Ealy Site Logistics Plan.pdf

PDF 1 MB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 3
Issued by
Oakland County, Michigan

About this file

This document is a Site Logistics Plan for the Ealy Elementary School construction project in Whitehall, Michigan, part of the WDS Bond Proposal Phase 1 initiative. The plan outlines the management of construction activities at the Ealy Elementary site during a renovation project that includes boiler room demolition and roof replacement work. Construction is scheduled to commence on April 2, 2027, with the last day of school on June 4, 2027, and project completion targeted for August 11, 2027. The plan designates specific zones for dumpsters during initial demolition work and during the summer break period, establishes construction access routes and entrance/exit points, identifies a contractor parking area, and locates portable toilets on the campus. The Clark Construction field office is positioned at the White Lake Community Center located at 541 E. Slocum Street, Whitehall, Michigan 49461.

The logistics plan establishes operational protocols to minimize disruption to the school's academic calendar, with major construction activities concentrated during the summer break between the last day of school and the August 11 completion date. The document provides a visual representation of equipment placement and site access procedures to coordinate construction operations with ongoing school facility use. No pricing information, set-asides, funding details, or contract terms are specified within this logistics planning document.

View the file

Other files

File Type Posted
01a - Pure Architects Bid Addendum 01.pdf PDF
01b - Millies Engineering Bid Addendum 01.pdf PDF
06 - Middle School Asbestos Survey 20260506.pdf PDF
01 - Pure Architects Addendum 02.pdf PDF
03 - Section 012300 - Alternates.pdf PDF
20261021 Phase 1 Project Schedule.pdf PDF
08 - Middle School OSHA Paint Sampling 20260914.pdf PDF
04 - Whitehall Middle School Interior Logistics Plan.pdf PDF
02 - Section 002416 Bid Category Specific Notes.pdf PDF
26 0930 WDS Ealy CD Drawings.pdf PDF
00 - Addendum 02 - Summary.pdf PDF
26 0930 WDS MS CD Drawings.pdf PDF
00 - Addendum 01 - Summary.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part1.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part2.pdf PDF
02 - Section 002416 - Bid Categories.pdf PDF
04 - Pre-bid RFIs Addendum 2.pdf PDF
07 - Ealy Asbestos Survey 20260501.pdf PDF
10 - 20261029 Pre-Bid Meeting.pdf PDF
05 - Middle School Existing Tunnel Location.pdf PDF
20261021 Clark Construction Project Manual.pdf PDF
09 - Ealy OSHA Paint Sampling 20260914.pdf PDF
Shoreline Logistics Plan.pdf PDF
11 - Pre-Bid RFIs Addendum 01.pdf PDF
03 - Section 012300 - ALTERNATES.pdf PDF
26 0930 WDS Shoreline CD Drawings.pdf PDF
WDS Middle School Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TomBrennan Text Box Ealy Elementary Site Logistics Plan

TomBrennan Rectangle

TomBrennan PolyLine

TomBrennan Rectangle

TomBrennan Architect

DUMPSTER DURING INITIAL BOILER ROOM DEMOLITION AND ROOF REPLACEMENT

TomBrennan Architect

DUMPSTERS DURING SUMMER BREAK PERIOD

TomBrennan Text Box

LEGEND

DUMPSTERS

PORTABLE TOILETS

CONSTRUCTION ACCESS ROUTE

TomBrennan Rectangle

TomBrennan Switch

TomBrennan PolyLine

TomBrennan Polygon

TomBrennan Text Box

CONTRACTOR

PARKING

TomBrennan Text Box

CLARK CONSTRUCTION FIELD OFFICE

White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461

TomBrennan Callout

CONSTRUCTION ENTRANCE/EXIT

TomBrennan Rectangle

TomBrennan Text Box

BOILER ROOM

(BASEMENT LEVEL)

TomBrennan Text Box

KEY DATES

Construction Start Date: 4/2/2027 Last Day of School: 6/4/2027 Construction End Date: 8/11/2027