2024/2025 Cured In Place Pipe (CIPP) Sewer Rehabilitation Project

Closed State & local contract opportunity Posted

Solicitation number
6
State
Colorado
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 26

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The Town of Telluride, Colorado is seeking qualified contractors for the 2024/2025 Cured In Place Pipe (CIPP) Sewer Rehabilitation Project, located in Sedgwick County. The procurement involves trenchless rehabilitation of approximately 3 miles of sewer infrastructure, with pipe diameters ranging from 6 to 21 inches. Key project deliverables include preconstruction CCTV inspection, pipe cleaning, bypass pumping, CIPP installation, hydrophilic end seals at manhole penetrations, trimming of protruding taps, and service connection reconnections. Potential acceptable installers include United Felts EnviroCure, Pipelogy, LLC, SAK Construction, LLC, and BLD Services LLC. Contractors must submit a comprehensive Statement of Qualifications demonstrating product and installer acceptability, including installation references from similar projects with detailed client contact information. The project evaluation criteria will focus on competitive pricing and the contractor's ability to meet specific contract specifications. The bid submission deadline is October 10, 2024, with work most accessible during the August through mid-late November timeframe, particularly considering restrictions in the Valley Floor conservation area.

The procurement does not explicitly outline specific set-aside designations or restrictions for disadvantaged business enterprises. The project includes a $200,000 line item for contract revisions and allows for bid quantity adjustments between -30% to +30% while maintaining unit costs. Bidders are required to provide detailed bypass pumping plans, including flow monitoring, emergency procedures, and noise control measures, with specific requirements for diesel-powered pumps. The project involves potential chemical grout injection and specialized lateral lining in areas with water infiltration. While a specific budget range is not directly stated, the comprehensive nature of the project—involving approximately 16,485 linear feet of pipe rehabilitation, 150 service connection reconnections, and 40 protruding tap trimmings—suggests a significant municipal infrastructure investment. An add alternate bid item allows for additional lateral liner installations for pipes 12 inches and smaller, as well as 18 inches and larger, providing flexibility in project scope and potential contract value.

Opportunity text

Installation of approximately 3 miles of cured in place pipe (CIPP) via trenchless rehabilitation methods. Pipe diameters range from 6-inch to 21-inch. Included in the project are hydrophilic end seals at each manhole penetration (subsidiary to pipe lining), the trimming of protruding taps, and a portion of service connections in groundwater shall be laterally lined in coordination with Public Works via an Add Alternate Bid Item. Project award will be evaluated based on price and ability of contractor to meet contract specifications.

Files

File Type Posted
00400 - Bid Form_CIPP_Addendum No. 2.pdf PDF
Addendum No 1 CIPP.pdf PDF
CIPP Bid Package.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors