This is a Work Directive Change form from the City of Carmel, Indiana's Board of Public Works and Safety, designed to authorize modifications to an existing contract for 2027 Rock Salt for Drinking Water Softening. The form serves as the mechanism through which the city documents changes to project scope, specifications, or drawings prior to issuing a formal Contract Change Order. The directive includes fields for project identification, detailed description of work modifications, the justification for the change order, and adjustments to the project completion timeline, with provisions to add, deduct, or leave unchanged the number of contract days. The form requires approval from the city's Board of Public Works and Safety members and the City Engineer before authorization.
The Work Directive Change form establishes that a subsequent Contract Change Order will be issued to cover the financial impact of the authorized modifications, with the specific dollar amount to be determined and documented separately. The form requires signatures from the Board of Public Works and Safety, including the Presiding Officer Laura Campbell and members James Barlow and Alan Potasnik, as well as approval from Brad Pease, the City Engineer. This template represents the city's administrative procedure for managing scope changes on the rock salt procurement project prior to formal change order issuance, ensuring proper authorization and documentation of all contractual modifications.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2027_Rock_Salt_for_Drinking_Water_Softening_(Addendum_#1_Revision).pdf | ||
| 2027_ROCK_SALT_SPECIFICATIONS.pdf | ||
| FIELD_ORDER.pdf | ||
| NON_COLLUSION_AFFIDAVIT.pdf | ||
| CONTRACT_CHANGE_REQUEST.pdf | ||
| Exhibit_D_E-Verify-1.PDF | ||
| MAINTENANCE_BOND.pdf | ||
| RIGHT_OF_ENTRY.pdf | ||
| SAMPLE_AGREEMENT.pdf | ||
| SAMPLE_BID_BOND.docx | DOCX document | |
| CONTRACT_CHANGE_ORDER.pdf | ||
| MANUFACTURERS_LIST.pdf | ||
| PAYMENT_BOND.pdf | ||
| REQUEST_FOR_PROPOSAL_CHANGE.pdf | ||
| SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf | ||
| SUBCONTRACTORS_LIST.pdf | ||
| PERFORMANCE_BOND.pdf | ||
| SAMPLE_OF_MOU_FOR_E-VERIFY.pdf | ||
| 6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23