CA ERFO NP DEVA 2023-3(2) Repairs and Armoring
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF24B000010
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Death Valley, California, United States
- Points of contact
-
- Eric Grosskreuz cflcontracts@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is soliciting bids for the CA ERFO NP DEVA 2023-3(2) Repairs and Armoring project located in Death Valley National Park. The project consists of pavement patching, roadway reconditioning, armoring with gabions and revet mattresses, sign installation and replacement, and new gate installation across multiple routes in the park. Key requirements include biological and archaeological monitoring due to the presence of the desert tortoise. The solicitation will be evaluated on the basis of the contractor's ability to meet the technical specifications and project timeline, with an estimated bid range between $10,000,000 and $20,000,000.
The contract opportunity is a Total Small Business Set-Aside with an anticipated award in August 2024 and construction from August 2024 through February 2025. Significant quantities include 2,200 square yards of pavement removal, 2,500 square yards of revet mattress, 3 miles of roadway reconditioning, and 7,700 square yards of asphalt concrete pavement patching under the base schedule, with an optional schedule that adds gabion walls, additional revet mattress, and more pavement patching on Emigrant Canyon Road.
Notice text
PROJECT NUMBER: CA ERFO NP DEVA 2023 – 3(2)
PROJECT NAME: REPAIRS AND ARMORING
PROJECT DESCRIPTION:
The project is located in Death Valley National Park in Inyo County. Death Valley National Park sustained significant roadway damage park wide due to historic rainfall from Hurricane Hillary. The base schedule consists of pavement patching and armoring on multiple routes, removing and replacing asphalt on harmony borax trail, and roadway reconditioning and placing new culverts on West Side Road. Option X consists of pavement patching and armoring on Emigrant Canyon Road from MP 0.0 to MP 8.0.
SCOPE OF THE WORK:
This project consists of pavement patching, roadway reconditioning, armoring, sign installation and replacement, and installing new gates on multiple routes throughout the park.Armoring consists of paved shoulders, gabion walls, revet mattresses and a combination of revet mattresses with concrete barrier.
The desert tortoise is present along some routes at elevations higher than 2,000 feet. Biological and Archeological monitors will be required for the duration of the project. The contractor will be allowed to set up stand tanks at three locations within the park to collect water. There are limitations to the quantity of water that can be pulled from each source per day.
SIGNIFICANT QUANTITIES:
Significant items include (quantities are subject to change):
Schedule A
Removal of Pavement, Asphalt – 2,200 SQYD
Revet Mattress, Galvanized or Aluminized Coated – 2,500 SQYD
Roadway Reconditioning – 3 Mile
Asphalt Concrete Pavement Patch, Type 1 – 7,700 SQYD
24-Inch Pipe Culvert – 100 LNFT
Sidewalk, Asphalt – 2,100 LNFT
Concrete Barrier – 2,800 LNFT
Option X
Gabions, Galvanized or Aluminized Coated – 3,500 CUYD
Revet Mattress, Galvanized or Aluminized Coated – 650 SQYD
Contractor Furnished Gabion Wall Design - LPSM
Asphalt Concrete Pavement Patch, Type 1 – 4,500 SQYD
Concrete Barrier – 550 LNFT
ANTICIPATED SCHEDULE: Advertise: July 2024; Award: August 2024; Construction: August 2024 through February 2025.
The estimated bid range is between $10,000,000 and $20,000,000.
Files
Show all 22
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA ERFO NP DEVA 2023-3(2) Repairs and Armoring | Award Notice | |
| This notice | Solicitation | |
| CA ERFO NP DEVA 2023-3(2) Repairs and Armoring | Pre-Solicitation | |
| CA ERFO NP DEVA 2023-3(2) Repairs and Armoring | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2) | Federal Highway Administration | Total Small Business | |
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity