QnA 7.26.24 DEVA.pdf
PDF 121 KB Posted
- Attached to
- CA ERFO NP DEVA 2023-3(2) Repairs and Armoring Federal contract opportunity
- Solicitation number
- 6982AF24B000010
About this file
This document is a Questions and Answers (Q&A) file related to a federal contract opportunity from the Department of Transportation Federal Highway Administration (FHWA) for the CA ERFO NP DEVA 2023-3(2) Repairs and Armoring project. The project is located in Death Valley National Park and consists of pavement patching, roadway reconditioning, armoring, sign installation and replacement, and new gate installation on multiple routes throughout the park. Significant quantities include removal of pavement, asphalt concrete pavement patch, pipe culverts, sidewalk, and concrete barrier. The project is a Total Small Business Set Aside. The estimated bid range is between $10,000,000 and $20,000,000. The anticipated schedule is to advertise in July 2024, award in August 2024, and construction from August 2024 through February 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabs CA ERFO NP DEVA 2023-3(2).pdf | ||
| Bid Opening Summary CA ERFO NP DEVA 2023-3(2).pdf | ||
| QnA 8.09.24_ DEVA.pdf | ||
| A005 DEVA 8.9.24.pdf | ||
| A004 DEVA 8.5.24.pdf | ||
| QnA 8.5.24_ DEVA.pdf | ||
| A003 DEVA.pdf | ||
| A002 DEVA.pdf | ||
| QnA 7.24.24 DEVA.pdf | ||
| QnA 7.18.24 Virtual Pre-Bid.pdf | ||
| CA ERFO DEVA_Prebid presentation.pptx | PPTX presentation | |
| QnA 7.18.24 DEVA.pdf | ||
| A001 DEVA 7.18.24.pdf | ||
| Interested Vendors List 7.11.2024.pdf | ||
| CA ERFO NP DEVA 2023-3(2)_QnA-07_10_2024.pdf | ||
| 01.100 - Plans.pdf | ||
| 22.100 - Pavement Report.pdf | ||
| FP-14_Eng.pdf | ||
| 6982AF24B000010.pdf | ||
| CA ERFO NP DEVA2023-3(1)-AS-BUILT DRAWINGS_01_26_24.pdf | ||
| 21.100 Hydraulics Report.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
CA ERFO NP DEVA 2023-3(2) REPAIRS AND ARMORING
July 26, 2024
Questions Answers 1 Is there a job walk for the attached project? NON-MANDATORY PRE-BID VIRTUAL MEETING
A pre-bid virtual meeting will be conducted to solicit contractor interest and to orient contractors with the project prior to the bid opening. A Representative from the Federal Highway Administration (FHWA) will conduct a meeting on Thursday, July 18, 2024, from 2:00 – 3:00p.m. Local Mountain Time. FHWA will provide a brief project presentation and will be available to answer questions. All questions and answers will be posted to SAM.gov.
If you would like to attend the virtual meeting, please email CFLContracts@dot.gov by Wednesday, July 17, 2024, 1:00 p.m., Local Mountain Time to request a link to join the presentation. The virtual meeting will be held using Microsoft Teams.
ATTENDANCE AT THE PRE- BID VIRTUAL MEETING IS NOT
REQUIRED TO BID
2 Can we use CMP in lieu of HDPE for the pipe culverts?
No, please bid according to plans and specifications.
3 On plan sheet A5, note 4, it talks about cleaning prior to sealing cracks, seal according to 414 subsections. I am not finding anything on this under section 418 nor are there any bid items for this work. Can you please clarify this note and possibly add bid items for this work since there are miles of cracks and will be hard to measure as incidental, it needs to be by the linear foot?
Refer to amendment A001.
In some areas where gabion walls are being installed it shows to shore the excavation. Is it possible to put up temporary portable concrete barrier rail pinned to the asphalt to create one lane of traffic with the use of temporary signals in lieu of shoring the vertical excavation? If shoring is required regardless, can you send us a detail of what would be accepted in the Park?
Maintaining stability and safety of the excavation is the responsibility of the contractor. See the Special Contract Requirements (SCR) of the IFB and FP-14, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
5 Specifications page E-11, it says to comply with permit No. 2022- 0057-DWQ that expires 8/31/2028. Can you please provide the permit for our review?
Refer to Amendment A001.
6 Should there be any excess excavated materials from the project, can they be left at the mixing tables?
If we need imported materials for the project, can we get the material from the mixing tables?
Refer to Amendment A001 SCR’s Subsection 203.05(a) – Excess excavated native material MUST remain in the park and be disposed of at the listed mixing table locations OR as approved by CO. Any excess imported materials must be disposed of outside of the park.
If the contractor needs imported materials for the project, they may not get the material from the mixing tables.
7 Bid item 20304-1000, removal of structures & obstructions, sheet B1 shows this item one lump sum all, but no breakdown of what is being removed and where. The roadway plan sheets don’t show anything either. Can you please send a detailed breakdown per road as to what is a part of this item so it can be bid properly?
Refer to Amendment A001 for a breakdown of removals.
8 Bid item 20420-0000, embankment construction, plan sheets B6 & B8 per the summary sheets does not have any columns or remarks. The roadway plan sheets do not show anything either.
Can you explain further where this embankment is being placed per road (Badwater & Daylight Pass) & stationing?
Refer to Amendment A001, Sheet B12, Westside Road for embankment information.
9 On plan sheet C1, note 3, it says wall assumed to be 9’ and if additional height is required shoring will be necessary. I did already ask below about using pinned barrier rail in lieu of shoring, but my question here is how are we supposed to bid the shoring if you don’t even know if the height will be above 9’ as assumed? We need to know exact heights to bid properly or allow the shoring if needed to be a change order (modification) to the Contract if needed. Can you please clarify?
Refer to Amendment A001, SCR’s Subsection 253 and plan sheet C1: The contractor will determine exact layout and heights.
The existing gabion wall is 3 gabion courses tall, which is reflected in the plans. Due to additional erosion from the hurricane, there may be a section of wall that will be 12 ft tall including embedment depth at the walls tallest spot. The wall will step up gradually and not be that tall the entire length.
10 After reviewing plan sheet C1, the detail shows 4-rows, but the bid item of 980 CY is only for the top 3-rows, can you please confirm?
Refer to Amendment A001, SCR’s Subsection 253 and plan sheet C1: The contractor will determine exact layout and heights.
No matter if there is 3-rows or 4-rows, the bottom will be buried 3’ correct? If the 980 CY is correct and the first row is buried, the exposed wall height is only 6’ +/-, but the detail shows 9’ exposed, can you please confirm what you are looking for?
If you want 9’ exposed and 3’ buried, the 980 CY is incorrect.
There is no survey of this site, but the existing gabion structure in this location looks to be three (3) gabion courses high. It is anticipated a portion of this wall will need to be four (4) courses with the embedment depth while other portions may only be two courses deep. The detail shown on sheet C1 lists the maximum height that is anticipated at this site, but as shown in the table is going to be variable and fewer courses approaching the intersection with the CA-190 and the pullout on Badwater Road. The quantity of 980 cubic yards uses the assumption that the average height of the wall will be nine feet (some portions will be taller and some will be shorter).
3’ embedment depth is correct.
11 Except for plan sheet C1, there is no other gabion wall information for all the other locations IE: elevations, number of rows needed and etc. Are we supposed to use plan sheet G1 for all other locations and to assume four rows as shown in the cross section? This would basically give you 9’ +/- exposed at every location with 3’ buried. For the excavation at each location, we only have plan G1 to go off of using the existing ground shown for each location to quantity unless you have existing ground information at each location.
For Emigrant Canyon, please reference Sheets C45-C52 and corresponding Sheet G1.
The gabion walls on Emigrant Canyon road are all to be designed by the contractor with pay item 25701-0100 Contractor Furnished Gabion Wall Design. The contractor is responsible for designing the gabion walls in all locations on Emigrant Canyon Road. Quantities for these walls are based on field measurements post disaster in October of 2023. Since the October 2023 site visit, an emergency contract was awarded to restore access on Emigrant Canyon Road. All failure sites with gabion walls have been restored to pre-disaster fill slopes, but gabion walls will require excavating fill slopes, building the gabion wall structure, then re-constructing the embankment. While some wall locations will need to be four (4) courses tall (twelve feet high), it was assumed based on field visit measurements that a nine foot average height would be used in quantity calculations since some portions of the wall will also only need to be one (1) or two (2) courses high.
12 On plan sheet C1: The cost to design & shore this one location is going to cost way more than closing the road or moving the traffic across the road onto the dirt shoulder with signals until complete, would you consider this? It would add more road work & paving, but still far cheaper then shoring in this one small location.
Refer to Amendment A001.
Contractor is allowed to use a diversion on the shoulder in leu of shoring at this site. SCRs have been updated to reflect the requirements for this diversion in Section 156.05(a) and (i) and Section 107.01.
13 The sam.gov listing for this project CA ERFO NP DEVA 2023- 3(2) does not show that this project is a Small Business Set-Aside.
The cover sheet of the invitation to bid in the project specifications shows that it is a set-aside. Can you please clarify which is correct?
The project is a Total Small Business Set Aside, as stated in the solicitation. SAM.gov has been updated.
14 I was wondering if the CA ERFO np devs repairs and Armoring solicitation requires past performance. If so can I use past performance through my subcontractor?
Sheets B-3 thru B-6 of the solicitation are required to be filled out by the prime contractor. Sheet B-6 requires the prime contractor to list up to five of the largest jobs you have completed as prime contractor in the last five years which are similar in project work scope to this project. This information is used to determine responsibility of the contractor in accordance with FAR Subpart 9.1.
15 I was wondering if you guys can lift FAR Clause 52.236-1 - Performance of Work by the Contractor:
as well as FAR Clause 52.219-14 - Limitations on Subcontracting.
FAR 52.236-1 is not included in the solicitation. FAR 52.219-14 is required and will not be lifted.
16 I saw there’s the possibility of teaming up with other companies on this deal, would we be eligible if we were working with a company that is involved with doing the work?
Yes, refer to FAR Subpart 9.6.
17 Can the power point presentation be provided to contractors?
Yes, it will be posted after completion of the Pre-Bid Virtual Meeting.
18 Does the detour on Badwater have to be paved?
No it does not have to be paved. It has to be able to support bus and truck traffic.
19 Can you please look at extending the time to complete this project? There is way too many locations to complete this work based on your time frame.
Please refer to Amendment A002, which updates the completion dates for Schedule A and Option X.
20 Bid item X0091 25701-0100 Contractor Furnished Gabion Wall Design: Can FHWA please elaborate on what the design should include? For example, will the bid item referenced above this be considered a retaining wall? What exactly will be the heights of the wall( s) ?
Refer to SCR 253.03 for specification requirements and details for wall design. Walls must be surveyed according to Section 152, drawings submitted according to Subsection 104.03, and wall design performed in accordance with Section 257. Subsection 257.04 lists all items to be included in the wall design submittal (e.g. plan view of the structure, elevation view of the structure, typical cross-section view, etc.).
The only pay item considered a retaining wall is 25302-1000. Pay item 25305-1000 is not considered a retaining wall.
Please reference questions 9, 10, 11 above for wall heights.
21 Bid item X0091 25701-0100 Contractor Furnished Gabion Wall Design: Is this something the Gabion Manufacturing Engineer can supply, or does it have to be a 3rd Party independent Engineer that can Stamp the design?
Wall design is to be submitted in accordance with Subsection 104.03 and Section 257. If the gabion manufacturing engineer can supply all required submittal documents as described in 257.04, then according to 104.03 (2)
(b) (1), a seal/signature from a professional engineer is not required for gabion wall layouts/installations.
File details come from the government source that posted it. Updated .