Distribution
14.6HVAC Fans
14.7Packaged HVAC Units

Division Total Lump Sum 1 L.S.Q

15.0ELECTRICAL
15.1Basic Methods & Materials
15.2Electrical Power Conductors and Cables
15.3Grounding and Bonding for Electrical Systems
15.4Hangers and Supports for Electrical Systems
15.5Raceway and Boxes for Electrical Systems
15.6Identification for Electrical Systems
15.7Lighting Control Devices
15.8Low Voltage Lighting Control Panels
15.9Service Entrance
15.10Panelboards
15.11Wiring Devices
15.12Circuit Protective Devices
15.13Transient Voltage Suppression
15.14Lighting
15.15Water system controls

Division Total Lump Sum 1 L.S.Q

16.0COMMUNICATIONS
16.1Telecommuications Wiring Systems
16.2Wall Mount Equipment Rack & UPS

Division Total Lump Sum 1 L.S.Q

17.0ELECTRONIC SAFETY AND SECURITY
17.1Intrusion Detection System
17.2Access Control System
17.3Fire Alarm and Detection System

Division Total Lump Sum 1 L.S.Q

Site Work
18.0EARTHWORK
18.1Site Clearing
18.2Earth Moving
18.3Termite Control

Division Total Lump Sum 1 L.S.Q

19.0EXTERIOR IMPROVEMENTS
19.1Asphalt Paving
19.2Concrete Paving
19.3Concrete Unit Pavers
19.4Boulders and Boulder Placement
19.5Rock Walls
19.6Gravel Paths

Division Total Lump Sum 1 L.S.Q

20.0UTILITIES
20.1aWater Supply Well - complete, up to 200 ft.Lump Sum1L.S.Q
20.1bWater Supply Well - complete, 201-300 ft.AQ100FT
20.1cWater Supply Well - complete, 301-400 ft.AQ100FT
20.1dWater Supply Well - complete, 401-500 ft,AQ100FT

Division Total Lump Sum 1 L.S.Q

21.0SANITARY SEWER & VAULT TOILET
21.1Facility Sanitary Sewer
21.2Facility Septic Tank
21.3Concrete Vault Toilet

Division Total Lump Sum 1 L.S.Q

22.0STORM DRAINAGE
22.1Retention Ponds
22.2Rain Gardens
22.3Storm Drainage Piping

Division Total Lump Sum 1 L.S.Q

23.0DRYWELL ASSEMBLY
23.1Water Station Drainage Drywell
23.2Pumphouse Drywell Assembly

Division Total Lump Sum 1 L.S.Q

24.0SITE ELECTRICAL
24.1Site Conduit & Electrical Cables
24.2Transformer
24.3Pull Vaults
24.4EV Charging Station

Division Total Lump Sum 1 L.S.Q

25.0WATER DISTRIBUTION
25.1Facility Water Distribution
25.2Water Station

Division Total Lump Sum 1 L.S.Q

26.0SITE IMPROVEMENTS & AMMENITIES
26.1Flag Pole
26.2Bike Parking
26.3Three Panel Kiosk
26.4Single Panel Kiosk
26.5Entrance Gate
26.6Site Signage
26.7Wildlife Tracks
26.8Miscellaneous Site Improvements

Division Total Lump Sum 1 L.S.Q

Utility Trench
27.0UTILITY TRENCH COMPLETE
27.1Pull Vaults
27.2Utility Trench Complete
27.3Directional Boring
Division TotalLump Sum1L.S.Q
TOTAL (of Divisions 1-27)$

OPTIONAL/ALTERNATE BID ITEMS

Optional/Alternate Bid No. 1
AB-1PAVING DAY-USE & RV PARKING AREALump Sum1L.S.Q
Optional/Alternate Bid No. 2
AB-2PAVING EMPLOYEE PARKING & ACCESS ROADLump Sum1L.S.Q
Optional/Alternate Bid No. 3
AB-3LANDSCAPING & IRRIGATIONLump Sum1L.S.Q
AB-3.1Trees
AB-3.2Shrubs
AB-3.3All Other Landscaping
AB-3.4Irrigation
Optional/Alternate Bid No. 4 (Deductive Bid Item)
AB-4CENTURY LINK UTILITIESLump Sum1L.S.Q
Delete 2" conduit for fiber (UFO), pull boxes and connection to Bend Broadband utility as shown on sheets C3.1, C3.2, C3.3, E1.1. Coordinate with Century Link, Joe Dairy (541-233-9820) so Century Link can install a 4" conduit and pull boxes in the trench from ~ Sta 27+00 to Sta 1+77. From Sta 1+77 into building, Contractor to install 4" conduit with 2 pull ropes and Oldcastle 25-TA concrete pull boxes with steel covers at each 90 degree bend and max distance of 75 feet. Bring 4" conduit into IT room 104 as shown on sheet T3.1, replacing the 2" conduit for utility shown with the 4" conduit. Extend 4" conduit 3-feet above floor.
Optional/Alternate Bid No. 5 (Deductive Bid Item)
AB-5BENDBROADBAND INSTALLATION OF UTILITIESLump Sum1L.S.Q
Delete 2" conduit for fiber (UFO), pull boxes and connection to Bend Broadband Utility as shown on sheets C3.1, C3.2, C3.3, E1.1. Coordinate with Bend Broadband, Sandy Morse (541-312-6601), so Bend Broadband can install the 2" conduit and pull boxes in the trench from their pole near hex note 3 on sheet C3.3 to Sta 1+77. From Sta 1+77 to building Contractor to install 2" conduit, pull boxes and pull rope as specified in the contract package. Extend 2" conduit 3-feet above floor in IT room 104.
Optional/Alternate Bid No. 6
AB-6Rock ExcavationLump Sum1L.S.Q
AB-6.1Rock Excavation, trenchingAQ1000LFT
AB-6.2Rock Excavation, vertical excavationAQ10CY
Optional/Alternate Bid Total$
cbfa 0820GRAND TOTAL$