Amendment_5_SF-30.doc

DOC document 41 KB Posted

Attached to
Construction of Cascade Lakes National Scenic Byway Welcome Station
Solicitation number
AG-04GG-S-14-0002
Issued by

About this file

Amendment 5 - SF 30

View the file

Other files

File Type Posted
Amendment_5_Septic_Site_Eval_F-24008.pdf PDF
Amendment_5_narrative.docx DOCX document
Amendment_4_Well_Location.pdf PDF
Amendment_4_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_4_SF-30.doc DOC document
Amendment_4_8-20.docx DOCX document
Amendment_3_260902-SubmersibleLevelTransmitter-20110512.doc DOC document
Amendment_3_Interior_Finishes_Schedule.pdf PDF
Amendment_3_260573-OvercurentProtectiveDeviceCoordinationStudy.docx DOCX document
Amendment_3_specs_for_hydroseeding_and_soil_prep.docx DOCX document
Amendment_3_Addendum.docx DOCX document
Amendment_3_DeschutesDoubleGateLayout2014.pdf PDF
Amendment_3_260900-ControlsAnd_instrumentation-20140806.doc DOC document
Amendment_3_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_3_Bid_Bond_Form_SF_24.pdf PDF
Amendment_3_SF-30.doc DOC document
Amendment_2_DetailScheduleItems.xlsx XLSX spreadsheet
Amendment_2_EFS_1.pdf PDF
Amendment_2_7th_Mountain_Pit.pdf PDF
Amendment_2_USFS_CLWS_IFS-1.pdf PDF
Amendment_2_8-4.docx DOCX document
3.Welcome_St_All_Dwgs_in_Order.pdf PDF
5.Technical_Evaluation_Questionnaire.docx DOCX document
6.Fire_Clauses.pdf PDF
7.Welcome_Station_Wage_Rates_OR25_dvb.mht MHT file
4.Welcome_Station_Bidders_Packet2.docx DOCX document
2.WelcomeStAllSpecs0718.pdf PDF
1.Welcome_Station_RFP.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE
PAGE OF PAGES

1 1

2 AMENDMENT NO.

#5

3. EFFECTIVE DATE

August 25, 2014

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Ochoco National Forest 3160 NE Third St.

Prineville, OR 97754 Attn: Cyndy Armour Deschutes National Forest Zak Hiedeman - COR

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)

9A.Amend Solicitation. Cascade Lakes Welcome Station

9B.Dated: July 18, 2014

10A.Mod Contract/Order

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X ] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority)

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

XX
D Other: (Specify type of modification and authority):

FAR 52.243-4 Changes (Amendment to solicitation)

E. IMPORTANT: Contractor [ ] is not [ X ] is required to sign this document and return 1_ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Clarification of due date of Offers, septic site evaluation and some revisions.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Cynthia B. Armour - Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED
16B.UNITED STATES OF AMERICA

/S/ Cynthia B. Armour

16C.DATE SIGNED

08/25/2014

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

File details come from the government source that posted it. Updated .