000_TABLE OF CONTENTS.pdf
PDF 70 KB Posted
- Solicitation number
- WWYK190067
About this file
The document is a Table of Contents for Tinker Air Force Base General Requirements dated January 2022. It is divided into two main sections: Division 00 - Procurement and Contracting Requirements and Division 01 - General Requirements. The Division 00 sections cover general requirements, safety requirements, environmental requirements, and special provisions for working on Tinker Air Force Base, including specific guidelines for airfield work. The Division 01 sections outline project-specific administrative procedures including construction progress schedules, submittal processes, design data, quality control, contractor facilities, and closeout documentation requirements.
This Table of Contents appears to be a comprehensive framework for construction project documentation and procedural guidelines specific to Tinker Air Force Base, providing contractors with a structured overview of the administrative and operational expectations for projects undertaken at the facility. The document serves as a roadmap for the detailed technical specifications and requirements that would be elaborated in the subsequent sections of the complete project manual.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB Tinker General Requirements
January 2022 Page 1 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 70 00
00 71 00
00 72 00
00 80 00 00 80 05
GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE
BASE
GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR
FORCE BASE
GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON
TINKER AIR FORCE BASE
SPECIAL PROVISIONS FOR WORKING ON TINKER AFB
SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON
TINKER AFB
DIVISION 01 - GENERAL REQUIREMENTS
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 50 00 CONTRACTOR FACILITIES
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
-- End of Table of Contents –-