Bid Tabs CA ERFO NP DEVA 2023-3(2).pdf
PDF 650 KB Posted
- Attached to
- CA ERFO NP DEVA 2023-3(2) Repairs and Armoring Federal contract opportunity
- Solicitation number
- 6982AF24B000010
About this file
This document is a Tabulation of Bids for a federal construction contract opportunity, Project No. CA ERFO NP DEVA 2023-3(2) for Repairs and Armoring in Death Valley National Park, Inyo County, CA.
The scope of work includes pavement patching, roadway reconditioning, armoring with gabions, revet mattresses, and concrete barrier, sign installation and replacement, and installing new gates. Significant quantities include 2,200 SQYD of asphalt pavement removal, 2,500 SQYD of revet mattress, 3 miles of roadway reconditioning, 7,700 SQYD of asphalt pavement patching, and 100 LF of 24-inch pipe culvert under the base schedule. The option schedule includes an additional 3,500 CUYD of gabions, 650 SQYD of revet mattress, 4,500 SQYD of pavement patching, and 550 LF of concrete barrier. The total estimated bid range is between $10,000,000 and $20,000,000. The contract is anticipated to be awarded in August 2024 with construction from August 2024 through February 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary CA ERFO NP DEVA 2023-3(2).pdf | ||
| QnA 8.09.24_ DEVA.pdf | ||
| A005 DEVA 8.9.24.pdf | ||
| A004 DEVA 8.5.24.pdf | ||
| QnA 8.5.24_ DEVA.pdf | ||
| A003 DEVA.pdf | ||
| QnA 7.26.24 DEVA.pdf | ||
| A002 DEVA.pdf | ||
| QnA 7.24.24 DEVA.pdf | ||
| QnA 7.18.24 Virtual Pre-Bid.pdf | ||
| CA ERFO DEVA_Prebid presentation.pptx | PPTX presentation | |
| QnA 7.18.24 DEVA.pdf | ||
| A001 DEVA 7.18.24.pdf | ||
| Interested Vendors List 7.11.2024.pdf | ||
| CA ERFO NP DEVA 2023-3(2)_QnA-07_10_2024.pdf | ||
| 01.100 - Plans.pdf | ||
| 22.100 - Pavement Report.pdf | ||
| FP-14_Eng.pdf | ||
| 6982AF24B000010.pdf | ||
| CA ERFO NP DEVA2023-3(1)-AS-BUILT DRAWINGS_01_26_24.pdf | ||
| 21.100 Hydraulics Report.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 08/15/24
1 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Contractor Responsive?
Engineer's Estimate
Central Environmental, Inc.
S. T. Rhoades Construction, Inc.
Steve Manning Construction Inc
Whelcon Contractors LLC.
Base Schedule A
$8,107,695.00
$15,669,007.09
$10,271,382.50
$9,386,963.00
$17,138,097.19
Option: X
$6,272,780.00
$11,208,859.21
$8,360,850.00
$7,429,905.00
$11,625,346.82
Contractor Responsive?
Engineer's Estimate
Central Environmental, Inc.
S. T. Rhoades Construction, Inc.
Steve Manning Construction Inc
Whelcon Contractors LLC.
Total Base Schedule A and Option(s): X
$14,380,475.00
$26,877,866.30
$18,632,232.50
$16,816,868.00
$28,763,444.01
2 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF24B000010
Division: Central Federal Lands
State: CA County: Inyo
Federal Land: Death Valley National Park Opened at:
Opened by:
Date: 08/13/24
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Steve Manning Construction Inc $7,429,905.00 5211 Churn Creek Road Redding, CA 96002
S. T. Rhoades Construction, Inc. $8,360,850.00 PO Box 494520 Redding, CA 96049
Central Environmental, Inc. $11,208,859.21 229 E. Whitney Road Anchorage, AK 99501
Whelcon Contractors LLC. $11,625,346.82 2015 North Forbes Blvd Suite 101 Tucson , AZ 85745
Engineer's Estimate $6,272,780.00
3 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0001 15101-0000 MOBILIZATION
Steve Manning Construction Inc Lump Sum $700,000.00 S. T. Rhoades Construction, Inc. Lump Sum $600,000.00 Central Environmental, Inc. Lump Sum $449,666.81 Whelcon Contractors LLC. Lump Sum $1,065,364.05 Engineer's Estimate ALL LPSM Lump Sum $755,350.00
X0011 15201-0000 CONSTRUCTION SURVEY AND STAKING
Steve Manning Construction Inc Lump Sum $80,000.00 S. T. Rhoades Construction, Inc. Lump Sum $50,000.00 Central Environmental, Inc. Lump Sum $461,759.38 Whelcon Contractors LLC. Lump Sum $152,022.64 Engineer's Estimate ALL LPSM Lump Sum $7,000.00
X0021 15214-2000 SURVEY AND STAKING, RETAINING WALL
Steve Manning Construction Inc Lump Sum $28,000.00 S. T. Rhoades Construction, Inc. Lump Sum $17,000.00 Central Environmental, Inc. Lump Sum $6,965.97 Whelcon Contractors LLC. Lump Sum $34,370.33 Engineer's Estimate ALL LPSM Lump Sum $28,000.00
X0031 15301-0000 CONTRACTOR QUALITY CONTROL
Steve Manning Construction Inc Lump Sum $240,000.00 S. T. Rhoades Construction, Inc. Lump Sum $400,000.00 Central Environmental, Inc. Lump Sum $968,791.12 Whelcon Contractors LLC. Lump Sum $268,303.43 Engineer's Estimate ALL LPSM Lump Sum $80,000.00
X0041 15401-0000 CONTRACTOR TESTING
Steve Manning Construction Inc Lump Sum $120,000.00 S. T. Rhoades Construction, Inc. Lump Sum $150,000.00 Central Environmental, Inc. Lump Sum $270,525.03 Whelcon Contractors LLC. Lump Sum $124,299.74 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
X0051 15501-0000 CONSTRUCTION SCHEDULE
Steve Manning Construction Inc Lump Sum $20,000.00 S. T. Rhoades Construction, Inc. Lump Sum $5,000.00 Central Environmental, Inc. Lump Sum $7,915.88 Whelcon Contractors LLC. Lump Sum $33,986.31 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
4 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0061 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Steve Manning Construction Inc Lump Sum $15,000.00 S. T. Rhoades Construction, Inc. Lump Sum $2,000.00 Central Environmental, Inc. Lump Sum $35,804.10 Whelcon Contractors LLC. Lump Sum $128,570.84 Engineer's Estimate ALL LPSM Lump Sum $122,000.00
X0071 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED
Steve Manning Construction Inc $528.00 $2,904,000.00 S. T. Rhoades Construction, Inc. $840.00 $4,620,000.00 Central Environmental, Inc. $1,102.95 $6,066,225.00 Whelcon Contractors LLC. $1,138.19 $6,260,045.00 Engineer's Estimate 5,500 CUYD $480.00 $2,640,000.00
X0081 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
Steve Manning Construction Inc $585.00 $365,625.00 S. T. Rhoades Construction, Inc. $480.00 $300,000.00 Central Environmental, Inc. $859.14 $536,962.50 Whelcon Contractors LLC. $401.87 $251,168.75 Engineer's Estimate 625 SQYD $350.00 $218,750.00
X0091 25701-0100 CONTRACTOR FURNISHED GABION WALL DESIGN
Steve Manning Construction Inc Lump Sum $27,000.00 S. T. Rhoades Construction, Inc. Lump Sum $25,000.00 Central Environmental, Inc. Lump Sum $44,117.81 Whelcon Contractors LLC. Lump Sum $47,589.70 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
X0101 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
Steve Manning Construction Inc $216.00 $1,656,720.00 S. T. Rhoades Construction, Inc. $175.00 $1,342,250.00 Central Environmental, Inc. $208.98 $1,602,876.60 Whelcon Contractors LLC. $203.58 $1,561,458.60 Engineer's Estimate 7,670 SQYD $230.00 $1,764,100.00
X0111 61801-0000 CONCRETE BARRIER
Steve Manning Construction Inc $138.00 $99,360.00 S. T. Rhoades Construction, Inc. $150.00 $108,000.00 Central Environmental, Inc. $226.39 $163,000.80 Whelcon Contractors LLC. $522.16 $375,955.20 Engineer's Estimate 720 LNFT $230.00 $165,600.00
5 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0121 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $200.00 $6,000.00 S. T. Rhoades Construction, Inc. $220.00 $6,600.00 Central Environmental, Inc. $361.65 $10,849.50 Whelcon Contractors LLC. $186.84 $5,605.20 Engineer's Estimate 30 HOUR $270.00 $8,100.00
X0131 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Steve Manning Construction Inc $250.00 $7,500.00 S. T. Rhoades Construction, Inc. $165.00 $4,950.00 Central Environmental, Inc. $361.32 $10,839.60 Whelcon Contractors LLC. $244.86 $7,345.80 Engineer's Estimate 30 HOUR $275.00 $8,250.00
X0141 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Steve Manning Construction Inc $250.00 $7,500.00 S. T. Rhoades Construction, Inc. $230.00 $6,900.00 Central Environmental, Inc. $407.01 $12,210.30 Whelcon Contractors LLC. $257.62 $7,728.60 Engineer's Estimate 30 HOUR $300.00 $9,000.00
X0151 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Steve Manning Construction Inc $290.00 $8,700.00 S. T. Rhoades Construction, Inc. $230.00 $6,900.00 Central Environmental, Inc. $481.22 $14,436.60 Whelcon Contractors LLC. $295.92 $8,877.60 Engineer's Estimate 30 HOUR $325.00 $9,750.00
X0161 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $290.00 $8,700.00 S. T. Rhoades Construction, Inc. $185.00 $5,550.00 Central Environmental, Inc. $422.84 $12,685.20 Whelcon Contractors LLC. $257.62 $7,728.60 Engineer's Estimate 30 HOUR $350.00 $10,500.00
X0171 62301-0000 GENERAL LABOR
Steve Manning Construction Inc $150.00 $4,500.00 S. T. Rhoades Construction, Inc. $100.00 $3,000.00 Central Environmental, Inc. $403.86 $12,115.80 Whelcon Contractors LLC. $127.65 $3,829.50 Engineer's Estimate 30 HOUR $110.00 $3,300.00
6 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0181 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Steve Manning Construction Inc $450.00 $13,500.00 S. T. Rhoades Construction, Inc. $460.00 $13,800.00 Central Environmental, Inc. $593.69 $17,810.70 Whelcon Contractors LLC. $431.69 $12,950.70 Engineer's Estimate 30 HOUR $320.00 $9,600.00
X0191 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SERVICES)
Steve Manning Construction Inc Lump Sum $100,000.00 S. T. Rhoades Construction, Inc. Lump Sum $220,000.00 Central Environmental, Inc. Lump Sum $24,697.53 Whelcon Contractors LLC. Lump Sum $226,639.14 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
X0201 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (ARCHAEOLOGICAL MONITOR)
Steve Manning Construction Inc Lump Sum $100,000.00 S. T. Rhoades Construction, Inc. Lump Sum $240,000.00 Central Environmental, Inc. Lump Sum $72,826.05 Whelcon Contractors LLC. Lump Sum $359,744.67 Engineer's Estimate ALL LPSM Lump Sum $36,000.00
X0211 63301-0000 SIGN SYSTEM
Steve Manning Construction Inc $1,500.00 $36,000.00 S. T. Rhoades Construction, Inc. $2,350.00 $56,400.00 Central Environmental, Inc. $1,501.22 $36,029.28 Whelcon Contractors LLC. $1,189.74 $28,553.76 Engineer's Estimate 24 EACH $1,200.00 $28,800.00
X0221 63316-1000 REMOVE AND RESET SIGN
Steve Manning Construction Inc $1,500.00 $3,000.00 S. T. Rhoades Construction, Inc. $1,750.00 $3,500.00 Central Environmental, Inc. $845.56 $1,691.12 Whelcon Contractors LLC. $1,189.75 $2,379.50 Engineer's Estimate 2 EACH $700.00 $1,400.00
X0231 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Steve Manning Construction Inc $16,000.00 $76,800.00 S. T. Rhoades Construction, Inc. $7,500.00 $36,000.00 Central Environmental, Inc. $27,863.88 $133,746.62 Whelcon Contractors LLC. $5,948.71 $28,553.81 Engineer's Estimate 4.800 MILE $3,600.00 $17,280.00
7 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0241 63501-0000 TEMPORARY TRAFFIC CONTROL
Steve Manning Construction Inc Lump Sum $780,000.00 S. T. Rhoades Construction, Inc. Lump Sum $100,000.00 Central Environmental, Inc. Lump Sum $168,344.28 Whelcon Contractors LLC. Lump Sum $560,500.85 Engineer's Estimate ALL LPSM Lump Sum $200,000.00
X0750 63701-0000 FIELD OFFICE
Steve Manning Construction Inc $22,000.00 $22,000.00 S. T. Rhoades Construction, Inc. $38,000.00 $38,000.00 Central Environmental, Inc. $65,965.63 $65,965.63 Whelcon Contractors LLC. $61,774.50 $61,774.50 Engineer's Estimate 1 EACH $15,000.00 $15,000.00
Total Schedule - All Items
Steve Manning Construction Inc $7,429,905.00 S. T. Rhoades Construction, Inc. $8,360,850.00 Central Environmental, Inc. $11,208,859.21 Whelcon Contractors LLC. $11,625,346.82 Engineer's Estimate $6,272,780.00
8 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF24B000010
Division: Central Federal Lands
State: CA County: Inyo
Federal Land: Death Valley National Park Opened at:
Opened by:
Date: 08/13/24
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Steve Manning Construction Inc $9,386,963.00 5211 Churn Creek Road Redding, CA 96002
S. T. Rhoades Construction, Inc. $10,271,382.50 PO Box 494520 Redding, CA 96049
Central Environmental, Inc. $15,669,007.09 229 E. Whitney Road Anchorage, AK 99501
Whelcon Contractors LLC. $17,138,097.19 2015 North Forbes Blvd Suite 101 Tucson , AZ 85745
Engineer's Estimate $8,107,695.00
9 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Steve Manning Construction Inc Lump Sum $980,000.00 S. T. Rhoades Construction, Inc. Lump Sum $1,000,000.00 Central Environmental, Inc. Lump Sum $1,038,382.85 Whelcon Contractors LLC. Lump Sum $1,563,036.85 Engineer's Estimate ALL LPSM Lump Sum $955,701.20
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Steve Manning Construction Inc Lump Sum $150,000.00 S. T. Rhoades Construction, Inc. Lump Sum $115,000.00 Central Environmental, Inc. Lump Sum $659,656.25 Whelcon Contractors LLC. Lump Sum $588,540.25 Engineer's Estimate ALL LPSM Lump Sum $18,000.00
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Steve Manning Construction Inc $5,000.00 $10,000.00 S. T. Rhoades Construction, Inc. $2,800.00 $5,600.00 Central Environmental, Inc. $3,298.28 $6,596.56 Whelcon Contractors LLC. $7,636.54 $15,273.08 Engineer's Estimate 2 EACH $4,000.00 $8,000.00
A0080 15301-0000 CONTRACTOR QUALITY CONTROL
Steve Manning Construction Inc Lump Sum $300,000.00 S. T. Rhoades Construction, Inc. Lump Sum $1,000,000.00 Central Environmental, Inc. Lump Sum $2,011,621.21 Whelcon Contractors LLC. Lump Sum $536,606.85 Engineer's Estimate ALL LPSM Lump Sum $400,000.00
A0100 15401-0000 CONTRACTOR TESTING
Steve Manning Construction Inc Lump Sum $200,000.00 S. T. Rhoades Construction, Inc. Lump Sum $420,000.00 Central Environmental, Inc. Lump Sum $631,225.07 Whelcon Contractors LLC. Lump Sum $266,356.59 Engineer's Estimate ALL LPSM Lump Sum $60,000.00
A0120 15501-0000 CONSTRUCTION SCHEDULE
Steve Manning Construction Inc Lump Sum $30,000.00 S. T. Rhoades Construction, Inc. Lump Sum $25,000.00 Central Environmental, Inc. Lump Sum $25,066.94 Whelcon Contractors LLC. Lump Sum $101,550.85 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
10 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Steve Manning Construction Inc Lump Sum $50,000.00 S. T. Rhoades Construction, Inc. Lump Sum $5,000.00 Central Environmental, Inc. Lump Sum $42,333.15 Whelcon Contractors LLC. Lump Sum $190,530.36 Engineer's Estimate ALL LPSM Lump Sum $44,000.00
A0160 20301-1100 REMOVAL OF GATE
Steve Manning Construction Inc $2,500.00 $25,000.00 S. T. Rhoades Construction, Inc. $2,200.00 $22,000.00 Central Environmental, Inc. $912.86 $9,128.60 Whelcon Contractors LLC. $987.48 $9,874.80 Engineer's Estimate 10 EACH $1,500.00 $15,000.00
A0180 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
Steve Manning Construction Inc $25.00 $50,625.00 S. T. Rhoades Construction, Inc. $15.00 $30,375.00 Central Environmental, Inc. $92.88 $188,082.00 Whelcon Contractors LLC. $42.13 $85,313.25 Engineer's Estimate 2,025 SQYD $40.00 $81,000.00
A0200 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Steve Manning Construction Inc Lump Sum $190,000.00 S. T. Rhoades Construction, Inc. Lump Sum $235,000.00 Central Environmental, Inc. Lump Sum $232,199.00 Whelcon Contractors LLC. Lump Sum $183,013.64 Engineer's Estimate ALL LPSM Lump Sum $15,500.00
A0220 20420-0000 EMBANKMENT CONSTRUCTION
Steve Manning Construction Inc $450.00 $202,500.00 S. T. Rhoades Construction, Inc. $150.00 $67,500.00 Central Environmental, Inc. $255.42 $114,939.00 Whelcon Contractors LLC. $218.56 $98,352.00 Engineer's Estimate 450 CUYD $280.00 $126,000.00
A0240 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED
Steve Manning Construction Inc $850.00 $833,000.00 S. T. Rhoades Construction, Inc. $850.00 $833,000.00 Central Environmental, Inc. $1,359.75 $1,332,555.00 Whelcon Contractors LLC. $834.75 $818,055.00 Engineer's Estimate 980 CUYD $480.00 $470,400.00
11 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 25305-1000 REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED
Steve Manning Construction Inc $530.00 $1,370,050.00 S. T. Rhoades Construction, Inc. $515.00 $1,331,275.00 Central Environmental, Inc. $785.98 $2,031,758.30 Whelcon Contractors LLC. $375.24 $969,995.40 Engineer's Estimate 2,585 SQYD $350.00 $904,750.00
A0280 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH
Steve Manning Construction Inc $76.00 $16,340.00 S. T. Rhoades Construction, Inc. $55.00 $11,825.00 Central Environmental, Inc. $133.51 $28,704.65 Whelcon Contractors LLC. $119.81 $25,759.15 Engineer's Estimate 215 SQYD $39.00 $8,385.00
A0300 30301-6000 ROADWAY RECONDITIONING
Steve Manning Construction Inc $150,000.00 $420,000.00 S. T. Rhoades Construction, Inc. $40,000.00 $112,000.00 Central Environmental, Inc. $81,269.65 $227,555.02 Whelcon Contractors LLC. $79,657.01 $223,039.63 Engineer's Estimate 2.800 MILE $200,000.00 $560,000.00
A0320 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
Steve Manning Construction Inc $216.00 $2,007,720.00 S. T. Rhoades Construction, Inc. $220.00 $2,044,900.00 Central Environmental, Inc. $419.42 $3,898,508.90 Whelcon Contractors LLC. $439.76 $4,087,569.20 Engineer's Estimate 9,295 SQYD $230.00 $2,137,850.00
A0340 60201-0800 24-INCH PIPE CULVERT
Steve Manning Construction Inc $600.00 $57,000.00 S. T. Rhoades Construction, Inc. $290.00 $27,550.00 Central Environmental, Inc. $580.50 $55,147.50 Whelcon Contractors LLC. $765.76 $72,747.20 Engineer's Estimate 95 LNFT $525.00 $49,875.00
A0360 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
Steve Manning Construction Inc $28.00 $18,200.00 S. T. Rhoades Construction, Inc. $23.00 $14,950.00 Central Environmental, Inc. $58.05 $37,732.50 Whelcon Contractors LLC. $55.30 $35,945.00 Engineer's Estimate 650 LNFT $40.00 $26,000.00
12 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 61501-1100 SIDEWALK, ASPHALT
Steve Manning Construction Inc $182.00 $368,550.00 S. T. Rhoades Construction, Inc. $105.00 $212,625.00 Central Environmental, Inc. $348.30 $705,307.50 Whelcon Contractors LLC. $115.86 $234,616.50 Engineer's Estimate 2,025 SQYD $150.00 $303,750.00
A0400 61801-0000 CONCRETE BARRIER
Steve Manning Construction Inc $138.00 $338,100.00 S. T. Rhoades Construction, Inc. $150.00 $367,500.00 Central Environmental, Inc. $226.39 $554,655.50 Whelcon Contractors LLC. $492.43 $1,206,453.50 Engineer's Estimate 2,450 LNFT $310.00 $759,500.00
A0420 61902-0900 GATE, METAL
Steve Manning Construction Inc $16,650.00 $382,950.00 S. T. Rhoades Construction, Inc. $15,000.00 $345,000.00 Central Environmental, Inc. $7,664.68 $176,287.64 Whelcon Contractors LLC. $24,265.76 $558,112.48 Engineer's Estimate 23 EACH $13,000.00 $299,000.00
A0440 61921-1000 REMOVE AND RESET FENCE
Steve Manning Construction Inc $100.00 $4,500.00 S. T. Rhoades Construction, Inc. $33.00 $1,485.00 Central Environmental, Inc. $165.45 $7,445.25 Whelcon Contractors LLC. $283.08 $12,738.60 Engineer's Estimate 45 LNFT $125.00 $5,625.00
A0460 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $200.00 $10,000.00 S. T. Rhoades Construction, Inc. $220.00 $11,000.00 Central Environmental, Inc. $361.65 $18,082.50 Whelcon Contractors LLC. $186.84 $9,342.00 Engineer's Estimate 50 HOUR $270.00 $13,500.00
A0480 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Steve Manning Construction Inc $250.00 $12,500.00 S. T. Rhoades Construction, Inc. $165.00 $8,250.00 Central Environmental, Inc. $361.32 $18,066.00 Whelcon Contractors LLC. $244.86 $12,243.00 Engineer's Estimate 50 HOUR $275.00 $13,750.00
13 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Steve Manning Construction Inc $250.00 $12,500.00 S. T. Rhoades Construction, Inc. $200.00 $10,000.00 Central Environmental, Inc. $407.01 $20,350.50 Whelcon Contractors LLC. $257.62 $12,881.00 Engineer's Estimate 50 HOUR $300.00 $15,000.00
A0520 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Steve Manning Construction Inc $290.00 $14,500.00 S. T. Rhoades Construction, Inc. $230.00 $11,500.00 Central Environmental, Inc. $481.22 $24,061.00 Whelcon Contractors LLC. $295.92 $14,796.00 Engineer's Estimate 50 HOUR $325.00 $16,250.00
A0540 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $290.00 $14,500.00 S. T. Rhoades Construction, Inc. $185.00 $9,250.00 Central Environmental, Inc. $422.82 $21,141.00 Whelcon Contractors LLC. $257.62 $12,881.00 Engineer's Estimate 50 HOUR $350.00 $17,500.00
A0560 62301-0000 GENERAL LABOR
Steve Manning Construction Inc $150.00 $7,500.00 S. T. Rhoades Construction, Inc. $100.00 $5,000.00 Central Environmental, Inc. $403.86 $20,193.00 Whelcon Contractors LLC. $127.65 $6,382.50 Engineer's Estimate 50 HOUR $110.00 $5,500.00
A0580 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Steve Manning Construction Inc $400.00 $20,000.00 S. T. Rhoades Construction, Inc. $460.00 $23,000.00 Central Environmental, Inc. $593.69 $29,684.50 Whelcon Contractors LLC. $431.69 $21,584.50 Engineer's Estimate 50 HOUR $320.00 $16,000.00
A0600 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SERVICES)
Steve Manning Construction Inc Lump Sum $100,000.00 S. T. Rhoades Construction, Inc. Lump Sum $140,000.00 Central Environmental, Inc. Lump Sum $57,627.57 Whelcon Contractors LLC. Lump Sum $359,744.67 Engineer's Estimate ALL LPSM Lump Sum $128,000.00
14 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (ARCHAEOLOGICAL MONITOR)
Steve Manning Construction Inc Lump Sum $100,000.00 S. T. Rhoades Construction, Inc. Lump Sum $302,000.00 Central Environmental, Inc. Lump Sum $174,430.26 Whelcon Contractors LLC. Lump Sum $719,489.35 Engineer's Estimate ALL LPSM Lump Sum $288,000.00
A0640 63301-0000 SIGN SYSTEM
Steve Manning Construction Inc $1,500.00 $7,500.00 S. T. Rhoades Construction, Inc. $1,750.00 $8,750.00 Central Environmental, Inc. $1,501.22 $7,506.10 Whelcon Contractors LLC. $1,303.48 $6,517.40 Engineer's Estimate 5 EACH $1,200.00 $6,000.00
A0660 63308-3000 OBJECT MARKER, TYPE 3
Steve Manning Construction Inc $300.00 $1,500.00 S. T. Rhoades Construction, Inc. $530.00 $2,650.00 Central Environmental, Inc. $432.42 $2,162.10 Whelcon Contractors LLC. $427.91 $2,139.55 Engineer's Estimate 5 EACH $300.00 $1,500.00
A0680 63316-1000 REMOVE AND RESET SIGN
Steve Manning Construction Inc $750.00 $6,000.00 S. T. Rhoades Construction, Inc. $550.00 $4,400.00 Central Environmental, Inc. $845.56 $6,764.48 Whelcon Contractors LLC. $789.99 $6,319.92 Engineer's Estimate 8 EACH $700.00 $5,600.00
A0700 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Steve Manning Construction Inc $16,000.00 $78,928.00 S. T. Rhoades Construction, Inc. $7,500.00 $36,997.50 Central Environmental, Inc. $27,863.88 $137,452.52 Whelcon Contractors LLC. $5,921.30 $29,209.77 Engineer's Estimate 4.933 MILE $3,600.00 $17,758.80
A0720 63501-0000 TEMPORARY TRAFFIC CONTROL
Steve Manning Construction Inc Lump Sum $975,000.00 S. T. Rhoades Construction, Inc. Lump Sum $1,391,000.00 Central Environmental, Inc. Lump Sum $899,771.13 Whelcon Contractors LLC. Lump Sum $3,923,601.70 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
15 out of 15
Project No: CA ERFO NP DEVA 2023-3(2)
Project Name: Repairs and Armoring
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0740 63701-0000 FIELD OFFICE
Steve Manning Construction Inc $22,000.00 $22,000.00 S. T. Rhoades Construction, Inc. $80,000.00 $80,000.00 Central Environmental, Inc. $216,826.04 $216,826.04 Whelcon Contractors LLC. $117,484.65 $117,484.65 Engineer's Estimate 1 EACH $40,000.00 $40,000.00
Total Schedule - All Items
Steve Manning Construction Inc $9,386,963.00 S. T. Rhoades Construction, Inc. $10,271,382.50 Central Environmental, Inc. $15,669,007.09 Whelcon Contractors LLC. $17,138,097.19 Engineer's Estimate $8,107,695.00
| 2024-08-15T15:51:47-0600 | |
| LAURA ANN VALLEJOS |