6 - DISN Transport - GSM Pre-Sol Conf 28-6-10
1 MB Posted
- Attached to
- Cancel Presolicitation HC1028-10-R-2001
- Solicitation number
- HC1028-10-R-2001
- Issued by
-
Defense Information Systems Agency
About this file
Briefing 6 DISN Transport
Text of this file
A Combat Support Agency
Defense Information Systems Agency
DISN Transport ServicesDISN Transport Services GSM PreGSM Pre--Solicitation ConferenceSolicitation Conference
Lisa L. E. Belt
DISN Transport Services Division (NS2) 28 June 2010
Discussion PointsDiscussion Points
• DISN Transport Today
– Overview / Organization
– Optical Layer
– ATM
– LSTDM
– Timing and Sync
• DISN Transport Future Initiatives/Evolution
• Summary
CONUS: 4775.4 CONUS: 4775.4
GBSGBS EUROPE: 611.3 GBSEUROPE: 611.3 GBS
SWA: 6 GBSSWA: 6 GBS
6 x OC1926 x OC192
PACIFIC: 371.3GBSPACIFIC: 371.3GBS
Optical SwitchingOptical Switching
N x OCN x OC--192192
FEB 05
480 GBS
MAY 10
5763 GBS
DISN BackboneDISN Backbone
The Network
– Global reach and diversity
– Gateways for the Services COCOMS and computing centers
– Capacity rich
Transport ServicesTransport Services
FUNCTIONS/CONTRIBUTIONS
• Terrestrial and Satellite transmission planning, resourcing, fielding and sustainment
• DISN Optical Transport Network – three layers:
- Optical Transport System: OT’s, OADMs, Optical Line A/T’s
- Optical Digital Cross-Connect Switches forming ODXC Mesh
- SONET Multiplexing and Grooming Equipment MSPPs & M13s
• DISN Asynchronous Transfer Mode (ATM) Services Network
• DISN TDM/MUX Network (P-800, BBS Series, and
ADNX-48)
• DISA-Managed Optical Fiber with Indefeasible IRU Leases
• Leased circuits Access and Inter-nodal from commercial carriers
• Capacity planning, Bandwidth Management, Circuit Transitions
• Upgrade and enable network infrastructure that eliminates low-speed TDM and ATM services
• Maintain and expand higher rate transport services consistent with enabling technologies and service needs
• Leverage enabling technologies to achieve efficiencies in Operations, Admin, Maintenance, Provisioning, Procurement 11
99.50
99.55
99.60
99.65
99.70
99.75
99.80
99.85
99.90
99.95
100.00
2008 2009 2Q 10
Switch Trunk
Year after Year increase in Availability by .0001%
Year after Year increase in Availability by .0001%
DISN Core OTS Availability %
Transport Division (NS2)Transport Division (NS2)
Transport Division Lisa Belt, Chief
Maj Cynthia Waite, Deputy Chief
Karla Hawkins, Admin Assistant
Transport Project Management Branch
Greg Timme, Chief
NS2
NS22
Transport Business Management & Operations
Branch
John Benonis, Chief NS23
Transport Life Cycle Sustainment Branch
Paul Hinderer, Chief
NS21
Mission
Responsible for planning, resourcing, fielding, sustaining, and evolving GIG Combat
Support terrestrial and satellite transport media.
In so doing, support the networks, computing services, applications, and information services that provide Information Superiority to the Commander in Chief, Combatant
Commanders, Senior Leadership, Services, Agencies, and the Warfighter.
NETWORK HEALTH
AND EVOLUTION
NETWORK BUSINESS
FUNCTIONS
REQUIREMENTS THAT
USE/CHANGE THE NETWORK
DISN Transport OverviewDISN Transport Overview
• DISA-Managed Optical Fiber with Indefeasible IRU Leases*
• DISN Optical Transport Network (OTN) –consisting of three layers:
– Optical Transport System (OTS) with Optical Terminals, Optical
Add-Drop Multiplexers (OADMs), Optical Line Amps/Transceivers
– Optical Digital Cross-Connect (ODXC) Switches (forming the ODXC
Mesh)
– Synchronous Optical Network (SONET) Multiplexing and Grooming Equipment, including Multi-Service Provisioning Platforms
(MSPPs) and M13 Multiplexers
• DISN Asynchronous Transfer Mode (ATM) Services (DATMS) Network
• DISN Multiplexer (MUX) Network (Promina 800 and BBS Series, and ADNX-48)
• Timing and Sync Assets
• Power / UPS Systems Assets
* Fiber and amps maintained under separate contract(s)
OTS Layer: Optical Transport System
End Terminals – (E to O)
OADMs – (Optical Add/Drop Multiplexer)
OLAs - (Optical Line Amplifier)
OTS Layer: Optical Transport System
End Terminals – (E to O)
OADMs – (Optical Add/Drop Multiplexer)
OLAs - (Optical Line Amplifier)
ODXC Layer: Optical Digital Cross Connect
STS-1 Grooming
Mesh Restoration (future)
ODXC Layer: Optical Digital Cross Connect
STS-1 Grooming
Mesh Restoration (future)
MSPP Layer: Multi Service Provisioning Platform
Legacy Traffic Support
Alternate Path for IP Connectivity
Restoration for Class 2 Sites
MSPP Layer: Multi Service Provisioning Platform
Legacy Traffic Support
Alternate Path for IP Connectivity
Restoration for Class 2 Sites
DISN Class I SiteDISN Class I Site
KG
KG
CECE CE
U-PE
KG KG
C-PE
S-PET-PE DISN Network
Example
Class 1 Site
P
OTS
Patch Panel
Customer
Fiber
OC-192
10GigE
10GigE
80 OC-192
GigE
MSPP
ODXC
ARATM
TRANSPORT ASSETS:
LSTDM
Legacy Transport:
ATM: Asynchronous Transfer Mode
LSTDM: Low Speed Time Division Mux Assets
Legacy Transport:
ATM: Asynchronous Transfer Mode
LSTDM: Low Speed Time Division Mux Assets
T&S Suite
Power Systems
Transport Assets Transport Assets
• Preventive, Routine, Demand Maintenance
(HW/SW)
• Upgrade actions
• Installs/Removals ICW customer projects and network evolution
26 Countries:
CONUS 200+ Sites
EUR 42 Sites
PAC 31 Sites
SWA 9 Sites
TNX 1100/210PH7000/8000
CX 1500/1540Ciena CN4200 Metro
DWDM (Europe only)
ADNX-48Promina 800 & BBS
Series
PECO II InvertersBattery Systems
52 Emerson Vortex DC
Power systems
52 Emerson LXP DC
Power systems
ASX 1000/1200/4000
ASX200-BX
OTS – Ciena
CoreStream Agility
Cesium Beam ClocksNortel Optera 3500
HAIPE EncryptorsSafeNet Encryptors
Adtran 2600TrueTime
5600/TSG3800SSU2200
Cisco MSPP -- 15454 and 15310
Sycamore ODXC – SN9K and SN16K
Defense Information Systems Agency
CONUSCONUS
Optical
Red
DISN-Core SYSTEM Nodes Chassis Nodes
Sycamore ODXC (Single Chassis) 29 75
Cisco MSPP Chassis 255
OTS OADM 50 343
OTS Terminal 70 464
OTS OLA 308 781
Adtran 2800 352
NMS Cisco Enclave Ethernet Switches
NMS Cisco Enclave/Distribution Switches
NMS Alteron Content/LoadBalance Switches
Encryptors (SafeNets) 11
Encryptors (HAIPEs) 264
Secure Telephone Equipment (STEs) 61
Managed Nortel Optera 3500s 10
Managed Nortel Optera DSMs 13
CONUS
Black
DATMS-U CONUS
Managed Fabrics 703
Switch Chassis 337
Managed Netmods 2524
Managed Sonet Radio Devices 0
Edge Devices 254 Bulk Encryptors 0
OOBM Routers 0
OOBM Switches 0
OOBM Modems 365
Promina CONUS
Black
Nodes 208
Chassis Shelves 758
Trunk Cards 1585
PRC Cards 604
QASD Cards 885
Misc Cards 2840
Port Cards 1844
Modems 217
Dial Up Modems 190
ADNX Channel Banks 210
CSU/DSU Nests 197 Out-Of-Band Management (OOBM)
Devices 218
TrueTime 5600
Encryptors
BBS 28
DATMS-U CONUS
TrueTime 5600/TSG3800/SSU2200 141
Cesium Beam Clocks 141
DISN VisionDISN Vision
• Converged IP and optical infrastructure support multiple services at all necessary classification levels across a “Black” or “Striped” Core
• Integrated and service-driven with access to all DISN services and classification levels through a unified customer interface
• Standardized on Ethernet technology with Shared network infrastructure for all services
• Secure and highly available
• Supports data, voice and video services with predictable performance
DISN EvolutionDISN Evolution
Near term Transport Initiatives:Near term Transport Initiatives:
Tech Refresh FY 08Tech Refresh FY 08--1212
• Timing and Sync (T&S)
• Optical Refresh
• ATM Elimination
• Low-Speed TDM Elimination
• Power System Refresh
Timing & SyncTiming & Sync
• FY10: Initiative required for EOL components at 35 Sites
• FY11: All CONUS T&S configurations will be connected into the DCN to allow central and automated monitoring of the T&S operation to connect T&S components to the DCN
• FY12: R&D will be sought for new Timing and Sync technical solutions.
– Solutions identified will be used to technically refresh EOL T&S components during the mid-term spiral.
Optical RefreshOptical Refresh
• OTN is foundation of the DISN transport layer
– High-speed SONET, SDH and PDH network built on 10 Gbps optical trunking
• Technologies
– OTS—Ciena CoreStream® Agility
– Ciena CN4200 Metro DWDM (Europe only)
– Sycamore SN16000 (SN16K) ODXC and SN9000 (SN9K)
ODXC
– Cisco MSPP—15454 and 15310
– Adtran M13 (multiplexes 28 T1s into a T3).
• Goal
– OTN Expansion to Support Legacy Transition
– Replacement of EOL Components
– Migration to packet infrastructure
– Migration to Ethernet interface as standard interface
ATM Elimination StrategyATM Elimination Strategy
• Reduce ATM footprint by transitioning circuits to alternative existing or emerging DISN services
– Circuits categorized and bin solutions/work-arounds developed and approved (NS-CTO, GE)
– Remove ATM nodes with no remaining customer circuits
• No further deployment/provisioning of ATM assets
• Collapse the ATM Network
– Backhauling to Last ATM Switch Topology (LAST) when necessary
• Implementation focused planning in the form of a two day working group with customers – late July
TDM Elimination StrategyTDM Elimination Strategy
• Where feasible, migrate users off the services provided by the infrastructure to alternative services provided by newer infrastructure, such as Ethernet access to Assured IP or Layer 3 VPN, or to maintained services, such as T-1 Private Line.
– In some cases small nodes have already removed by such migrations; typically these cases involved use of T1 PL transport to move users off of lightly-loaded nodes.
• Expand alternative access mechanisms, such as Ethernet, to include sites that have only low-speed TDM or ATM equipment.
• Select, test and deploy STI equipment for remaining user circuits that cannot be migrated to alternatives in the near term.
Power SystemsPower Systems
• The following Power System equipment will reach EOL CONUS in the near-term spiral:
– 52 Emerson Vortex DC Power systems that reached EOL December 2009
– 52 Emerson LXP DC Power Systems that will reach EOL December 2010.
– 30 Peco II inverters (support network management) that are at EOL.
– 15 MGE Topaz II inverter that are at EOL.
– 40 Batteries systems that will reach EOL within the year
MidMid--Term Infrastructure Term Infrastructure Initiatives FY12Initiatives FY12--1616
• DISN OTS Technology Refresh
• DISN All-Optical Network Evolution
• MSPP and ODXC Technology Refresh
• Carrier Ethernet Migration
Transport Projects Transport Projects (beyond Sustainment)(beyond Sustainment)
• BRAC (Service and Agency wide)
• Diversity
• MDA GCN Support (Phases I and II)
• DISN STEP-TE Implementation
• AFRICOM Build-up
• AFG Expansion
• ITPA Expansion
• ANG Expansion
• COCOM HQ Moves x 3
• P-173 Move
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .