Timberline Learning Center - Remodel / Expansion
The Town of Breckenridge, Colorado, is seeking a Construction Management General Contractor (CM/GC) for the Timberline Learning Center remodel and expansion project located in Sedgwick County. The procurement is a Request for Proposals (RFP) soliciting qualified firms to provide comprehensive pre-construction and construction services for expanding the existing 3,300 square foot childcare facility. Key deliverables include detailed cost estimates, value engineering options, input on long-lead construction items, and administration of subcontract bid processes for civil site work and vertical construction. The CM/GC will be responsible for evaluating cost implications of construction strategies and providing a Guaranteed Maximum Price during design development and construction document phases. Proposals are due by 12:00 p.m. MST on March 11, 2024, with the construction phase scheduled from May 2024 to November 2024. The project aims to address a significant childcare waitlist, with 520 children waiting for care as of June 2022, particularly for infant and toddler programs. The architectural team includes EUA for building design and Alpine Engineering for site planning and utility work.
The RFP does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. The total project budget is $650,000, covering building construction and associated sitework, with the Town reserving the right to not proceed with Phase Two (construction) if deemed not in their best interest. The project will expand the current facility's capacity beyond the existing 68 children across six classrooms, focusing on addressing local childcare needs. No incumbent vendors are specifically identified in the documentation. The CM/GC will need to coordinate with the architectural and engineering teams to develop comprehensive construction plans that maximize the facility's potential and meet the community's childcare requirements. The successful contractor will be expected to provide strategic insights into construction methodologies, potential cost savings, and efficient project execution while maintaining the project's core objectives of expanding childcare capacity in Breckenridge.
Colorado 3/11/24, 4:00 PM 2/1/24, 2:00 AM Frisco Tunnel Mural
The Town of Frisco and the Frisco Arts and Culture Council (FACC) are seeking a professional artist to design and install a mural for a pedestrian/bicycle tunnel located under Highway 9 in Frisco, Colorado. The Request for Proposals (RFP) solicits conceptual designs for transforming two 195-square-foot tunnel facades and the interior corrugated metal surface into a vibrant, artistic wayfinding element. Artists must submit 1-3 conceptual renderings, 2-6 links to previous work, and a one-page letter detailing their experience with large-scale murals by the submission deadline of March 15, 2024, at 5:00 pm MTN. The project requires the selected artist to create a bright, colorful, and inviting artwork that avoids repetitive mountain/natural realism themes while capturing Frisco's authentic art and culture scene. Evaluation criteria will focus on design suitability, aesthetic quality, broad community appeal, and the artist's previous work quality. The final design must be submitted to CDOT for approval by May 15, 2024, with a targeted installation window in late summer or early fall 2024.
The RFP does not specify any specific set-aside designations or restrictions on the types of organizations that can respond to the solicitation. The project offers an honorarium ranging from $20,000 to $30,000 for the selected artist to complete the design and installation of the mural. Once completed, the artwork will become part of the town's public art collection, with the Frisco Arts and Culture Council managing its long-term care and maintenance. The mural will connect recreational pathways between the Peninsula Recreation Area and County Commons, serving both an aesthetic and wayfinding function for the community. No information is provided about incumbent vendors or existing infrastructure requirements beyond the tunnel's current corrugated metal surface. The project represents a significant public art investment aimed at enhancing the visual experience of the tunnel and providing a creative, engaging environment for pedestrians and cyclists.
Colorado 3/15/24, 9:00 PM 2/15/24, 2:00 AM Dillon Wetlands Delineation and Topographic Survey of Lots 50 and 135
The Town of Dillon, Colorado is seeking a professional consultant to perform wetlands delineation and topographic survey services for two municipal lots (Lots 50 and 135) located on Little Beaver Trail adjacent to Straight Creek and Interstate 70. The Request for Proposals (RFP) requires a comprehensive approach involving four primary tasks: site background gathering, wetlands field delineation using industry-standard practices, topographic surveying with one-foot contour intervals, and obtaining wetlands approval from the United States Army Corps of Engineers (USACE). Required deliverables include a wetlands report with mapping, a 24"x36" topographic survey, and PDF and AutoCAD documentation. The RFP was released on June 12, 2025, with a pre-proposal site meeting scheduled for July 1st, 2025, and proposals due by July 10, 2025, at 4:00 pm MDT. Proposal evaluation will be based on criteria including proposal quality, understanding of wetland delineation processes, consultant reputation and experience, alignment with town interests, proposed approach, and interview performance. Proposals must be submitted electronically through the Rocky Mountain ePurchasing System, with potential shortlist interviews anticipated in June/July 2025 and bidder selection targeted for completion by August 1, 2025.
The RFP does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. Bidders must provide a comprehensive fee schedule itemizing hours, billing rates, travel costs, and reimbursable expenses, with strict instructions to avoid lump-sum pricing. The town reserves the right to reject any proposal and will conduct background investigations to assess bidder qualifications and financial ability. While no specific budget range is disclosed in the provided documents, the comprehensive nature of the project suggests a substantial professional services contract. The survey plat indicates the project is located in Summit County, specifically in Section 7, Township 5 South, Range 77 West of the 6th Principal Meridian. Consultants will need to demonstrate expertise in wetlands delineation, topographic surveying, and federal agency coordination, with a particular focus on producing detailed technical documentation and navigating environmental assessment requirements for the specified lots adjacent to Interstate 70.
Colorado 7/10/25, 8:00 PM 6/12/25, 2:00 AM RFQ FY26/27 Dillon Ranger District Office Snow Removal/Plowing
The Colorado Division of Natural Resources, Dillon Ranger District is seeking proposals for snow removal and plowing services at the Dillon Ranger District Office within the White River National Forest under RFQ FY26/27, with proposals due May 22, 2026. This is a total small business set-aside.
The scope covers snow removal and plowing services for the Dillon Ranger District Office facility. The contract term runs August 1, 2026 through July 31, 2027. Place of performance is the Dillon Ranger District Office in Sedgwick County, Colorado. The solicitation document (Sol_1240LP26Q0075.pdf) contains detailed service specifications and performance requirements.
Colorado 5/22/26, 2:00 AM 5/14/26, 2:00 AM Downtown Complete Streets Plan - Granite Street Final Design
The Town of Frisco, Colorado is seeking consulting services for the Downtown Complete Streets Plan - Granite Street Final Design project, with proposals due on March 22, 2024 at 4:00 pm. The procurement involves comprehensive design services for approximately 3,000 linear feet of Granite Street from Madison Avenue to Summit Boulevard, requiring 100% construction documents that encompass surveying, geometric layout, roadway alignments, grading, storm drainage, pedestrian infrastructure, traffic analysis, utility engineering, landscaping, and pedestrian lighting. Proposers must design the project according to CDOT and federal standards, with potential federal grant requirements. The evaluation will be based on weighted criteria: qualifications and references (20%), project manager and personnel (20%), project approach (20%), grants and CDOT experience (20%), and fee schedule (20%). The anticipated project timeline includes project kickoff in July 2024, 60% design by November 2024, 90% design by February 2025, 100% design by May 2025, and construction anticipated in April 2026. The Town plans to apply for a DOLA EIAF Tier 1 Grant in March 2024 and anticipates submitting CDOT and FHWA grant program applications to support construction funding.
While no specific set-aside designations or disadvantaged enterprise requirements are explicitly mentioned, the Town will select the proposer deemed best for the project, considering price, experience, proposed methodology, timeline, and references. The project's total estimated construction cost is $10,229,000, which includes direct item costs, right-of-way acquisitions, mobilization, traffic maintenance, construction engineering, and inspection. The cost estimate incorporates a 4.5% annual escalation factor based on 2022 dollars, with unit costs derived from CDOT and local bid tabulations. The project will involve significant infrastructure improvements, including new concrete and asphalt pavement, plastic pipes, manholes, inlets, sidewalks, curb ramps, brick pavers, lightposts, signage, and landscaping elements. Notably, the town has specified the use of custom solar-powered lights matching Main Street, eliminating previous hardwired lighting requirements. The project will require approximately 25 temporary construction easements across 50 adjacent properties and involves comprehensive stormwater drainage system improvements.
Colorado 3/22/24, 8:00 PM 2/23/24, 2:00 AM