CA ERFO DEVA_Prebid presentation.pptx
PPTX presentation 24 MB Posted
- Attached to
- CA ERFO NP DEVA 2023-3(2) Repairs and Armoring Federal contract opportunity
- Solicitation number
- 6982AF24B000010
About this file
This document is a PowerPoint presentation related to a federal solicitation for the "CA ERFO NP DEVA 2023-3(2) Repairs and Armoring" project. The project is located in Death Valley National Park and is being issued by the Department of Transportation Federal Highway Administration. The scope of work includes pavement patching, roadway reconditioning, armoring, sign installation and replacement, and installing new gates on multiple routes throughout the park. Significant items include removal of pavement, revet mattress installation, roadway reconditioning, asphalt concrete pavement patching, and pipe culvert installation. Option X includes gabion wall construction, additional revet mattress installation, and more pavement patching. The estimated bid range is between $10,000,000 and $20,000,000. The anticipated schedule is to advertise the solicitation in July 2024, award in August 2024, and complete construction from August 2024 through February 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabs CA ERFO NP DEVA 2023-3(2).pdf | ||
| Bid Opening Summary CA ERFO NP DEVA 2023-3(2).pdf | ||
| A005 DEVA 8.9.24.pdf | ||
| QnA 8.09.24_ DEVA.pdf | ||
| A004 DEVA 8.5.24.pdf | ||
| QnA 8.5.24_ DEVA.pdf | ||
| A003 DEVA.pdf | ||
| QnA 7.26.24 DEVA.pdf | ||
| A002 DEVA.pdf | ||
| QnA 7.24.24 DEVA.pdf | ||
| QnA 7.18.24 Virtual Pre-Bid.pdf | ||
| QnA 7.18.24 DEVA.pdf | ||
| A001 DEVA 7.18.24.pdf | ||
| Interested Vendors List 7.11.2024.pdf | ||
| CA ERFO NP DEVA 2023-3(2)_QnA-07_10_2024.pdf | ||
| 01.100 - Plans.pdf | ||
| 22.100 - Pavement Report.pdf | ||
| 6982AF24B000010.pdf | ||
| CA ERFO NP DEVA2023-3(1)-AS-BUILT DRAWINGS_01_26_24.pdf | ||
| FP-14_Eng.pdf | ||
| 21.100 Hydraulics Report.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA ERFO NP DEVA 2023 - 3(2) – REPAIRS AND ARMORING
Pre-Bid Virtual Meeting - July 18, 2024 Death Valley National Park
Presentation Outline CA ERFO NP DEVA 2023 - 3(2) – Repairs and Armoring FHWA-CFLHD Team Project Partners Project Introduction Project Scope Details Project Photo Log Contract Requirements & Solicitation Notes Questions
Presentation Outline CA ERFO NP DEVA 2023 - 3(2) – Repairs and Armoring Representing FHWA-CFLHD Team Today Leslie Karsten – Contracting Officer Toni Pankau – Project Manager Larry Nechanicky – Highway Design Manager Greg Relyea – Highway Designer Vaughn Marshall – Construction Operations Engineer Denise Martinez – Financial Technician
Project Partners Roles & Responsibilities
Design Engineer; Construction Contract Administration Land Management Agency
Project Introduction Project Locations
Schedule A – 66 sites Badwater Road – 10 sites Beaty Cuttoff Road – 19 sites Bonnie Clare Road – 1 site Dantes View Road – 3 sites Daylight Pass Road – 9 sites Harmony Borax Trail – 1 site (entire trail) Mesquite Springs Campground Road – 1 site Mud Canyon Road – 9 sites Natural Bridge Road – 1 site North Highway – 10 sites Sunset Campground Road – 1 site Texas Spring Campground Road – 1 site Ubehebe Road – 1 site Westside Road – 2 sites
Project Locations
Option X – 11 Sites Emigrant Canyon Road
Purpose and Need August 2023 Hurricane Hillary Flood Event and subsequent roadway/park closure 8(a) emergency contract for roadway reconditioning and cold patching Additional Events in winter 2023/spring 2024 ERFO eligible roadway repairs Restore access and increase resiliency Provide safe and reliable access
Project Scope Details The project design includes the following elements on various routes within Death Valley National Park:
Construction of a new Gabion Stepdown Wall at Badwater Road MP 0.1 Construction will require removal of existing gabion wall and may require shoring on Badwater Road Contractor can use the opposite shoulder on Badwater for diversion in leu of shoring One lane of two-way traffic must be maintained at all times on Badwater Road Any temporary signals at intersection with CA-190 requires Caltrans Permit Construction of multiple new, contractor designed, Gabion Walls along Emigrant Canyon Road (Option X) Revet mattresses with and without buried concrete barrier (multiple routes)
Project Scope Details Cont.
The project design includes the following elements on various routes within Death Valley National Park:
Installation of new culverts on Westside Road and embankment construction/surfacing to restore roadway access Removal of existing asphalt, base preparation, and placement of new asphalt on Harmony Borax Trail Asphalt curb, paved shoulder and revet mattress to facilitate drainage away from existing infrastructure Installation of new signs Installation of new gates Asphalt shoulder Asphalt concrete pavement patching
Badwater Site 1, MP 0.1 Gabion Step Down Wall – Sheet C1 CFL does not have survey of this site or the existing gabion stepdown wall Roadway reconditioning occurred at this site during 2023 emergency contract and existing wall has been covered Contractor responsible for surveying site and submitting for approval the proposed new wall layout with number of courses and steps This detail only applies to the gabion structure at Badwater Road Site 1 on sheet C1
Emigrant Canyon Gabion Walls (Option X) - Sheet G1 CFL does not have updated survey of these sites, all failure locations were filled in with roadway reconditioning in the 2023 emergency project Contractor responsible for surveying sites and submitting for approval the wall designs at all locations per Section 253
CA ERFO NP DEVA 2023 - 3(2)
October 2023 Site Conditions
Emigrant Canyon Site 3 - MP 1.9 - Gabion Wall Location Pre-Emergency Repairs Post-Emergency Repairs
Beatty Cutoff Site 16/17 - MP 5.5 - 5.9 - Revet and Paved Shoulder Sites Pre-Emergency Repairs Post-Emergency Repairs
Westside Road – October 2023
Site 1 – Missing Culverts Site 2 – New Wash
Contract Requirements:
Comply with Death Valley NP Fire Plan (Appendix A) Obtain Caltrans permit for VMS signs and any other devices placed on Caltrans ROW per Section 107.01 Tortoise biologist required at sites above 2000’ elevation 23 and provided by contractor See Section 623.06 for required qualifications Training required for construction staff (Appendix B) Monitoring and survey requirements can be found in Section 107.10(e) Archeological monitor required at all sites and provided by contractor See Section 623.05 for required qualifications Harmony Borax Trail and Westside Road to be completed first (Section 108.01(b)) Multiple sites can be worked on concurrently
Contract Requirements Continued:
Traffic Control Requirements – Routes closed during construction See Section 156.07(h) for all allowable closures and corresponding dates Allowable Closures:
Westside Road Bonnie Clare Road Allow access through sites on Bonnie Clare road for Contractor at Scotty's Castle per Section 108.01 Harmony Borax Trail Natural Bridge Road Mud Canyon Road Emigrant Canyon Road, allow park staff access Texas Spring Campground and Sunset Campground season starts October 15th No onsite work can occur before September 9, 2024 per SCR 108.01A Fixed Completion Date Schedule A April 4, 2025, Option X June 27, 2025 per Section 108.01
Misc. Items Water located within the park at multiple locations – See Section 105.02(a) Stand tanks allowed, not expected to bring water from outside park Method Spec for compaction with exception of areas behind/under structural items (revet and gabions) Roadway Reconditioning Embankment Construction – Depending on material gradation size Embankment on top of/in front of gabions and revet Excess materials Excess excavated native materials MUST be stockpiled inside the park at mixing table locations or at other locations as directed by the CO Any excess imported material must be disposed of outside of the park
Solicitation Notes:
Competition: Total Small Business Set Aside Bid Opening Scheduled for August 8, 2024 at 1:00 pm MDT. Subject to change.
Submit all questions in writing to CFLContracts@dot.gov Deadline to submit questions is July 30, 2024 at 4:00 pm MDT.
Questions/Answers will be posted on SAM.gov
Bid Evaluation See A-4 Basis for Award - contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available and the Contracting Officer determines the price to be reasonable.
FAR 52.217-5 Evaluation of Options – Government will evaluate offers for award by adding total price for all options to the total price for the basic requirement. Evaluation of options will not obligate government to exercise options.
Required bid documents, refer to Sheet A-i of the solicitation:
SF1442
Signed Amendment Sheets Indication of interest in formal Partnering Bid Schedule Completed applicable Authority to Bind Certificate Buy American Act & Hazardous Materials Bid Guarantee (originals only) Completed VETS-4212 declaration Bidders Information and Current and Past Project Information
Questions image3.png image8.jpeg image9.png image10.jpeg image11.png image12.jpeg image13.png image14.png image15.png image16.png image17.png image18.png image19.jpeg image20.png image21.jpeg image1.png image2.png image5.png image6.png image7.png
File details come from the government source that posted it. Updated .