About this file
This document is a Site Logistics Plan for the Ealy Elementary School construction project in Whitehall, Michigan, part of the WDS Bond Proposal Phase 1 initiative. The plan outlines the management of construction activities at the Ealy Elementary site during a renovation project that includes boiler room demolition and roof replacement work. Construction is scheduled to commence on April 2, 2027, with the last day of school on June 4, 2027, and project completion targeted for August 11, 2027. The plan designates specific zones for dumpsters during initial demolition work and during the summer break period, establishes construction access routes and entrance/exit points, identifies a contractor parking area, and locates portable toilets on the campus. The Clark Construction field office is positioned at the White Lake Community Center located at 541 E. Slocum Street, Whitehall, Michigan 49461.
The logistics plan establishes operational protocols to minimize disruption to the school's academic calendar, with major construction activities concentrated during the summer break between the last day of school and the August 11 completion date. The document provides a visual representation of equipment placement and site access procedures to coordinate construction operations with ongoing school facility use. No pricing information, set-asides, funding details, or contract terms are specified within this logistics planning document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TomBrennan Text Box Ealy Elementary Site Logistics Plan
TomBrennan Rectangle
TomBrennan PolyLine
TomBrennan Rectangle
TomBrennan Architect
DUMPSTER DURING INITIAL BOILER ROOM DEMOLITION AND ROOF REPLACEMENT
TomBrennan Architect
DUMPSTERS DURING SUMMER BREAK PERIOD
TomBrennan Text Box
LEGEND
DUMPSTERS
PORTABLE TOILETS
CONSTRUCTION ACCESS ROUTE
TomBrennan Rectangle
TomBrennan Switch
TomBrennan PolyLine
TomBrennan Polygon
TomBrennan Text Box
CONTRACTOR
PARKING
TomBrennan Text Box
CLARK CONSTRUCTION FIELD OFFICE
White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461
TomBrennan Callout
CONSTRUCTION ENTRANCE/EXIT
TomBrennan Rectangle
TomBrennan Text Box
BOILER ROOM
(BASEMENT LEVEL)
TomBrennan Text Box
KEY DATES
Construction Start Date: 4/2/2027 Last Day of School: 6/4/2027 Construction End Date: 8/11/2027