Notice text
12 versions
Update #12 · Latest ·
The Draft RFP for the GSM-ETI requirement (HC1028-10-R-2001) will be replaced by a Final RFP for the GSM-ETI requirement to be released 19 April 2011 on FedBizOpps.
Update #11 ·
This 19 April 2011 notice is being issued to provide Release #4 - Questions/Answers that have been received in response to the Draft RFP for the GSM-ETI effort. Release #4 - Questions/Answers is attached to this notice.
Update #10 ·
This 11 March 2011 notice is being issued to provide Release #3 - Questions/Answers that have been received in response to the Draft RFP for the GSM-ETI effort. All questions received in response to the Draft RFP have been responded to.
Release #3 - Questions/Answers
QUESTION #148: I spoke with Katie Prisuta this morning. She verified that the CD is classified at the SECRET level, so we do need a DD254 indicating that safeguarding is required in order to pick it up. Will you call the contracting officer again?
1. The vendor holds a Top Secret facility clearance and while we have a facility capable of holding classified material, we do not currently have authority to receive and safeguard classified material.
2. In order to store the classified CD required for GSM-ETI, we need a DD-254 that provides the vendor with the authority to receive and safeguard Secret material. The current DRAFT DD-254 in the solicitation is marked
DRAFT, is not signed, and is not directed to the vendor. DSS will not accept this document as authority for the vendor to receive and safeguard Secret material.
3. The NISPOM requires that the Government provide prospective bidders with a DD-254 in order to store classified material associated with an acquisition.
4. The vendor is requesting a signed DD-254 from DITCO so that we can request DSS to certify our storage room and receive classified material associated with this program.
ANSWER #148: According to DISA Industrial Security, the updated DD254 (provided as attachment to this FedBizOpps notices) is sufficient to allow the vendors/contract awardee(s) to process appropriate paperwork to DSS to allow receipt and storage of classified materials
QUESTION #149: Request clarification to answer provided at #88; where the Government stated that the P&S source (to be provided via existing GSA Alliant sources) will be used for support capabilities that are functional niche type work (e.g. training services, cryptographic support, software development). Will the COMSEC role in P&S be primarily administrative and, as such, tie closely with work in support of the DISN Controlling Authority; or will the P&S role for COMSEC be much greater to include not only the administrative, but also include COMSEC engineering, key management, secure storage of encryptors, cradle to grave support to CCI units, deployment and implementation support, etc.? Suggest that the Government reconsider revising the GSM-ETI SOO to include the latter the engineering, key management, secure storage of encryptors, cradle to grave support to CCI units, deployment and implementation support and leave the administrative work in support of the DISN Controlling Authority with the P&S source.
ANSWER #149: The GSM P&S vehicle will be used for COMSEC support to the controlling authority, to include training, key management, and storage. The GSM-O vehicle will be used to support the maintenance of crypto devices and the GSM-ETI vehicle will be used to support engineering and installation of new crypto devices (when associated with build-out events that fall under the auspices of a GSM-ETI project).
A revised DD 254 is provided as an attachment to this notice.
Update #9 ·
NOTICE TO PROSPECTIVE OFFERORS - INTENT TO RELEASE FINAL RFP
The Defense Information Systems Agency/Defense Information Technology Contracting Organization (DISA/DITCO)-Scott AFB, IL anticipates release of the Final RFP - HC1028-10-R-2001 - Global Information Grid (GIG) Service Management Engineering, Transition, and Implementation (GSM-ETI) on/or about 21 March 2011. DISA/DITCO intends to award multiple Indefinite Delivery/Indefinite Quantity (IDIQ) contracts which will be set aside for small business concerns in conjunction with the policies and procedures prescribed in Federal Acquisition Regulation (FAR) Part 15 Contracting by Negotiation.
This acquisition includes the engineering, transition, and implementation support services needed to successfully address the Defense Information Systems Network (DISN) requirements to add new telecommunications technologies to address changing joint Warfighter needs. The functional scope of the ETI services includes the following capability areas to support DISA-provided networks and infrastructure on a global basis:
-Engineering to include systems engineering and integration; architecture and information and telecommunications standards development; and telecommunications, network security, and information systems engineering.
-Transition. (New capabilities that are engineered and implemented under the GSM-ETI effort will be transionted to the GSM-Operations contract for continuing support).
-Implementation to include technical refresh, circuit transition and DISN expansion/upgrades.
The Final RFP and all related documents will be posted at this site. Instructions for submitting questions and proposals will be given at the time the solicitation is released. Contractors will be given 45 days for preparation of proposals from the posting date of the Final RFP. Past Performance questionnaires will be due no later than the date indicated on the past performance document.
The National American Industrial Classification Standard (NAICS) code for this procurement is designated as 541512 - Computer Systems Design Services. The resulting awards will be Best Value with Trade-Off, with non-cost factors being significantly more important than cost. The period of performance for the GSM-ETI will include a base period of two years, one two-year option period and one one-year option period for a total life-cycle of five years. Services will be required on a world-wide basis.
If at any time the Government determines that the requested services are no longer required, the Government reserves the right to not make an award.
NOTE: The Draft RFP currently on the FedBizOpps site (to include amendments and attachments) will be replaced in its entirety with the Final RFP documentation.
All inquiries regarding this requirement shall be submitted electronically and directed to the Contracting Officer, at DISNGSM@disa.mil.
Update #8 ·
This 04March 2011 notice is being issued to provide Release #2 - Questions/Answers that have been received in response to the Draft RFP for the GSM-ETI effort. Another release of questions/answers will be provided at a later date to respond to two pending issues.
Release #2 - Questions/Answers is attached to this notice.
Update #7 ·
This 03 September 2010 is being issued to provide responses to questions that have been received in response to the Draft RFP for the GSM-ETI effort. Another release of questions/answers will be provided at a later date. (The majority of the questions/answers received are provided in this release.)
Release #1 dated 03 September 2010 is attached to this notice.
Vendors are also strongly encouraged to obtain the updated version of the Controlled CD-ROM that is available at this time. The updated Controlled CD-ROM contains additional information that will be useful when preparing proposals. Please review the Draft RFP for the GSM-ETI effort, Section L, paragraph L.4 which provides information on how to obtain the Controlled CD-ROM.
Update #6 ·
This 16 July 2010 notice/update is to provide the following changes to attachments provided for the Draft RFP for GSM-ETI:
a. Delete the following attachments in their entirety and attachments will be moved to the controlled CD-ROM:
1) DISA CONUS SOP.doc - Methods and Procedures Global Network Operations Support Center (GNSC) Network Event Reporting, undated.
2) SKMBT_C25310051321180 - DISA CONUS Global Network Operations Support Center (GNSC) Reporting Criteria, dated 12 Oct 2006
3) DRSN OM Guide 28May08.doc. - Defense Red Switch Operations and Maintenance - DRSN OM Guide, dated 28 May 08.
b. The following attachments have been replaced with updates:
1. SOP100-55-01 GNSC TMS (Rev 1) updated 10 Sep 08 - final.doc - DISN CONUS Global Network-Operations Support Center Standard Operations Procedures for Trouble Management System Remedy, Rev 1) is replaced with SOP100-55-01 GNSC TMS (Rev2) Updated (2Mar10).doc - DISN CONUS Global Network-Operations Support Center Standard Operations Procedures for Trouble Management System Remedy, Rev 2.
2. SOP310-85-01.doc - Operations Global NetOps Support Center DISN Core Standard Security Operating Procedures for Proxy Server Ticket Creation and Administration dated 01 Jul 2008 is replaced with SOP100-85-01-Rev1.doc - Operations Global NetOps Support Center DISN Core Standard Security Operating Procedures for Proxy Server Ticket Creation and Administration dated 09 Nov 2009.
Update #5 ·
This 12 July 2010 update to the GSM-ETI draft Solicitation (HC1028-10-R-2001) is to provide the following updates to the Advisory Multi-Step Process:
a. The Offeror's "Similar Corporate Experience" submission may include data pertaining to no more than two separate teaming partners and/or subcontractors. Offeror's shall use the same "Similar Corporate Experience" template previously provided to report relevant and recent experience of the teaming partner and/or subcontractor.
b. Each submission of "Similar Corporate Experience" shall be no longer than five pages and no more than five examples shall be submitted.
c. The Government may contact the designated references to verify/validate the information provided.
d. All other information relative to the Advisory Multi-Step Process as provided in the 15 June 2010 update remains unchanged.
This amendment also provides the slides presented during the 28 June 2010 GSM AoS Pre-Solicitation Conference. Please see attached documents.
Update #4 ·
This 02 July 2010 update is to provide the following:
1. Revised OCI language. When submission of a Mitigation Plan is necessary due to a potential, perceived or actual OCI; early submission of the plan is encouraged as the Offeror must have an acceptable and Government approved Mitigation Plan established prior to contract award. The Prime Contractor is responsible for submitting a Mitigation Plan when a potential, perceived or actual OCI exists with a subcontractor, teaming partner; etc.
a. Section H, Paragraph H.28 is revised to reflect the following:
H.28 ORGANIZATIONAL CONFLICT OF INTEREST (OCI)/MITIGATION PLAN. A conflict of interest (COI) occurs when an individual or organization is involved in multiple interests, one of which could possibly corrupt the motivation for an act in the other. The Government seeks to acquire unbiased advice and/or goods and services from Offerors/Contractors that are free from, or have mitigated, such conflicts.
b. In order for the Government to try to prevent conflicting roles that might bias a Contractor's judgment or objectivity and potentially create a competitive advantage for that Contractor, the parties to this contract agree that the Contractor's future contracting with the Government shall be restricted as outlined in FAR Subpart 9.5, Organizational Conflicts of Interest, and as provided in this clause.
c. DISA will not intentionally exclude a vendor from a competitive acquisition due to a perceived OCI. The Contracting Office is committed to working with potential vendors to eliminate or mitigate potential, actual and perceived OCI situations, without detriment to the integrity of the competitive process, the DISA mission, or the legitimate business interests of the vendor community.
d. While there are no specifically-identified exclusions by type of work or by participation in other on-going DISA contracts, it is DISA's belief that an OCI may exist when the GSM-O Prime Contractor and/or its subcontractors, at any tier, their parent companies, subsidiaries, and affiliates, if any, are parties to any of the following situations:
(1) Are a Prime Contractor or Subcontractor, at any level, to another existing DISA contract (e.g., a provider of capabilities under the DATS contract; see table below) and/or
(2) Are a Prime Contractor or Subcontractor, at any level, under the existing GSA Alliant-Small Business GWAC contracts (which is to be used as DISA's source for support of the GSM-Projects and Support (P&S) requirements), and/or
(3) Become a Prime Contractor or Subcontractor, at any level, in the upcoming contract award(s) of the GSM-Engineering/Transition/Implementation (ETI) solicitation (HC1028-10-R-2001).
e. Offerors/Contractors shall submit a Mitigation Plan to the Contracting Officer which concisely describes all relevant facts concerning any past, present or current planned interest, (financial, contractual, organizational, or otherwise) relating to work to be performed under the GSM-Operations contract/task orders that has/have bearing on whether the Offeror or Contractor has a possible OCI. The Mitigation Plan shall explain how the OCI will be minimized to a level acceptable to the Government. An Offeror's Mitigation Plan shall be submitted as soon as possible. If applicable, the Government may enter into negotiations with the Offeror/Contractor to address any unresolved issues within the Mitigation Plan; these negotations are not considered discussions. Note: No contract award can be made without an approved Mitigation Plan.
f. If the Offeror or Contractor is aware, or should have been aware, of an OCI before award of this contract or any task under against the contract, and does not fully disclose that conflict to the Contracting Officer, the Government may terminate the contractor for default.
g. The Offeror or Contractor, by submitting an offer and/or signing the contract, warrants that to its best knowledge and belief, no additional facts exist relevant to a possible OCI.
h. After contract award, the Contractor shall have an ongoing obligation to make "a prompt and full disclosure" to the Contracting Officer of any OCI that arises during the performance of the contract, as well as newly discovered conflicts that existed before contract award.
i. The Mitigation Plan shall become part of the resultant contract and the Contractor shall update its Mitigation Plan within 30 days of any changes to the legal construct of the organization, subcontractor changes, or significant management or ownership changes.
j. Should an Offeror or Contractor refuse to disclose, or misrepresent, any information regarding a potential, actual or perceived OCI, one of the following remedies shall apply:
1) Disqualification for award;
2) Termination of the contract;
3) Disqualification from subsequent awards; or
4) Other remedial action as may be permitted or provided by the law or in the resulting contract
k. The following OCI Matrix provides potential Offerors/Contractors with examples of situations where Mitigation Plans may or may not be required by the Contracting Officer.
Existing Contracts | GSM-O Prime Contractor | GSM-OSub-Contractor |
DISN Global Solutions |
2 |
2 |
GSM-Operations (To be Determined) | 2 | 2 |
GSM-Projects and Support (P&S) |
2 |
2 |
DISN Network Management Support Services - Global - Associate Support Contract (DNMSS-G/ASC) |
2 |
2 |
DNMSS-G - NEC |
2 |
2 |
DISN Access Transport Services (DATS) |
2 |
2 |
DISN Transmission Services-Pacific (DTS-P) |
2 |
2 |
Joint Hawaii Information Transport System (JHITS) |
2 |
2 |
DISN Transmission Services CONUS Extension - DTS-CE |
2 |
2 |
DISN Video Teleconference Services for DOD Worldwide (DVS-G) |
2 |
2 |
EMSS Airtime Contract |
2 |
2 |
EMSS Gateway O&M |
2 |
2 |
EMSS Gateway Maintenance and Support Services Agreement (GMSSA) |
|
|
EMSS Engineering Support Services |
2 |
2 |
EMSS Provisioning |
2 |
2 |
EMSS RIWF |
2 |
2 |
DMS Sustainment |
2 |
2 |
Fiber Maintenance - Classified |
2 |
2 |
SME-PED |
2 |
2 |
Notes:
1. While each case is analyzed on its own facts, there is no generalized need for mitigation in this situation.
2. While a case-by-case analysis will be required, based on the PWS current at the time of analysis the
Offeror/Contractor will likely be required to submit a Mitigation Plan, and the Contracting Officer may
implement its own Mitigation Plan.
3. Mitigation Plan may be required.
l. The Mitigation Plan shall be included as part of the resultant contract/task order.
m. A clause, similar to H.28, must be included in all subcontracts.
--------------
b. Section I, 52.209-9000 ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (OCCI) (DEC 2005) is hereby removed.
c. Section L, Paragraph L8.7.4.5 Organizational Conflict of Interest (OCI) Mitigation Plan is changed to reflect the following:
"L8.7.4.5 Organizational Conflict of Interest (OCI) Mitigation Plan. (Reference Draft RFP HC1028-10-R-2001, Section H, Paragraph H.28. The Government requires the work product provided by the GSM-ETI Contractor be uninfluenced by suggestions that the work product(s) from other GSM contracts/task orders (i.e., GSM-O and/or GSM-P&S) or other DISA contracts unfairly benefited the non-GSM-ETI vendor. To prevent the existence of conflicting roles that might bias the GSM-ETI Contractor's judgement and/or prevent an unfair competitive advantage, the Government's preference is that the Offeror will not enter into business arrangements with any contractor awarded work on the GSM O, GSM-P&S contracts and/or other DISA contracts. In the event that the Offeror determines it is necessary to enter into a business arrangement that that could be perceived as a potential or actual conflict of interest, the Offeror shall submit an OCI Mitigation Plan describing how the potential OCI will be avoided, neutralized or mitigated based on the general rules of FAR Part 9.505 for the Contracting Officer's review and subsequent negotiation."
2. Interested Parties List (Attachment provided).
Additional Draft RFP updates are anticipated. It is the Government's intent to release information provided at the Pre-Solicitation Conference and to respond to all questions as soon as possible.
Update #3 ·
In response to the Pre-Solicitation Conference the following updates are provided:
1. The Government is revisiting the language provided in the GSM-ETI Draft RFP, Section H, Paragraph #H.28 Organization Conflict of Interest (OCI) issues. We will provide additional guidance soon and anticipate that any OCI mitigation plans be provided no later than 15 July 2010.
2. We do not anticipate any major changes from the GSM-ETI Draft RFP to the GSM ETI Final RFP.
Update #2 ·
The purpose of this notice amendment is to:
1. Advise of the relocation of the Pre-Solicitation Conference for the Global Information Grid (GIG) Services Management (GSM) Acquisition of Services (AoS);
2. Provide URL (Link) for Broadcast of the GSM AoS Pre-Solicitation Conference via Defense Connect On-Line (DCO); and to
3. Advise all interested parties that the Engineering, Transition and Implementation (ETI) services for the Global Information Grid (GIG) Services Management (GSM) program; hereinafter referred to as GSM-ETI acquisition, will be conducted using the advisory multi-step process pursuant to Federal Acquisition Regulation (FAR) 15.202.
1. The location for the GSM AoS Pre-Solicitation Conference has been moved
From: Defense Information Systems Agency
5275 Leesburg Pike, Skyline 7
Room 1N45, Falls Church, VA
To: Crowne Plaza
Old Town Alexandria
901 North Fairfax Street
Alexandria, VA 22314
Phone: 703-683-6000 Fax: 703-683-5750
www.cpoldtownalexandriahotel.com
The date for the GSM AoS Pre-Solicitation Conference remains the same as 28 June 2010. Attendees must pre-register prior to the conference. No further action is required if you have already pre-registered. The Conference will open at 0700 and the actual briefings will commence at 8:00 a.m. The Conference is expected to adjourn approximately 5:00 p.m.
2. The GSM AoS Pre-Solicitation Conference will also be broadcast via the Defense Connect On-Line (DCO). Attendees are asked to log into the Pre-Solicitation Conference prior to 8:00 a.m. DCO information, times and the URL/Link are provided as follows:
Title: GSM PreSolicitation Conference
Date: 28 June 2010
Time: 7:00 a.m. - 5:30 p.m.
URL: https://connect.dco.dod.mil/gsm06282010
A URL/Link has been established for testing accessibility as follows:
Title: GSM Connect Test
Date: Friday, 25 June 2010
Time: 9:00 a.m. thru 1:00 p.m.
URL: https://connect.dco.dod.mil/test25062010
Users must adhere to the following:
- TLS 1.0 and SSL 3.0 enabled
- SSL 2.0 disabled
- Adobe Flash Player Version 8 or later
- Intermediate Certificate (DoD CA-21) installed
-- https://www.dodpke.com/installroot/ or http://dodpki.c3pki.den.disa.mil/rootca.html.
- Connect Add-in (optional)
-- required for some hosting functions
-- can be obtained from within a Connect meeting
The Point of Contact and Contact Information for the GSM AoS Pre-Solicitation Conference DCO is:
Ms. Carolyn Dean
703-882-0802
SysAdmin info: https://www.jtfgno.mil/operations/cto/2010/CTO_10_005/Revised/CTO_10-005.pdf
DCO Help Desk
- NCES@csd.disa.mil
- DSN 312-850-3136
- Commercial 614-692-3136
- Toll Free 1-800-447-2457
3. The Engineering, Transition and Implementation (ETI) services for the Global Information Grid (GIG) Services Management (GSM) program; hereinafter referred to as GSM-ETI acquisition, will be conducted using the advisory multi-step process pursuant to Federal Acquisition Regulation (FAR) 15.202.
DISA requests that potential offerors submit information that will allow the Government to advise them about their potential as viable competitors. Potential offerors shall respond to the attachment provided with this notice/amendment titled "Similar Corporate Experience".
The contractor's response is due no later than 15 July 2010 and shall be submitted electronically (via e-mail) to DISNGSM@disa.mil. The subject of the email shall include: "GSM-ETI Advisory Multi-Step Response".
Contractors' viability will be determined based on the recency and relevancy of similar corporate experience. The criteria for recency is that the similar corporate experience must have been completed no earlier than three years prior to issuance of this notice or, for ongoing efforts, must have been in place at least nine months before the response due date. The criteria to be used to determine relevancy of similar corporate experience is as follows: 1) Delivery of end-to-end telecommunications engineering, installation and operations services worldwide; 2) Use of ITIL®, eTOM or similar processes on government contracts for delivery of installation services; 3) Experience in collaborating with other firms to provide integrated solutions; 4) Experience in engineering large networks including all aspects of these ITIL® life cycle activities: Service Design, Service Transition and Service Operations; 5) Delivery of Performance based services using IDIQ fixed prices and cost reimbursable contract types.
Contractors that the Government considers not to be viable competitors will receive, in writing, the general basis for the Government's findings. In accordance with FAR 15.202(b), those contractors will also be advised that, notwithstanding the advice provided by the Government in response to their submissions, they may participate in the resultant acquisition.
Advisory Proposal Submission Instructions
The Advisory Proposal submission consists of the Similar Corporate Experience information provided on the matrix template contained in the Attachment. Submitters shall provide at least one (1), but no more than five (5) examples of similar corporate experience. The Government may contact the designated references to verify/validate the information provided.
Update #1 ·
Draft Solicitation No. HC1028-10-R-2001 is provided for review and comments by industry. The Draft Solicitation includes the documentation describing the Defense Information Systems Agency's (DISA) Global Information Grid (GIG) Services Management - Engineering/Transition/Implementation (GSM-ETI) requirement.
The requirement for this GSM-ETI effort is to obtain performance based services to provide the support necessary to carry out required engineering, transition/implementation, integration, connection approval and IT service management activities, in support of existing DISN networking capabilities. (Please refer to the attached Statement of Objectives).
Industry is encouraged to review the documentation and provide comments. DISA will also host a Pre-Solicitation Conference to discuss the GSM Acquisition of Services (AoS) on 28 June 2010 at the DISA facility in Falls Church, VA. During the Pre-Solicitation Conference, DISA intends to discuss the scope of the GSM to include the GSM - Operations (GSM-O) requirement and the GSM-Projects and Support (GSM - P&S).
Pre-registration information for both events is detailed in the Executive Summary of this Draft RFP.
DITCO's Point of Contact for this Draft RFP are as follows:
Kathy Tullock, Contracting Officer, 618-229-9550
Amanda Hund, Contract Specialist, 618-229-9561
Tricia Singler, Alternate Contract Specialist, 618-229-9491
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Global Information Grid Services Management - Engineering, Transition and Implementation (GSM-ETI) | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity