The file's text, extracted by GovTribe without its formatting.
Table 1
| SECTION B - SUPPLIES OR SERVICES AND PRICES SCHEDULE OF ITEMS |
| Name of Offeror or Contractor |
| Cascade Lakes Welcome Station ‐ SCHEDULE OF ITEMS - AMENDMENT #4 |
| | METHOD OF MEASURE | | | |
| ITEM NO. | DESCRIPTION | | QUAN. | UNIT | TOTAL |
BASE BID ITEMS
| 1.0 | GENERAL REQUIREMENTS |
| 1.1 | Mobilization/De-Mobilization |
| 1.2 | Testing & Inspections |
| 1.3 | General Requirements |
| 1.4 | Contractor Required Insurance |
| 1.5 | Bid, Payment and Performance Bond |
| 1.6 | Document Submittal Service |
Division Total Lump Sum 1 L.S.Q
| Buildings |
| 2.0 | CONCRETE |
| 2.1 | Cast-in-Place Concrete |
| 2.2 | Architectural Pre-Cast Concrete |
Division Total Lump Sum 1 L.S.Q
| 3.0 | MASONRY |
| 3.1 | Unit Masonry Assemblies |
| 3.2 | Stone Masonry Veneer |
Division Total Lump Sum 1 L.S.Q
| 4.0 | METALS |
| 4.1 | Metal Fabrications |
| 4.2 | Gratings |
Division Total Lump Sum 1 L.S.Q
| 5.0 | WOOD & PLASTICS, AND COMPOSITES |
| 5.1 | Rough Carpentry |
| 5.2 | Sheathing |
| 5.3 | Structural Glued-Laminated Timber |
| 5.4 | Exterior Finish Carpentry |
| 5.5 | Interior Finish Carpentry |
| 5.6 | Interior Architectural Woodwork |
Division Total Lump Sum 1 L.S.Q
| 6.0 | THERMAL & MOISTURE PROTECTION |
| 6.1 | Water Repellants |
| 6.2 | Building Insulation |
| 6.3 | Asphalt Shingles |
| 6.4 | Sheet Metal Flashing and Trim |
| 6.5 | Joint Sealants |
Division Total Lump Sum 1 L.S.Q
| 7.0 | OPENINGS |
| 7.1 | Flush Wood Doors |
| 7.2 | Access Doors and Frames |
| 7.3 | Wood Patio Doors |
| 7.4 | Wood Windows |
| 7.5 | Unit Skylights |
| 7.6 | Door Hardware |
| 7.8 | Glazing |
Division Total Lump Sum 1 L.S.Q
| 8.0 | FINISHES |
| 8.1 | Gypsum Board |
| 8.2 | Acoustical Panel Ceilings |
| 8.3 | Reclaimed Wood Flooring |
| 8.4 | Resilient Wall Base and Accessories |
| 8.5 | Linoleum Composition Flooring |
| 8.6 | Carpet Tile |
| 8.7 | Painting |
Division Total Lump Sum 1 L.S.Q
| 9.0 | SPECIALTIES |
| 9.1 | Signage |
| 9.2 | Toilet and Bath Accessories |
| 9.3 | Fire Protection Cabinets |
| 9.4 | Fire Extinguishers |
Division Total Lump Sum 1 L.S.Q
| 10.0 | EQUIPMENT |
| 10.1 | Residential Appliances |
Division Total Lump Sum 1 L.S.Q
| 11.0 | FURNISHINGS |
| 11.1 | Horizontal Louver Blinds |
Division Total Lump Sum 1 L.S.Q
| 12.0 | FIRE SUPPRESSION |
| 12.1 | Fire Protection |
Division Total Lump Sum 1 L.S.Q
| 13.0 | PLUMBING |
| 13.1 | Plumbing Materials and Methods |
| 13.2 | Plumbing Insulation |
| 13.3 | Plumbing Piping |
| 13.4 | Plumbing Fixtures |
Division Total Lump Sum 1 L.S.Q
| 14.0 | HEATING, VENTILATION, AND AIR CONDITIONING |
| 14.1 | Common HVAC Materials and Methods |
| 14.2 | Testing, Adjusting and Balancing |
| 14.3 | HVAC Insulation |
| 14.4 | Refrigerant Piping System |
| 14.5 | Air Distribution |
| 14.6 | HVAC Fans |
| 14.7 | Packaged HVAC Units |
Division Total Lump Sum 1 L.S.Q
| 15.0 | ELECTRICAL |
| 15.1 | Basic Methods & Materials |
| 15.2 | Electrical Power Conductors and Cables |
| 15.3 | Grounding and Bonding for Electrical Systems |
| 15.4 | Hangers and Supports for Electrical Systems |
| 15.5 | Raceway and Boxes for Electrical Systems |
| 15.6 | Identification for Electrical Systems |
| 15.7 | Lighting Control Devices |
| 15.8 | Low Voltage Lighting Control Panels |
| 15.9 | Service Entrance |
| 15.10 | Panelboards |
| 15.11 | Wiring Devices |
| 15.12 | Circuit Protective Devices |
| 15.13 | Transient Voltage Suppression |
| 15.14 | Lighting |
| 15.15 | Water system controls |
Division Total Lump Sum 1 L.S.Q
| 16.0 | COMMUNICATIONS |
| 16.1 | Telecommuications Wiring Systems |
| 16.2 | Wall Mount Equipment Rack & UPS |
Division Total Lump Sum 1 L.S.Q
| 17.0 | ELECTRONIC SAFETY AND SECURITY |
| 17.1 | Intrusion Detection System |
| 17.2 | Access Control System |
| 17.3 | Fire Alarm and Detection System |
Division Total Lump Sum 1 L.S.Q
| Site Work |
| 18.0 | EARTHWORK |
| 18.1 | Site Clearing |
| 18.2 | Earth Moving |
| 18.3 | Termite Control |
Division Total Lump Sum 1 L.S.Q
| 19.0 | EXTERIOR IMPROVEMENTS |
| 19.1 | Asphalt Paving |
| 19.2 | Concrete Paving |
| 19.3 | Concrete Unit Pavers |
| 19.4 | Boulders and Boulder Placement |
| 19.5 | Rock Walls |
| 19.6 | Gravel Paths |
Division Total Lump Sum 1 L.S.Q
| 20.0 | UTILITIES | | | |
| 20.1a | Water Supply Well - complete, up to 200 ft. | Lump Sum | 1 | L.S.Q |
| 20.1b | Water Supply Well - complete, 201-300 ft. | AQ | 100 | FT |
| 20.1c | Water Supply Well - complete, 301-400 ft. | AQ | 100 | FT |
| 20.1d | Water Supply Well - complete, 401-500 ft, | AQ | 100 | FT |
Division Total Lump Sum 1 L.S.Q
| 21.0 | SANITARY SEWER & VAULT TOILET |
| 21.1 | Facility Sanitary Sewer |
| 21.2 | Facility Septic Tank |
| 21.3 | Concrete Vault Toilet |
Division Total Lump Sum 1 L.S.Q
| 22.0 | STORM DRAINAGE |
| 22.1 | Retention Ponds |
| 22.2 | Rain Gardens |
| 22.3 | Storm Drainage Piping |
Division Total Lump Sum 1 L.S.Q
| 23.0 | DRYWELL ASSEMBLY |
| 23.1 | Water Station Drainage Drywell |
| 23.2 | Pumphouse Drywell Assembly |
Division Total Lump Sum 1 L.S.Q
| 24.0 | SITE ELECTRICAL |
| 24.1 | Site Conduit & Electrical Cables |
| 24.2 | Transformer |
| 24.3 | Pull Vaults |
| 24.4 | EV Charging Station |
Division Total Lump Sum 1 L.S.Q
| 25.0 | WATER DISTRIBUTION |
| 25.1 | Facility Water Distribution |
| 25.2 | Water Station |
Division Total Lump Sum 1 L.S.Q
| 26.0 | SITE IMPROVEMENTS & AMMENITIES |
| 26.1 | Flag Pole |
| 26.2 | Bike Parking |
| 26.3 | Three Panel Kiosk |
| 26.4 | Single Panel Kiosk |
| 26.5 | Entrance Gate |
| 26.6 | Site Signage |
| 26.7 | Wildlife Tracks |
| 26.8 | Miscellaneous Site Improvements |
Division Total Lump Sum 1 L.S.Q
| Utility Trench |
| 27.0 | UTILITY TRENCH COMPLETE |
| 27.1 | Pull Vaults |
| 27.2 | Utility Trench Complete |
| 27.3 | Directional Boring |
| Division Total | Lump Sum | 1 | L.S.Q | |
| TOTAL (of Divisions 1-27) | | | | $ |
OPTIONAL/ALTERNATE BID ITEMS
| Optional/Alternate Bid No. 1 | | | |
| AB-1 | PAVING DAY-USE & RV PARKING AREA | Lump Sum | 1 | L.S.Q |
| Optional/Alternate Bid No. 2 | | | |
| AB-2 | PAVING EMPLOYEE PARKING & ACCESS ROAD | Lump Sum | 1 | L.S.Q |
| Optional/Alternate Bid No. 3 | | | |
| AB-3 | LANDSCAPING & IRRIGATION | Lump Sum | 1 | L.S.Q |
| AB-3.1 | Trees | | | |
| AB-3.2 | Shrubs | | | |
| AB-3.3 | All Other Landscaping | | | |
| AB-3.4 | Irrigation | | | |
| Optional/Alternate Bid No. 4 (Deductive Bid Item) | | | |
| AB-4 | CENTURY LINK UTILITIES | Lump Sum | 1 | L.S.Q |
| Delete 2" conduit for fiber (UFO), pull boxes and connection to Bend Broadband utility as shown on sheets C3.1, C3.2, C3.3, E1.1. Coordinate with Century Link, Joe Dairy (541-233-9820) so Century Link can install a 4" conduit and pull boxes in the trench from ~ Sta 27+00 to Sta 1+77. From Sta 1+77 into building, Contractor to install 4" conduit with 2 pull ropes and Oldcastle 25-TA concrete pull boxes with steel covers at each 90 degree bend and max distance of 75 feet. Bring 4" conduit into IT room 104 as shown on sheet T3.1, replacing the 2" conduit for utility shown with the 4" conduit. Extend 4" conduit 3-feet above floor. | | | |
| Optional/Alternate Bid No. 5 (Deductive Bid Item) | | | |
| AB-5 | BENDBROADBAND INSTALLATION OF UTILITIES | Lump Sum | 1 | L.S.Q |
| Delete 2" conduit for fiber (UFO), pull boxes and connection to Bend Broadband Utility as shown on sheets C3.1, C3.2, C3.3, E1.1. Coordinate with Bend Broadband, Sandy Morse (541-312-6601), so Bend Broadband can install the 2" conduit and pull boxes in the trench from their pole near hex note 3 on sheet C3.3 to Sta 1+77. From Sta 1+77 to building Contractor to install 2" conduit, pull boxes and pull rope as specified in the contract package. Extend 2" conduit 3-feet above floor in IT room 104. | | | |
| Optional/Alternate Bid No. 6 | | | |
| AB-6 | Rock Excavation | Lump Sum | 1 | L.S.Q |
| AB-6.1 | Rock Excavation, trenching | AQ | 1000 | LFT |
| AB-6.2 | Rock Excavation, vertical excavation | AQ | 10 | CY |
| Optional/Alternate Bid Total | $ |
| cbfa 0820 | GRAND TOTAL | $ |