This file is a Site Logistics Plan for Whitehall Middle School (WDS Middle School) construction project. The plan outlines the phased construction schedule and site management strategy for the facility improvement project. Construction is divided into two phases: Phase 1 runs from April 2, 2027 to June 4, 2027 (concluding on the last day of school), and Phase 2 runs from June 7, 2027 to August 11, 2027 (during summer break). The plan designates specific construction areas, temporary fencing locations, dumpster and portable toilet placements, and delivery routes to accommodate ongoing school operations during the initial construction phase and minimize disruption to students and staff.

The logistics plan identifies Clark Construction as the field contractor, with a field office located at the White Lake Community Center (541 E. Slocum St., Whitehall, MI 49461). The plan designates separate construction entrance/exit points, a rear entrance/exit for the contractor, contractor parking areas, and a boiler room location. During Phase 1, emergency egress is restricted during summer break. Multiple gates are identified on the site plan to control access and manage traffic flow. This logistics planning document serves as the operational framework for managing construction activities while maintaining site safety and accessibility throughout the project duration.

View the file

Other files

File Type Posted
01a - Pure Architects Bid Addendum 01.pdf PDF
01b - Millies Engineering Bid Addendum 01.pdf PDF
06 - Middle School Asbestos Survey 20260506.pdf PDF
01 - Pure Architects Addendum 02.pdf PDF
03 - Section 012300 - Alternates.pdf PDF
20261021 Phase 1 Project Schedule.pdf PDF
08 - Middle School OSHA Paint Sampling 20260914.pdf PDF
04 - Whitehall Middle School Interior Logistics Plan.pdf PDF
02 - Section 002416 Bid Category Specific Notes.pdf PDF
26 0930 WDS Ealy CD Drawings.pdf PDF
00 - Addendum 02 - Summary.pdf PDF
26 0930 WDS MS CD Drawings.pdf PDF
00 - Addendum 01 - Summary.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part1.pdf PDF
Ealy Site Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part2.pdf PDF
02 - Section 002416 - Bid Categories.pdf PDF
04 - Pre-bid RFIs Addendum 2.pdf PDF
07 - Ealy Asbestos Survey 20260501.pdf PDF
10 - 20261029 Pre-Bid Meeting.pdf PDF
05 - Middle School Existing Tunnel Location.pdf PDF
20261021 Clark Construction Project Manual.pdf PDF
09 - Ealy OSHA Paint Sampling 20260914.pdf PDF
Shoreline Logistics Plan.pdf PDF
11 - Pre-Bid RFIs Addendum 01.pdf PDF
03 - Section 012300 - ALTERNATES.pdf PDF
26 0930 WDS Shoreline CD Drawings.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TomBrennan Polygon

TomBrennan Polygon

TomBrennan PolyLine

TomBrennan PolyLine

TomBrennan Rectangle

TomBrennan Rectangle

TomBrennan Ellipse

TomBrennan Text Box

LEGEND

CONSTRUCTION AREA (4/2/2027 TO 6/4/2027)

CONSTRUCTION AREA (6/7/2027 TO 8/11/2027)

TEMPORARY CONSTRUCTION FENCING

DUMPSTERS

PORTABLE TOILETS

CONSTRUCTION DELIVERY ROUTE

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Callout

EMERGENCY EGRESS ONLY

DURING SUMMER BREAK

TomBrennan Callout

GATE

TomBrennan Callout

GATE

TomBrennan Callout

GATE

TomBrennan Text Box Whitehall Middle School Site Logistics Plan

TomBrennan Text Box

CLARK CONSTRUCTION FIELD OFFICE

White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461

TomBrennan Callout

CONSTRUCTION ENTRANCE/EXIT

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Text Box

KEY DATES

Construction Start Date: 4/2/2027 Last Day of School: 6/4/2027 Construction End Date: 8/11/2027

TomBrennan Callout

CONSTRUCTION REAR ENTRANCE/EXIT

TomBrennan Rectangle

TomBrennan Text Box

BOILER ROOM

TomBrennan Rectangle

TomBrennan PolyLine

TomBrennan Polygon

TomBrennan Text Box

CONTRACTOR

PARKING