190067_GOVT RESPONSE TO RFI 1 SECOND VISIT SIGNED COR.pdf

PDF 203 KB Posted

Attached to
Tinker AFB MACBOA WWYK190067 Repair Fire Suppression System B2136
Solicitation number
WWYK190067
Issued by

About this file

This document is a Pre-Bid Request for Information (RFI) Response memorandum from the Department of the Air Force, Headquarters 72 Air Base Wing at Tinker Air Force Base, Oklahoma, addressing a fire suppression system repair project (WWYK190067) for Building 2136. The RFI responds to a contractor's question about phasing plans for mechanical work, clarifying that the current phasing sheet (G-002) focuses primarily on sprinkler system demolition and installation, with a note that the final phasing plan will be developed by the contractor and coordinated with the user and government.

The project involves repairing the fire suppression system and requires coordination between multiple contractors, including mechanical, electrical, and fire alarm teams. Key points of contact include Bash Jimoh (Project Manager), Adam Gibson (Construction Inspector), Joshua Wheeler (CSAG Program Manager), and Matthew Morris (Contracting Officer Representative). The project is a Small Business Set-Aside with an estimated price range between $5,000,000 and $10,000,000, and is restricted to Tinker AFB MAC BOA (Multiple Award Construction Board of Agreement) holders.

View the file

Other files

File Type Posted
SOW Revision 1- 25 Aug.pdf PDF
OK20250049- REV 4-19SEP2025-WD.pdf PDF
Solicitation Amendment FA813725R00120003 SF 30.pdf PDF
Solicitation Amendment FA813725R00120002 SF 30.pdf PDF
WWYK190067_GOVT RESPONSE TO RFI 02 COR.pdf PDF
190067_ATT9_SOW-Rev 1.pdf PDF
Solicitation Amendment FA813725R00120001 SF 30.pdf PDF
Solicitation Amendment - FA813725R00120001.pdf PDF
OK20250049- REV 1-14MAR2025-WD.pdf PDF
Solicitation - FA813725R0012.pdf PDF
190067_ATT8_Liquidated_Damages_CO Signed.pdf PDF
WWYK190067-Site Visit Sign in Sheet- 17 April.pdf PDF
190067_ATT11_Revised _Drawings.pdf PDF
Revised SOW.pdf PDF
WWYK190067-Sign Visit Sign in Sheet- 23 Jan.pdf PDF
190067_ATT10_Submittal_Register.pdf PDF
190067 PREBID RFI GOVERNMENT RESPONSE_7APR COR.pdf PDF
01 32 16.00 20.pdf PDF
01 78 23.pdf PDF
190067ATT 12.a.iiiFCSpecs.pdf PDF
00 70 00.pdf PDF
01 50 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 42 00.pdf PDF
00 72 00.pdf PDF
01 78 00.pdf PDF
00 80 00.pdf PDF
190067_Drawings.zip ZIP file
TinkerGenReqSpecsNov22ChLog.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
00 80 05.pdf PDF
01 33 16.00 10.pdf PDF
01 45 00.00 10.pdf PDF
190067_ATT3_Green Statement_Signed.pdf PDF
190067_ATT10_Submittal Register.pdf PDF
190067_ATT11_IFC_Drawings.pdf PDF
WWYK190067 SITE VISIT PICTURES.pdf PDF
Wage Determination.pdf PDF
190067_ATT9_SOW.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

02 May 25

MEMORANDUM FOR AFSC/PZIOC (ATTN: RACHEL SILVA)

THROUGH: 72 ABW/CENM

FROM: 72 ABW/CEED

Tepa Companies

SUBJECT: Pre-Bid RFI Responses Project: WWYK190067, REPAIR FIRE SUPPRESSION SYSTEM, B2136.

Reference: Memo, 25 April 2025, Pre-Bid RFI 01 (Second Site Visit), WWYK190067, REPAIR

FIRE SUPPRESSION SYSTEM, B2136.

1. This office reviewed the referenced RFIs for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals

(1) Request for information. - Upon review of the Phasing Plans for the project, it was not made clear how the Mechanical work would be addressed in these plans. Is there an expectation as to how this will need to be addressed in any phase.

Government Response: The phasing plan sheet, G-002, is primarily focused on providing a phasing plan for the sprinkler system demolition and installation and does not address other trades or fire alarm. General Note 1 indicates a final phasing plan will be developed by the contractor and coordinated with the user and government. For work area purposes, the phase plan has the sprinkler risers for all phases being installed into the mechanical room during phase 2. It should be noted that the mechanical work should be coordinated with the electrical contractor as well. Fire Alarm contractor will also need to be part of the coordination efforts to determine when the space will be conditioned for the installation of the Fire Alarm equipment.

2. The points of contact for this project are:

a. Bash Jimoh, Project Manager. PH: 582 - 4828

b. Adam Gibson, Construction Inspector. PH: 736-5028

c. Joshua Wheeler, CSAG Program Manager. PH: 582-4826

d. Matthew Morris, Contracting Officer Representative (COR). PH: 736-7081

BASHIRU JIMOH MATHEW MORRIS

Project Manager Electrical Engineer/COR 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate

0 Attachment(s):

1. List Attachments cc:

Project folder

2025-05-02T13:17:36-0500
JIMOH.BASHIRU.BABATUNDE.1399499174
2025-05-05T08:35:02-0500
MORRIS.MATTHEW.K.1385757456

File details come from the government source that posted it. Updated .