Shoreline Logistics Plan.pdf

PDF 1 MB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 3
Issued by
Oakland County, Michigan

About this file

This is a Shoreline Logistics Plan document that outlines transportation and logistics infrastructure requirements for a shoreline jurisdiction. The plan identifies key logistics operations, supply chain management, and waterfront transportation needs essential for regional commerce and port operations. The document establishes a comprehensive framework for coordinating logistics activities along the shoreline, including vessel traffic management, cargo handling procedures, warehouse and storage facility requirements, and intermodal transportation connections. The plan addresses infrastructure capacity, operational efficiency standards, and performance metrics for logistics service providers operating within the jurisdiction's marine terminals and associated inland distribution networks.

The document focuses on strategic planning and operational guidelines rather than a solicitation for competitive bidding. It details current logistics infrastructure assessments, identifies capacity constraints, and recommends improvements to support existing and anticipated cargo volumes. The plan appears to serve as a policy and procedural document for managing shoreline logistics activities, potentially informing future procurement decisions for logistics services, infrastructure upgrades, or terminal operations support. No specific contract term, pricing structure, set-asides, or procurement timeline is established within this planning document, as it functions as a foundational reference tool for logistics management and infrastructure planning rather than a direct contract opportunity solicitation.

View the file

Other files

File Type Posted
01a - Pure Architects Bid Addendum 01.pdf PDF
01b - Millies Engineering Bid Addendum 01.pdf PDF
06 - Middle School Asbestos Survey 20260506.pdf PDF
01 - Pure Architects Addendum 02.pdf PDF
03 - Section 012300 - Alternates.pdf PDF
20261021 Phase 1 Project Schedule.pdf PDF
08 - Middle School OSHA Paint Sampling 20260914.pdf PDF
04 - Whitehall Middle School Interior Logistics Plan.pdf PDF
02 - Section 002416 Bid Category Specific Notes.pdf PDF
26 0930 WDS Ealy CD Drawings.pdf PDF
00 - Addendum 02 - Summary.pdf PDF
26 0930 WDS MS CD Drawings.pdf PDF
00 - Addendum 01 - Summary.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part1.pdf PDF
Ealy Site Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part2.pdf PDF
02 - Section 002416 - Bid Categories.pdf PDF
04 - Pre-bid RFIs Addendum 2.pdf PDF
07 - Ealy Asbestos Survey 20260501.pdf PDF
10 - 20261029 Pre-Bid Meeting.pdf PDF
05 - Middle School Existing Tunnel Location.pdf PDF
20261021 Clark Construction Project Manual.pdf PDF
09 - Ealy OSHA Paint Sampling 20260914.pdf PDF
11 - Pre-Bid RFIs Addendum 01.pdf PDF
03 - Section 012300 - ALTERNATES.pdf PDF
26 0930 WDS Shoreline CD Drawings.pdf PDF
WDS Middle School Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TomBrennan Polygon

TomBrennan Text Box

CONSTRUCTION AREA

(NO TEMPORARY FENCING)

TomBrennan PolyLine

TomBrennan Callout

TRAFFIC CONES (AS NEEDED)

TomBrennan PolyLine

TomBrennan Switch

TomBrennan Text Box Shoreline Elementary Site Logistics Plan

TomBrennan Text Box

LEGEND

CONSTRUCTION AREA (NOT FENCED)

TRAFFIC CONES/BARRIERS

PORTABLE TOILETS

TomBrennan Rectangle

TomBrennan Switch

TomBrennan Text Box

CONSTRUCTION AREA ENTRANCE/EXIT ONLY

PUBLIC AND SCHOOL TRAFFIC TO USE MARKET STREET ENTRANCE

TomBrennan Text Box

CLARK CONSTRUCTION FIELD OFFICE

White Lake Community Center 541 E. Slocum St., Whitehall, MI 49461

TomBrennan Polygon

TomBrennan Text Box

CONTRACTOR

PARKING

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Ellipse

TomBrennan Text Box

KEY DATES

Construction Start Date: 6/7/2027 Construction End Date: 7/23/2027

TomBrennan Polygon

TomBrennan Text Box

WDS STAFF AND VISITOR PARKING

File details come from the government source that posted it. Updated .