1.Welcome_Station_RFP.pdf

PDF 606 KB Posted

Attached to
Construction of Cascade Lakes National Scenic Byway Welcome Station
Solicitation number
AG-04GG-S-14-0002
Issued by

About this file

Request for Proposals

View the file

Other files

File Type Posted
Amendment_5_Septic_Site_Eval_F-24008.pdf PDF
Amendment_5_narrative.docx DOCX document
Amendment_5_SF-30.doc DOC document
Amendment_4_Well_Location.pdf PDF
Amendment_4_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_4_SF-30.doc DOC document
Amendment_4_8-20.docx DOCX document
Amendment_3_260902-SubmersibleLevelTransmitter-20110512.doc DOC document
Amendment_3_Interior_Finishes_Schedule.pdf PDF
Amendment_3_260573-OvercurentProtectiveDeviceCoordinationStudy.docx DOCX document
Amendment_3_specs_for_hydroseeding_and_soil_prep.docx DOCX document
Amendment_3_Addendum.docx DOCX document
Amendment_3_DeschutesDoubleGateLayout2014.pdf PDF
Amendment_3_260900-ControlsAnd_instrumentation-20140806.doc DOC document
Amendment_3_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_3_Bid_Bond_Form_SF_24.pdf PDF
Amendment_3_SF-30.doc DOC document
Amendment_2_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_2_EFS_1.pdf PDF
Amendment_2_7th_Mountain_Pit.pdf PDF
Amendment_2_USFS_CLWS_IFS-1.pdf PDF
Amendment_2_8-4.docx DOCX document
3.Welcome_St_All_Dwgs_in_Order.pdf PDF
5.Technical_Evaluation_Questionnaire.docx DOCX document
6.Fire_Clauses.pdf PDF
7.Welcome_Station_Wage_Rates_OR25_dvb.mht MHT file
4.Welcome_Station_Bidders_Packet2.docx DOCX document
2.WelcomeStAllSpecs0718.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-04GG-S-14-0002

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

07/18/2014

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

Ochoco National Forest 3160 NE 3rd Street Prineville, OR 97754

Ochoco National Forest 3160 NE 3rd Street Prineville, OR 97754 ATTN: Cyndy Armour

9. FOR INFORMATION

CALL

A. Cyndy Armour, Contracting Officer

B. Zac Hiedeman, COR

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) A. 541-416-6662, B. 541-383-5615

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Cascade Lakes Scenic Byway Welcome Station

DESCHUTES NATIONAL FOREST

Estimated Price Range: $1,000,000 to $5,000,000.

This is being Set-Aside 100% for Small Business in accordance with FAR 19.5

PLEASE NOTE – PROPOSALS ARE REQUIRED FOR THIS PROJECT – SEE SECTIONS L & M

PROPOSALS ARE DUE AUGUST 18, 2014 BY 1630. Last date RFI’s will be accepted AUGUST 11, 2014 at 1630

PLEASE SEE SECTION L-9 FOR PRE-PROPOSAL SITE VISIT INFORMATION

**RETURN PROPOSALS AS DIRECTED IN BLOCK 8 ABOVE TO THE OCHOCO NATIONAL

FOREST 3160 NE 3rd STREET, PRINEVILLE, OR 97754, ATTN: Cyndy Armour, IDENTIFY EACH

OFFER WITH THE SOLICITATION NUMBER AND PROJECT NAME ON THE OUTSIDE OF YOUR

ENVELOPE**

11. The Contractor shall begin performance within 10 calendar days and complete it within SEE F-2 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

10 days

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offers in (1 original & 2 copies) of the completed, signed offer and business proposal and (1 original & 3 copies) of the technical proposal to perform the work required are due at the place specified in Item 8 by 4:30pm (hour) local time 08/18/2014 (date). Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17.The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return 1 copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on solicitation is hereby accepted as to the items listed. This award consummates the contract, which cons of (a) the Government solicitation and your offer, and (b) this contract award. No further contrac document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

Cascade Lakes Scenic Byway Welcome Station Solicitation #AG-04GG-S-14-0002 Deschutes National Forest

SECTION B - SUPPLIES OR SERVICES AND PRICES SCHEDULE OF ITEMS

Name of Offeror or Contractor

Cascade Lakes Welcome Station ‐ SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

METHOD

OF

MEASURE

QUAN.

UNIT

TOTAL

BASE BID ITEMS

1.0 GENERAL REQUIREMENTS

1.1 Mobilization/De-Mobilization

1.2 Testing & Inspections

1.3 General Requirements

1.4 Contractor Required Insurance

1.5 Bid, Payment and Performance Bond

1.6 Document Submittal Service

Division Total Lump Sum 1 L.S.Q

Buildings

2.0 CONCRETE

2.1 Cast-in-Place Concrete

2.2 Architectural Pre-Cast Concrete

3.0 MASONRY

3.1 Unit Masonry Assemblies

3.2 Stone Masonry Veneer

4.0 METALS

4.1 Metal Fabrications

4.2 Gratings

5.0 WOOD & PLASTICS, AND COMPOSITES

5.1 Rough Carpentry

5.2 Sheathing

5.3 Structural Glued-Laminated Timber

5.4 Exterior Finish Carpentry

5.5 Interior Finish Carpentry

5.6 Interior Architectural Woodwork

6.0 THERMAL & MOISTURE PROTECTION

6.1 Water Repellants

6.2 Building Insulation

6.3 Asphalt Shingles

6.4 Sheet Metal Flashing and Trim

6.5 Joint Sealants

7.0 OPENINGS

7.1 Flush Wood Doors

7.2 Access Doors and Frames

7.3 Wood Patio Doors

7.4 Wood Windows

7.5 Unit Skylights

7.6 Door Hardware

7.7 Glazing

8.0 FINISHES

8.1 Gypsum Board

8.2 Acoustical Panel Ceilings

8.3 Reclaimed Wood Flooring

8.4 Resilient Wall Base and Accessories

8.5 Linoleum Composition Flooring

8.6 Carpet Tile

8.7 Painting

9.0 SPECIALTIES

9.1 Signage

9.2 Toilet and Bath Accessories

9.3 Fire Protection Cabinets

9.4 Fire Extinguishers

10.0 EQUIPMENT

10.1 Residential Appliances

11.0 FURNISHINGS

11.1 Horizontal Louver Blinds

12.0 FIRE SUPPRESSION

12.1 Fire Protection

13.0 PLUMBING

13.1 Plumbing Materials and Methods

13.2 Plumbing Insulation

13.3 Plumbing Piping

13.4 Plumbing Fixtures

14.0 HEATING, VENTILATION, AND AIR CONDITIONING

14.1 Common HVAC Materials and Methods

14.2 Testing, Adjusting and Balancing

14.3 HVAC Insulation

14.4 Refrigerant Piping System

14.5 Air Distribution

14.6 HVAC Fans

14.7 Packaged HVAC Units

15.0 ELECTRICAL

15.1 Basic Methods & Materials

15.2 Electrical Power Conductors and Cables

15.3 Grounding and Bonding for Electrical Systems

15.4 Hangers and Supports for Electrical Systems

15.5 Raceway and Boxes for Electrical Systems

15.6 Identification for Electrical Systems

15.7 Lighting Control Devices

15.8 Low Voltage Lighting Control Panels

15.9 Service Entrance

15.10 Panel boards

15.11 Wiring Devices

15.12 Circuit Protective Devices

15.13 Transient Voltage Suppression

15.14 Lighting

16.0 COMMUNICATIONS

16.1 Telecommunications Wiring Systems

16.2 Wall Mount Equipment Rack & UPS

17.0 ELECTRONIC SAFETY AND SECURITY

17.1 Intrusion Detection System

17.2 Access Control System

17.3 Fire Alarm and Detection System

Division Total Lump Sum 1 L.S.Q

Site Work

18.0 EARTHWORK

18.1 Site Clearing

18.2 Earth Moving

18.3 Termite Control

19.0 EXTERIOR IMPROVEMENTS

19.1 Asphalt Paving

19.2 Concrete Paving

19.3 Concrete Unit Pavers

19.4 Boulders and Boulder Placement

19.5 Rock Walls

19.6 Gravel Paths

20.0 UTILITIES

20.1 Water Supply Well

21.0 SANITARY SEWER & VAULT TOILET

21.1 Facility Sanitary Sewer

21.2 Facility Septic Tank

21.3 Concrete Vault Toilet

22.0 STORM DRAINAGE

22.1 Retention Ponds

22.2 Rain Gardens

22.3 Storm Drainage Piping

23.0 DRYWELL ASSEMBLY

23.1 Water Station Drainage Drywell

23.2 Pumphouse Drywell Assembly

24.0 SITE ELECTRICAL

24.1 Site Conduit & Electrical Cables

24.2 Transformer

24.3 Pull Vaults

24.4 EV Charging Station

25.0 WATER DISTRIBUTION

25.1 Facility Water Distribution

25.2 Water Station

26.0 SITE IMPROVEMENTS & AMMENITIES

26.1 Flag Pole

26.2 Bike Parking

26.3 Three Panel Kiosk

26.4 Single Panel Kiosk

26.5 Entrance Gate

26.6 Site Signage

26.7 Wildlife Tracks

26.8 Miscellaneous Site Improvements

Utility Trench

27.0 UTILITY TRENCH COMPLETE

27.1 Pull Vaults

27.2 Utility Trench Complete

27.3 Directional Boring

TOTAL (of Divisions 1‐27) $

OPTIONAL/ALTERNATE BID ITEMS

Optional/Alternate Bid No. 1

AB‐1 PAVING DAY‐USE & RV PARKING AREA Lump Sum 1 L.S.Q

Optional/Alternate Bid No. 2

AB‐2 PAVING EMPLOYEE PARKING & ACCESS ROAD Lump Sum 1 L.S.Q

Optional/Alternate Bid No. 3

AB‐3 LANDSCAPING & IRRIGATION Lump Sum 1 L.S.Q AB-3.1 Trees AB-3.2 Shrubs AB-3.3 All Other Landscaping AB-3.4 Irrigation

Optional/Alternate Bid Total $ cbfa 7/16

GRAND TOTAL $

SECTION C--DESCRIPTION/SPECIFICATIONS

C.1 DESCRIPTION OF WORK

The purpose of this contract is to procure the services of a construction contractor to build a 2,083 sq. ft.

single story, stick framed building with composite roofing. The Welcome Station will provide scenic byway information, general recreation and Forest information and conservation education through interpretive displays. The facility will be Architectural Barriers Act (ABA) compliant, energy-efficient, and designed to have a low impact footprint on the site. The structure will be compatible with the surrounding environment, visible from the National Scenic Byway, and compliment with the surrounding landscape character.

The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., concrete with fly ash), that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials (e.g., insulating foam and composite panels), and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered. All supplies and materials shall be of a quality that conforms to applicable Federal specifications and standards. All supplies and materials to be used in performance of work described herein are subject to the approval of the technical representative (COR).

C.2 PROJECT LOCATION

The Welcome Station is located near the junction of the Cascade Lakes National Scenic Byway – Century Drive/County Highway 46 and Conklin Road/Forest Service Road 41. Township 18S, Range 11E, Section 21 SE, WM.

C.3 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, materials, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in all Sections of this contract and the attachments referenced in Section J.

C.4 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.5 APPLICABLE SPECIFICATIONS (CSI Projects)

The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.

C.6 FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE

GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL

ITEM DESCRIPTIONS (JUN 1988)

The specifications cited in this solicitation may be obtained from:

Specification Address AASHTO Standards American Association of State Highway and Transportation

Officials 341 National Press Building Washington, DC 20024

ACI American Concrete Institution Box 19150 Redford Station Detroit, MI 48219

ASTM Standards American Society for Testing Materials 1916 Race Street Philadelphia, PA 19103

(215) 199-5462

AWPA American Wood Preservers Association PO Box 849 Stevensville, MD 21666

FS Federal Specifications (GSA) Building 197, Washington Navy Yard, SE Washington, DC 20407

MUTCD Manual on Uniform Traffic Control Devices Superintendent of Documents U.S. Government Printing Office Washington, DC 20402

The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation. The above references include but are not limited to all applicable specifications.

SECTION D--PACKAGING AND MARKING {For this Solicitation, there are NO clauses in this

Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 INSPECTION AND TESTING PERFORMED BY GOVERNMENT

The Government will perform sampling, testing, and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.

E.2 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross-sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.

E.3 FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/comp/far/index.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than December 30, 2015 The time stated for completion shall include final cleanup of the premises. Work is estimated to commence September 01, 2014.

F.3 AGAR 452.236-76 SAMPLES AND CERTIFICATES (FEB 1988)

When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements. Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.

F.4 REQUIRED SUBMITTALS

The following is a general summary of the required submittals. Other submittals are required as specified elsewhere in this contract.

Title Referenced By Specification No.

Time of Government Approval after Submittal

Schedule of Work Section F Prior to Notice to Proceed

Job Specific Safety Plan Section H Prior to Notice to Proceed

Copy of Required Section H Prior to Notice to Proceed Insurance coverage

Notification of Section G Prior to subcontractor starting work Subcontracting

Fire Plan Section J Prior to Notice to Proceed

Release of Claims Form Section I Prior to final payment

Material Certifications, Section C/ Prior to on-site work Testing Reports & Other Specifications item installation or as required Submittal per Division

Submittal requirements for this Project are EXTENSIVE. They include, but are not limited to: Biobased and Recovered materials requirements, Product Data, Product Schedules, Traffic Control, Shop Drawings, Mock-ups, Samples, Material Certifications, Testing Reports, Record Drawings, Operation & Maintenance Manuals, Commission Reports, and Warranties. Individual Sections in the specifications detail most, but not all, submittals requirements for this contract. Other submittals requirements may be contained in the Drawings or otherwise referenced. It is the contractor’s responsibility to capture all the required submittals, shop drawings, certifications, testing reports, etc.,as required for this Project, and develop a Submittal Schedule for approval by the Contracting Officer as described in Section 01 3300 Shop Drawings, Product Data, and Submittals. See Submittal list in Section 01 3300.

F.5 PRODUCT SUBSTITUTION

Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitution will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

A. Submit separate request for each substitution on an approved form. Support each request with:

1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:

a. Product identification, including manufacturer's name and address.

b. Manufacturer's literature; identify:

1) Product description

2) Reference standards

3) Performance and test data

F.6 SUBMITTAL FORMAT

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Name of Contractor, subcontractor, supplier, and manufacturer.

4. Specification section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor's stamp, initial or signature, certifying the review of the submittal, verification of field measurements and compliance with contract documents.

8. Provide all submittals within 14 calendar days of the contract award unless otherwise required by the specification.

Submittals shall be sent to the Contracting Officer’s Representative (COR)

F.7 MAINTENANCE FOR TRAFFIC

Work which interferes or conflicts with traffic, shall NOT be performed until a plan for the satisfactory handling of traffic has been submitted by the contractor and approved by the Deschutes Country Road Department and the Contracting Officer. Contractor is responsible for working with Deschutes County Road Department to get any approvals for road closure or delay of traffic while working on this project.

Prior to any suspension of work, the contractor shall take such precautions as may be necessary to prevent damage to the project, such as temporary detours, barricades, approaches, crossings or intersections.

Any maintenance attributable to use, or necessary during suspensions resulting from fault or negligence of the contractor, shall be the contractor’s responsibility.

F.8 SUSPENSIONS FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for equitable adjustment.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A mandatory post award conference with the successful Contractor is required. The conference will be held at the Deschutes National Forest Headquarters Building, 63095 Deschutes Market Rd. Bend, Oregon within 15 days of award.

G.2 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract:

Description Drawing Reference Number Entry Sign USFS Shield Logo (2 each) USDA Sign (2 each) Optional Management Strategy Sign Interpretive Signs 51”H x 50” W x 26” D Free Standing Display Rack 48” H x 48” W Slat Panel Touch Screen Display Paper Towel Dispenser (1 each) Toilet Paper Dispenser (1 each) Countertop Mounted Soap Dispenser (1 each) Printer/Scanner/Copier (1 each) USFS Shield Logo (1 each) 50” LED Monitor (1 each) 60” x 48” Slatwall Panel (1 each)

A1.2 A1.2 A1.2 A1.3 A1.4 A2.1 A2.1 A2.1 A5.1 A5.1 A5.1 A5.1 A5.1 A5.1 A5.2

G.3 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer designates the Contracting Officer's Representative (COR). The Contracting Officer’s Representative is responsible for administering the performance of work under this contract.

In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed, as soon as possible, of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the Contracting Officer’s Representative, provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the Contracting Officer’s Representative requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the Contracting Officer’s Representative persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

Contracting Officers Representative:

Name: Zacary Hiedeman Phone: 541-383-5615

G.4 CONTRACT RELEASE

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.

Reservations:______________"

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 SITE SAFETY PLAN

The awarded contractor shall submit a written site specific Site Safety Plan to ensure safety compliance when coordinating construction activities. The intent is to use this plan as a basis for evaluation and discussion at the pre-work and subsequent meetings to insure safe contractor operations. It will also be used as the safety standard during the course of the construction project. Site Safety Plan is due at the pre-work meeting with the awarded contractor.

H.2 LANDSCAPE PRESERVATION

(a) The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Prevention of Oil Spills: If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States. If a spill of petroleum product should occur in water, the Contractor shall immediately notify the COR and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124.

H.3 FAR 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION

(JAN 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective—

(1) For such period as the laws of the State in which this contract is to be performed prescribe; or

(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

H.4 AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

H.5 AGAR 452.236-74 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION

(NOV 1996)

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

H.6 CONTRACTOR'S USE OF EXISTING ROADS

The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.

The roads authorized for use will be subject to the following general conditions:

1) State laws governing traffic rules and equipment requirements on State and County Highways.

2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.

3) Roads in the project work area necessary to complete the project are designated as "within the immediate construction project" for consideration under ORS 767.025 as to the non-applicability of PUC requirements.

The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.

H.7 ROAD USE AND MAINTENANCE

In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage, to safeguard soil and water quality, and to repair damage commensurate with his use, the Contractor shall perform road maintenance work on these roads in accordance with the following:

(1) While performing ordinary road maintenance work, the Contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources. The Contractor shall avoid blading surface material off the surface of roads.

(2) While performing all phases of construction, the Contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the Contractor shall restore the road to its prior condition within a reasonable period of time.

(3) The Contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.

(4) On completion and acceptance of work requirements, including acceptance of road maintenance by the Forest Service, Contractor road maintenance responsibility shall terminate.

The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, leave all travel ways in a condition suitable for traffic.

Any traffic delays anticipated on County Road 41 must be coordinated and approved by the Deschutes Country Road Department and the Contracting Officer.

H.8 TRAFFIC CONTROL and TRAFFIC CONTROL PLAN

Suitable warning signs shall be provided to properly control and direct traffic. All road barricades, warning signs, and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administrations and applicable safety codes. Contractor shall coordinate all excessive use or planned blockages of County Road 41 with the Deschutes County Road Dept.

A traffic control plan is required to be presented at the post-award meeting with the awarded Contractor.

H.9 SPECIFIC WORK REQUIREMENT

As provided for in the CSI Specifications, and as shown on the drawings.

H.10 AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996)

(a) Contractor's Responsibility For Fighting Fire. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agent or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

H.11 CERTIFICATION OF COMPLIANCE

Contractor shall certify compliance with specific fire precautionary measures included in the attached Fire Protection and Suppression Forms. The certification shall be made prior to commencement of work and shall be updated if at any time during performance the conditions change.

The Government reserves it’s unilateral right to conduct verification inspections to ensure Contractor's compliance.

H.12 NOXIOUS WEED CONTROL

(a) In order to prevent the potential spread of noxious weeds into the Deschutes National Forest, the Contractor shall be required to furnish the Government with proof of weed-free equipment.

(b) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Oregon Department of Agriculture or by other appropriate agencies having jurisdiction.

(c) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the contractor or subcontractor.

(d) Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose. Cleaning shall occur off Federal lands.

(e) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspection will take place at a location designated by the Forest Officer in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection. Materials to be used on the project will be delivered to the job site following the inspection. Materials to be used on the project will be delivered to the project after inspection and approval.

(f) Certification shall remain valid for each identified piece of equipment or vehicle only for the duration of the specified project and only as long as the vehicle or equipment remains at the job site.

Equipment and vehicles (excepting passenger vehicles - this includes pickups and vans) that leave the job site will need to be re-certified as weed free before they are allowed to return to the job site or re-enter the National Forest.

H.13 FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

H.14 POTENTIAL SAFETY HAZARDS

(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ x] Temporary excavation/deep trenching/slope stability [x ] Tree falling [ x] Fall hazard from work heights exceeding six feet [ x] Traffic control on high-volume and/or high-speed and/or limited visibility roads [x ] Heavy equipment operation [ x] Fire hazards [ x] Hazardous materials handling [x ] Electrical hazard [ x] Hydraulic and/or pneumatic and/or other high pressure hazards [ x] Mechanical hazards such as pulleys, springs, etc.

[ ] Other __________________________________

H.15 FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR

Part 1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any

Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.

Alternate I (Nov 1991). If the contract will involve (a) work of a long duration or hazardous nature, or

(b) performance on a Government facility that on the advice of technical representatives involves hazardous materials or operations that might endanger the safety of the public and/or Government personnel or property, add the following paragraph (f) to the basic clause:

(f) Before commencing the work, the Contractor shall—

(1) Submit a written proposed plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards; and

(2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

H.16 SALVAGE RIGHTS OF TIMBER

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

H.17 CONTROL OF MATERIAL

A. Rights In and Use of Materials: The Contractor may use on the project suitable stone, gravel, or sand encountered in the excavation.

B. Excavation: Unclassified.

C. Material Sources:

1. Borrow sources, if needed, must be approved in advance by the Engineer. Such borrow sources shall be restored to a natural appearance. Commercial sources of material must be approved by the Forest Service and certified as noxious weed free before any hauling may start.

We don’t anticipate any borrow from Forest Service sources.

2. Native timber material used in construction shall not be taken within sight of any road or trail.

Stumps resulting from tree cutting shall be no more than six (6) inches in height. All debris resulting from preparation of the native timber for use, shall be scattered not more than four (4) inches in depth and out of meadows, stream courses, lakes and ponds.

3. Rocks and mineral soil excavated within the normal excavation shall be conserved and used as needed.

D. Storage and Stockpiling of Materials: Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection.

Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at the Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.

E. Local Disposal Sites: Designated disposal sites for this project have yet to be determined.

F. Earthwork Tolerances: Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

H.18 CONSTRUCTION STAKES, LINES, AND GRADES

(a) The Contractor shall do all further surveying, staking, and engineering to establish the horizontal and vertical control necessary to result in having the finished work comply with the lines and grades shown on the Drawings or stated in the specifications. This work is incidental to the pay items.

(b) If any construction control points have been destroyed or displaced, or are erroneous, the Contractor shall promptly notify the Engineer.