02 - Section 002416 Bid Category Specific Notes.pdf
PDF 702 KB Posted
- Solicitation number
- RFP WDS 270000000188 3
- Issued by
- Oakland County, Michigan
About this file
This document is a Scope of Work with Bid Category Specific Notes – Addendum 2 for construction projects at Whitehall Middle School and Shoreline Elementary, issued by Clark Construction Company. The bid categories detailed include Commissioning (01B), Concrete (03A), Carpet/Resilient Flooring/Hard Tile (09B), Electrical/Low Voltage/Fire Alarm (26A), and Site Work & Site Utilities (31A). Bid Category 01B requires commissioning of HVAC equipment and systems at both schools, including development of commissioning plans, pre-functional checklists, functional performance testing, and preparation of final commissioning reports. Bid Category 03A encompasses all concrete work for interior and exterior applications at both schools, including footings, foundations, slabs-on-grade, sidewalks, curbs, and site improvements at Shoreline Elementary, with an allowance of $15,000 for work directed by Clark Construction Company and unit pricing required for removal and replacement of interior concrete slabs. Bid Category 09B covers furnishing and installation of carpet tile, resilient sheet flooring, resilient base, porcelain tile, quarry tile, and mosaic tile, with extra materials required at 5 percent for carpet tile and 3 percent for tile and trim units. Bid Category 26A includes complete electrical, low-voltage/technology, and fire alarm systems with extensive coordination requirements for HVAC interfaces, mechanical equipment power, food-service equipment connections, and communications infrastructure, with a $3,000 allowance for lead exposure assessment. Bid Category 31A addresses site demolition, earthwork, grading, aggregate base, asphalt paving, pavement markings, erosion and sediment control, and site restoration at both locations.
The contract documents reference applicable Division 00 through Division 31 specifications and require all contractors to provide signed Clark Trade Contract Conditions with bid submissions. Contractors must coordinate extensively across trades, maintain detailed documentation, and comply with quality standards established in referenced sections. Site-specific requirements include relocation of the Gaga Ball Pit at the Middle School, installation of stainless channel drain and storm piping, rework of grading for masonry infill, and at Shoreline Elementary, provision of a curb cut for parking lot entrance with associated permitting and installation of parking lot and directional signage. Bid security, performance bonds, and payment bonds are specifically noted as not required for Bid Category 01B only. All work must coordinate with the approved project schedule, and contractors are responsible for performing work reasonably interpreted as included in their scope of work in accordance with drawings and specifications, beyond the itemization provided in these notes.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 002416
SCOPE OF WORK
BID CATEGORY SPECIFIC NOTES – ADDENDUM 2
Bid Category 01B – Commissioning
BID CATEGORY 01B – COMMISSIONING
GENERAL – The following shall not be interpreted as a complete itemization of the work to be performed under this Bid Category. This Bid Category Trade Contractor shall be responsible to perform all work reasonably interpreted to be included in its scope of work in accordance with the drawings and specifications in addition to these Bid Category notes of clarification.
BASE SPECIFICATION - Include ALL WORK specified or reasonably inferred
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 01 GENERAL REQUIREMENTS
230800 COMMISSIONING OF HVAC SYSTEMS
PARTIAL SCOPE OF WORK / REFERENCE SPECIFICATION(S)
Include PORTIONS of the Work specified and/or requirements as it pertains to the work of this Bid Category
015000 TEMPORARY FACILITIES AND CONTROLS
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING
DIVISION 26 ELECTRICAL
INCLUDE (Furnish and Install u.n.o):
1. Provide Clark Trade Contract Conditions, signed by an authorized company representative, with bid submission. Refer to Section 006200 – Certificates and
Other Forms.
2. Provide commissioning of HVAC equipment and systems, including associated temperature controls/FMS, identified for commissioning at Whitehall Middle
School and Ealy Elementary.
3. Develop, maintain, and update the Commissioning Plan, including responsibilities, documentation, testing procedures, sequencing, and scheduling.
4. Conduct a commissioning kickoff meeting and additional coordination meetings as required with Clark Construction Company, Owner, Architect/Engineer, and affected Trade Contractors.
5. Review HVAC submittals for compliance with commissioning requirements and design intent. Document and coordinate commissioning-related comments.
6. Develop pre-functional checklists and test forms. Coordinate completion by responsible Trade Contractors and review documentation prior to functional testing.
7. Verify required equipment startup, checkout, TAB, controls checkout, factory startup, and other prerequisite activities are complete and documented before functional testing.
8. Develop functional performance test procedures and coordinate, observe, and document functional testing performed by the responsible Trade Contractors, with participation by manufacturers, controls contractors, TAB contractor, and other required parties.
9. Verify commissioned HVAC equipment and systems operate as required by the
Contract Documents, including controls sequences, safeties, alarms, interlocks, FMS interfaces, shutdowns, and other required system interfaces.
10. Coordinate required commissioning support with the HVAC/Plumbing, Temperature Controls, and TAB Contractors, equipment manufacturers, and other affected trades, including required personnel, equipment, software, instruments, and technical assistance.
11. Review TAB information provided by the applicable HVAC Contractor.
12. Document deficiencies, incomplete Work, failed tests, and other commissioning findings. Maintain and distribute an Issues Log identifying responsible parties, corrective actions, status, and resolution.
13. Coordinate and document retesting of corrected deficiencies until required system performance is achieved.
14. Where testing identifies conditions that do not achieve design intent, document the condition and coordinate resolution with Clark Construction Company and the
Architect/Engineer. Do not independently direct design changes.
15. Review applicable O&M information, controls documentation, TAB reports, startup reports, record information, and other commissioning-related closeout documentation.
16. Review Owner training plans and materials, coordinate training activities, and observe and document training where required.
17. Prepare and submit the final Commissioning Report, including functional test documentation, Issues Log status, retesting results, and other required commissioning records.
18. Coordinate all commissioning activities with the Project Schedule and provide adequate notice to Clark Construction Company and affected Trade Contractors.
19. Provide all required building envelope and lighting controls commissioning for applicable areas of construction in accordance with the referenced Energy Code standards.
EXCLUDE:
1. Equipment and system startup, checkout, calibration, adjustment, testing, balancing, and debugging assigned to the installing Trade Contractors.
2. Testing, Adjusting and Balancing Work assigned to the HVAC/Plumbing Bid
Categories.
3. Correction, repair, replacement, programming modifications, or other remedial
Work required to resolve deficiencies identified during commissioning.
4. Commissioning of plumbing, fire-protection, fire-alarm, electrical power-distribution, emergency-power, communications, security, and other electrical or low-voltage systems, except for interfaces specifically required to functionally test commissioned HVAC equipment and systems.
5. Bid security, performance bond, and payment bond are not required for Bid
Category 01B.
Bid Category 03A – Concrete
BID CATEGORY 03A - Concrete responsible to perform all work reasonably interpreted to be included in its scope of work in accordance with the drawings and specifications in addition to these Bid Category notes of clarification.
BASE SPECIFICATION(S)
Include ALL WORK specified or reasonably inferred
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 01 GENERAL REQUIREMENTS
DIVISION 03 CONCRETE
042200 CONCRETE UNIT MASONRY
079200 JOINT SEALANTS
321313.1 CONCRETE PAVINGS (MS)
321313.2 CONCRETE PAVING (SHORELINE)
323300.2 SITE FURNISHINGS (SHORELINE)
Include PORTIONS of the Work specified and/or requirements as it pertain to the work of this Bid Category.
015000 TEMPORARY FACILITIES AND CONTROLS
024119 SELECTIVE DEMOLITION
220500 PLUMBING GENERAL CONDITIONS
230500 MECHANICAL MATERIALS AND METHODS
260500 WORK IN EXISTING BUILDING
260543 UNDERGROUND DUCTS AND MANHOLES
DIVISION 31 EARTHWORK
321123.1 AGGREGATE BASE COURSES – MIDDLE SCHOOL
321123.2 AGGREGATE BASE COURSES – SHORELINE
323300.1 SITE FURNISHINGS (MS)
INCLUDE (Furnish and Install u.n.o):
Other Forms.
2. Provide all labor, supervision, layout, engineering coordination, materials, equipment, formwork, reinforcing, accessories, concrete placement, finishing, curing, protection, and cleanup required for the complete concrete work shown in the Contract Documents at:
a. Whitehall Middle School, including interior and exterior concrete.
b. Shoreline Elementary, including exterior concrete site improvements.
3. Review all architectural, structural, civil, landscape, food-service, plumbing, mechanical, electrical, and technology drawings for concrete work, penetrations, embeds, equipment pads, slab openings, elevations, and coordination requirements.
4. Field-verify existing dimensions, elevations, slab thicknesses, access, adjoining construction, and conditions before Work. Notify Clark Construction Company of discrepancies before proceeding.
5. Include phased work, multiple mobilizations, small placements, and return visits required by project schedule and sequencing.
6. Coordinate each placement with Clark Construction Company and affected trades.
Do not place concrete until required underground work, inspections, reinforcing, sleeves, embeds, anchor rods, blockouts, vapor barrier, geofoam, and adjoining work have been completed and accepted.
7. Protect existing construction, finishes, paving, utilities, landscaping, and concrete scheduled to remain. Repair damage caused by this contractor at no added cost.
8. Remove concrete washout, formwork, reinforcing scraps, excess concrete, packaging, and other debris generated by this contractor.
9. Review demolition limits before beginning new concrete work. Notify Clark Construction Company of inadequate limits, unsuitable slab edges, damaged concrete, or conditions affecting the new work.
10. Include minor preparation of existing concrete surfaces and exposed slab edges required for the new work, including cleaning, removal of loose material, localized chipping, roughening, and preparation for bonding.
11. Include drilling, coring, and cutting required solely for new reinforcing dowels, adhesive anchors, or embeds included in this Bid Category.
12. Drill and install reinforcing dowels into existing concrete where indicated.
13. Provide all new interior concrete footings, foundations, thickened slabs, turned-down slab edges, slab infills, and related concrete per plans and specifications.
14. Furnish and install reinforcing bars, welded-wire reinforcement, dowels, chairs, supports, ties, couplers, and reinforcing accessories associated with the concrete work.
15. Coordinate reinforcing dowels associated with new masonry construction with the Masonry contractor.
16. Provide formwork, bulkheads, pockets, recesses, blockouts, keyways, temporary supports, and construction joints required for the work.
17. Provide flowable fill or concrete fill where shown as part of the concrete details.
18. Provide excavation, subgrade preparation, disposal of excess excavated material, backfill, and compaction required for all new interior footings.
19. Provide backfill, as needed, for limits of utility tunnel demolition.
20. Provide new interior slabs-on-grade shown on the drawings, including the new slabs associated with the Cafeteria Restrooms.
21. Provide concrete slab infill after completion and inspection of underground plumbing, mechanical, electrical, and structural work, including infill at:
a. Underground utility trenches.
b. New wall footings and foundations.
c. Removed floor openings and access areas.
d. Areas disturbed for equipment or utility installation.
e. Utility tunnel areas where new slab construction is included.
f. Other locations shown in the Contract Documents.
22. Before placing slab infill, verify that:
a. Existing concrete demolition is complete.
b. Underground work has been inspected and accepted.
c. Required geofoam, fill, or subbase is complete.
d. Existing slab edges are clean and sound.
e. Reinforcing and dowels are installed.
f. Vapor barrier is complete and sealed.
g. Sleeves, drains, embeds, blockouts, and penetrations are in place.
23. Provide reinforcing, vapor barrier, joint materials, concrete placement, finishing, curing, and protection associated with the new slabs and infills.
24. Match adjacent slab thickness and finished elevation unless otherwise indicated.
25. Provide thickened slabs, turned-down edges, slab depressions, recessed slabs, sloped slabs, and re-entrant-corner reinforcement where indicated.
26. Coordinate slab elevations and depressions with flooring, tile, thresholds, floor mats, drains, doors, equipment, casework, and adjacent construction.
27. Finish slabs to receive the scheduled flooring or exposed-concrete finish.
28. Provide high-early-strength concrete for the Cafeteria Restroom footing and slab placements when required to maintain the approved project schedule, subject to compliance with the specified concrete performance requirements and approved mix-design submittal.
29. Furnish and install structural geofoam below new Middle School slabs where shown, including the restroom slab construction. Cut and fit geofoam tightly around foundations, penetrations, utilities, blockouts, and adjoining construction.
Fill or correct unacceptable gaps per the approved manufacturer requirements.
30. Protect geofoam from damage prior to concrete placement.
31. Provide all exterior concrete shown at the Middle School, including:
a. Concrete sidewalks and paving.
b. Courtyard concrete slabs.
c. Concrete stoops and exterior thresholds.
d. Flowable fill.
e. Landscape curbs.
f. Steps and landings where indicated.
g. Concrete associated with exterior doors.
h. Other exterior concrete shown in the architectural, structural, civil, or landscape documents.
32. Provide the 5-by-5-foot concrete stoop at Door B117, centered on the door and constructed per the architectural, structural, and site drawings.
33. Provide concrete at new exterior door thresholds where shown, including doweling to existing foundations or slabs when detailed.
34. Form and finish exterior concrete to the required lines, grades, elevations, slopes, thicknesses, and drainage patterns. Provide positive drainage without unintended ponding.
35. Provide all concrete site improvements shown at Shoreline Elementary, including:
a. Concrete sidewalks.
b. Integral concrete curb walks.
c. Standard concrete curbs.
d. Concrete curb and gutter.
e. Concrete curb ramps.
f. Detectable warning surfaces.
g. Transitions from new concrete to existing concrete.
h. Concrete associated with the staff sidewalk, landscape-bed, curb, bus-drop-off, and parking improvements.
i. Other concrete paving shown on the Shoreline civil and landscape drawings.
36. Provide the specified fiber reinforcement in Shoreline concrete walks, curbs, curb-and-gutter, and curb ramps.
37. Provide reinforcing bars, including curb reinforcing and “Gator Bar” reinforcing, where shown in the Shoreline details.
38. Provide expansion joints at buildings, immovable objects, transitions to existing pavement, and other locations shown.
39. Provide sawcut control joints at the spacing and depth shown.
40. Provide transitions from new concrete to existing concrete that are smooth, flush, and free of abrupt elevation changes.
41. Furnish and install new bollards at Shoreline Elementary, including concrete fill.
42. Coordinate concrete placement and recesses associated with site furnishings not furnished and installed by this Bid Category, including surface mounted site furnishings noted in Section 323300.1. Provide properly finished concrete surfaces suitable for anchors.
43. Verify readily observable lines, grades, elevations, slopes, and base conditions before setting forms. Notify Clark Construction Company of visible deficiencies before proceeding. Installation of forms or concrete constitutes acceptance of readily observable base elevations and conditions.
44. Include minor trimming immediately adjacent to forms.
45. Protect the accepted base from rutting, contamination, displacement, and damage caused by concrete operations. Repair damage caused by this contractor.
46. Receive, unload, store, lay out, and install items furnished by other trades for embedment in concrete, including anchor rods, embed plates, bearing plates, edge angles, inserts, sleeves, frames, and blockouts. Verify the location, elevation, projection, and alignment of anchor rods and embeds with the furnishing trade before concrete placement.
47. Protect anchor-rod threads during concrete placement.
48. Infill blockouts and pockets after the affected trade has completed and inspected its work.
49. Provide all new concrete equipment/housekeeping pads, including formwork.
Coordinate pad dimensions, elevations, reinforcement, housekeeping height, anchor requirements, edge clearances, and equipment access with the applicable equipment contractor before placement.
50. Provide concrete crack repairs at locations identified in the Contract Documents.
Route, clean, and fill cracks per the structural details, including the specified depth-to-width relationship, joint filler or crack adhesive, backer rod, silica sand, and finishing requirements.
51. Repair chipped, cracked, stained, honeycombed, or otherwise damaged new concrete caused by this contractor.
52. Coordinate interior slab finishes with the Flooring contractor.
53. Provide broom finish at exterior walking surfaces and other locations shown.
54. Do not add water to concrete surfaces during finishing.
55. Provide concrete delivery tickets, batch information, and placement records required by the specifications for slump, air content, temperature, unit weight, and compressive-strength testing.
56. Provide all contraction, construction, expansion, and isolation joints, including dowels, preformed joint filler, bond breakers, and accessories required by the drawings and specifications.
57. Submit joint layouts where required before concrete placement.
58. Coordinate interior joints with walls, columns, doors, flooring layouts, drains, slab depressions, and equipment pads.
59. Coordinate exterior joints with building lines, curb lines, paving patterns, stoops, steps, ramps, adjacent concrete, and existing improvements.
60. Sawcut contraction joints in newly placed concrete within the time required by the
Contract Documents to prevent uncontrolled cracking.
61. Provide specified slab flatness, levelness, elevation, slope, finish, and surface tolerances. Correct nonconforming new concrete at no added cost.
62. Cure concrete per the specifications, approved mix requirements, and applicable
ACI requirements.
63. Provide hot-weather and cold-weather protection required to complete the scheduled work.
64. Use curing products compatible with flooring, coatings, adhesives, waterproofing, sealants, and other subsequent finishes.
65. Protect completed concrete from traffic, weather, staining, impact, cutting operations, equipment leaks, and damage.
66. Prevent concrete spatter from reaching adjacent construction. Promptly clean affected surfaces without damaging finishes.
67. Do not permit traffic or loading on concrete before the required curing period or concrete strength has been achieved.
68. Coordinate with the Owner’s testing and special-inspection agencies.
69. Correct deficient or nonconforming work at no added cost.
70. Pay for additional testing resulting from failed tests or deficient work when required by the Contract Documents.
71. Provide new flowable fill (engineered fill) at new frost protected door threshold per detail 10/S201 at the Middle School.
72. Coordinate with Sitework contractor for installation of stainless channel drain per
Sheet L014 at the Middle School. Channel drain furnished and installed by Sitework contractor.
EXCLUSIONS
1. Exterior work reserved for Bid Category 33A, including excavation, earthwork, granular fill, subgrade preparation, undercutting, soil stabilization, backfill, aggregate-base installation, grading, and compaction.
2. Asphalt paving and asphalt patching.
3. Underground utility piping, trench drains, channel drains, catch basins, manholes, valve boxes, and utility structures, except forming or pouring concrete around properly installed items.
4. Foundation waterproofing, dampproofing, and foundation drainage systems.
5. Masonry, masonry grout, and masonry reinforcing, except concrete reinforcing dowels and embeds specifically assigned to this Bid Category.
6. Structural and miscellaneous steel, except receiving and installing items furnished by others for installation in concrete.
7. Finish flooring, tile, carpet, coatings, flooring underlayments, skim coats, patching compounds, and leveling materials required solely for finish flooring.
8. Final grading, topsoil, seeding, planting, and landscaping.
9. Owner-provided concrete testing and special-inspection services.
10. General architectural joint sealants not located within or directly adjoining concrete work included in this Bid Category.
11. General repair of unidentified existing cracks or existing damaged concrete.
12. Sawcutting and demolition of existing exterior concrete scheduled to be removed, unless specifically directed by Clark Construction Company.
13. Excavation and backfill of subgrade associated with interior slabs removed for
MEP work.
14. Sawcutting and removal of interior slabs on grade required for demolition purposes and new MEP and structural footings.
ALLOWANCES:
1. Provide an allowance of $15,000 to be utilized at the direction of Clark
Construction Company.
UNIT PRICING (Section 012200):
• Provide unit pricing (SF) for removal and replacement of interior concrete slab-on-grade.
ALTERNATE PRICING:
• ALTERNATE A4: Tunnel infill in lieu of crack repair (Refer to photos and approximate location of existing tunnel provided by Clark Construction
Company) o Include:
▪ Engineered fill
▪ New slab on grade in accordance with specification requirements o Exclude:
▪ Sawcutting and demolition of tunnel lid and structure
▪ Asbestos abatement
▪ Pipe removal from tunnel
Bid Category 09B – Carpet, Resilient Flooring & Hard Tile
BID CATEGORY 09B – Carpet, Resilient Flooring & Hard Tile responsible to perform all work reasonably interpreted to be included in its scope of work
BASE SPECIFICATION(S)
Include ALL WORK specified or reasonably inferred
093000 TILING
096500 RESILIENT FLOORING
096513 RESILIENT BASE AND ACCESSORIES
096813 TILE CARPETING
of this Bid Category.
079200 JOINT SEALANTS
Include (Furnish and Install u.n.o):
Other Forms.
2. Provide all carpet tile, resilient sheet flooring, resilient base and accessories, porcelain tile, quarry tile, mosaic tile, tile base, setting materials, grout, adhesives, transitions, profiles, accessories, and related Work shown in the Contract
Documents and included in this Bid Category.
3. Furnish required product data, shop drawings, samples, maintenance data, and other submittals specified for materials in this Bid Category.
4. Field verify dimensions, finish limits, patterns, transitions, existing conditions, substrate conditions, and adjacent materials before ordering or installing flooring.
5. Coordinate Work with Clark Construction Company and affected trades, including required slab depressions, substrate elevations, floor-box locations, door clearances, millwork, food-service equipment, plumbing fixtures, floor drains, and adjacent finishes.
6. Delete the automatic equal cost-sharing provision for coordination conflicts.
Correct Work attributable to this Bid Category and promptly report conflicts or discrepancies to Clark Construction Company before proceeding.
7. Store materials per manufacturer requirements and off the floor on pallets, carts, or other movable supports. Protect materials from moisture, damage, contamination, and temperature extremes.
8. Provide temporary supplemental lighting necessary to properly inspect substrates and perform high-quality installation.
9. Inspect all substrates and surfaces scheduled to receive flooring or tile. Verify substrate condition, compatibility, dryness, flatness, cleanliness, and readiness for installation. Report unacceptable conditions to Clark Construction Company in writing before proceeding.
10. Verify curing compounds, sealers, hardeners, coatings, and other substrate treatments are compatible with specified adhesives, setting materials, flooring, and tile products.
11. Perform substrate moisture, alkalinity/pH, adhesion, and other testing required by the specifications and flooring/material manufacturers before installation. For resilient flooring, Section 09 65 00 requires manufacturer-recommended alkalinity/adhesion tests and ASTM F2170 relative-humidity testing with each test area not exceeding 1,000 square feet and at least three tests in each installation area.
12. For carpet tile, perform moisture testing and any additional moisture tests recommended in writing by the adhesive and carpet-tile manufacturers. Proceed only after substrates pass required testing.
13. Prepare concrete substrates per flooring/tile manufacturer requirements and applicable specification requirements. Remove incompatible coatings, curing compounds, sealers, adhesives, contaminants, high spots, projections, and substances that would interfere with adhesion.
14. Provide scraping, sanding, grinding, filling, patching, feathering, and leveling required to produce substrates acceptable for flooring and tile installation.
15. Fill cracks, holes, depressions, and irregularities with compatible trowelable leveling or patching compound and remove bumps/ridges as required to provide uniform, smooth substrates.
16. At existing-building areas where existing flooring is removed and new resilient flooring is installed, provide trowel-applied underlayment over the entire surface receiving resilient flooring.
17. At carpet-tile areas where existing flooring is removed and the substrate requires leveling or skim coating, provide trowel-applied underlayment per Section 09 68
13.
18. Broom, sweep, and vacuum substrates immediately before flooring installation per the applicable specification.
19. Coordinate required substrate elevations and transitions between carpet, resilient flooring, tile, existing flooring, and other adjacent finish materials.
20. Furnish and install resilient sheet flooring RSF01, RSF02, and RSF03 at locations, extents, colors, and patterns indicated on the Drawings.
21. Heat weld all resilient sheet-flooring seams using the manufacturer's recommended welding rod matching the flooring.
22. Provide full-spread adhesive and install resilient flooring tightly to walls, fixtures, cabinets, pipes, outlets, door frames, toe spaces, door reveals, closets, and similar conditions as specified.
23. Furnish and install resilient flooring within applicable electrical/telephone floor-box and duct covers, maintaining continuity of flooring color and pattern across the cover and adjacent floor.
24. Furnish and install resilient wall base and accessories shown in the Contract
Documents.
25. Furnish and install resilient transitions and reducer strips where indicated. Butt transitions tightly to adjacent materials, fully adhere to substrates, and center flooring transitions beneath door leaves at door openings.
26. Acclimate resilient flooring and installation materials as specified.
27. Furnish and install new modular carpet tile at locations indicated, including specified patterns, orientation, layout, adhesives, transitions, and resilient base.
28. Prepare and submit carpet-tile shop drawings identifying carpet types, locations, installation patterns, direction, seam/grid layout, transitions, and areas of existing carpet-tile patching at Ealy Elementary.
29. Provide glue-down carpet-tile installation using full-spread releasable pressure-sensitive adhesive per Section 09 68 13.
30. Provide carpet-tile patching at Ealy Elementary where indicated, coordinating new material with existing flooring conditions and the approved shop-drawing layout.
31. Coordinate removal of existing carpet tile with Section 01 35 43.19, Carpet Tile
Reclamation, where existing carpet tile is designated for landfill diversion.
32. Provide specified walk-off carpet tile CPT01 and other scheduled carpet products where indicated on the finish drawings.
33. Furnish and install hard tile Work indicated, including porcelain tile, quarry tile, mosaic tile, tile base, grout, setting materials, edge/transition profiles, and accessories.
34. Install tile and setting materials per applicable TCNA and ANSI installation requirements specified in Section 09 30 00.
35. Provide required substrate patching and leveling for tile, including filling cracks, holes, and depressions with patching materials recommended by the tile-setting-material manufacturer.
36. Provide tile mortar coverage required by the specifications, including 95-percent coverage at wet-area floor tile, floor tile 8 by 8 inches or larger, and rib-backed floor tile.
37. Extend tile into recesses and under or behind equipment and fixtures where required to provide a complete installation and terminate tile neatly at obstructions, edges, and corners while maintaining pattern and joint alignment.
38. Furnish and install tile edge, transition, and movement-joint profiles shown in the
Contract Documents.
39. Provide porcelain and quarry-tile cove base where scheduled, including PTB01 and QTB01 at applicable locations indicated by the finish drawings.
40. Provide the specified grout associated with each tile type and coordinate grout color with the approved material schedule.
41. Provide square outside corners at locations finished with wall tile per the Middle
School architectural drawings.
42. Provide tile-related sealants assigned to this Bid Category. Coordinate expansion, contraction, control, and isolation-joint sealants with Section 07 92 00.
43. Furnish and install transition/reducer materials specifically associated with flooring and tile Work where indicated or necessary to provide the specified transition between flooring materials.
44. Coordinate flooring elevations so installed transitions do not create unacceptable abrupt changes in elevation.
45. Provide sealants associated specifically with flooring and tile installation where assigned to this Bid Category, including flooring termination joints and tile-to-adjacent-finish conditions where indicated.
46. Protect walls, doors, frames, millwork, equipment, and other adjacent finished surfaces from flooring and tile operations. Repair damage caused by this Bid
Category.
47. Barricade and protect flooring and tile installation areas from traffic until adhesives, grout, setting materials, leveling compounds, and sealants are adequately cured for use. Remove barricades when protection is no longer required.
48. Clean completed flooring and tile per manufacturer requirements, including removal of excess adhesive, grout residue, loose carpet fibers, sealants, installation debris, and markings.
49. Protect completed flooring after installation per the flooring manufacturer's requirements.
50. Furnish specified attic/maintenance materials, packaged, labeled, protected, and delivered to the location directed by Clark Construction Company.
51. Provide extra carpet tile equal to 5 percent of the newly installed quantity of each type, but not less than 10 sq. yd. of each type.
52. Provide extra tile and trim units equal to 3 percent of the amount installed for each type, composition, color, pattern, and size indicated.
1. Demolition and removal of existing floor coverings assigned to Bid Category
02A, except minor removal specifically required as part of flooring preparation and expressly assigned to this Bid Category.
2. Structural concrete repair, slab demolition, slab replacement, and concrete placement.
3. General grinding/removal of existing adhesives and mastics assigned to Selective
Demolition, except final substrate preparation, skim coating, patching, feathering, leveling, and underlayment required for flooring installation.
4. Painting and concrete sealer assigned to Bid Category 09C.
5. Resilient or hard-surface flooring protection furnished by other trades for their operations after acceptance, except protection expressly required by the flooring specifications.
ALTERNATES:
• PT01-A5: Mosaic tile as an alternate to standard PT01 porcelain tile. [Refer to
Sheet I001 for Whitehall Middle School]
Bid Category 26A – Electrical, Low Voltage & Fire Alarm
BID CATEGORY 26A – Electrical, Low Voltage & Fire Alarm responsible to perform all work reasonably interpreted to be included in its scope of work in accordance with the drawings and specifications in addition to these Bid Category notes of clarification.
BASE SPECIFICATION(S)
Include ALL WORK specified or reasonably inferred
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 01 GENERAL REQUIREMENTS
078413 PENETRATION FIRESTOPPING
079200 JOINT SEALANTS
101423 PANEL SIGNAGE
DIVISION 26 ELECTRICAL
DIVISION 27 COMMUNICATIONS
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
of this Bid Category.
015000 TEMPORARY FACILITIES AND CONTROLS
114000 FOOD SERVICE EQUIPMENT
230934 VARIABLE-FREQUENCY MOTOR CONTROLLERS
233400 EXHAUST FANS AND ACCESSORIES
235216 CONDENSING BOILERS
236314 AIR COOLED CONDENSING UNITS (LESS THAN 5 TONS)
237300 INTERIOR CENTRAL STATION AHU
237414 RT HVAC UNITS
238123 SUPPLEMENTAL COOLING UNITS
238200 SPACE HEATING EQUIPMENT
238216 HYDRONIC AIR COILS
238223 UNIT VENTILATORS
ASBESTOS ABATEMENT SURVEY
LEAD-BASED PAINT SURVEY
Other Forms.
2. Provide all labor, material, equipment, supervision, permits, inspections, testing, programming, commissioning assistance, and accessories required for complete Electrical, Low Voltage/Technology, and Fire Alarm systems as shown in the Contract Documents, including applicable Division 26, Division 27, and Division 28 specifications. Applicable sections include Division 26 electrical sections, Section 27 05 28 – Pathways for Communication Systems, Section 27 10 00 – Low Voltage Cabling, and Section 28 31 63 – Fire Alarm and Detection System – Voice.
3. Submit the MEP Cost Breakdown as a start-up submittal for approval.
4. Coordinate the layout and routing of electrical, communications, technology, fire alarm, raceways, equipment, devices, and supports with architectural, structural, mechanical, plumbing, fire suppression, food-service, roofing, and other trade work.
5. Prepare required coordinated shop drawings at an appropriate scale and participate in formal MEP coordination before installation. Correct conflicts that reasonably should have been identified through coordination at no added cost.
6. Coordinate all openings, sleeves, inserts, embeds, supports, and penetrations before walls, masonry, slabs, ceilings, and other construction are closed. Provide drawings identifying required structural openings, including sizes and locations.
7. Be present as required during masonry installation and concrete placement for electrical/technology/fire-alarm rough-ins, sleeves, boxes, inserts, and below-slab work. Maintain required locations and elevations.
8. Furnish all hangers, supports, Unistrut, equipment supports, seismic/support components where required, and miscellaneous supporting steel necessary for the Work.
9. Furnish access panels required specifically for accessibility to this Work where panels are not otherwise indicated. Coordinate type, size, and location with Clark Construction Company before ordering.
10. Furnish sleeves required for this Work where not indicated for installation by others. Provide layout and assistance with placement.
11. Provide coring, drilling, cutting, and openings required for this Work except concrete cutting specifically assigned to the Selective Demolition contractor.
Clearly mark required demolition contractor cutting before work occurs.
12. Provide firestopping of penetrations through rated assemblies resulting from this Work.
13. Provide joint sealants/caulking associated with penetrations and installations of this bid category, including interior and exterior penetrations, unless shown to be furnished by another trade.
14. Repair damage directly caused by this Bid Category. Coordinate required architectural patching and restoration resulting from planned Electrical/LV/Fire Alarm Work with the applicable architectural finish Bid Categories.
15. Furnish and install blank cover plates at new or existing unused boxes and boxes abandoned as part of this Work.
16. Provide appropriate protection of existing roofing while performing Electrical/LV/Fire Alarm work and coordinate roof penetrations with the Roofing contractor. Maintain applicable roofing warranties.
17. before demolition activities, coordinate with Clark Construction Company, the Selective Demolition Contractor, and affected MEP trades to identify all electrical, low-voltage/technology, and fire alarm systems and equipment to remain, be removed, relocated, or maintained temporarily. Clearly identify equipment and systems designated for physical demolition by the Selective Demolition Contractor.
18. The Electrical Contractor shall trace, identify, disconnect, de-energize, cut, cap, terminate, and make safe all electrical feeds, conductors, raceways, controls, and connections serving electrical equipment and systems scheduled for demolition by the Selective Demolition Contractor. Verify such equipment and systems are de-energized and safe for demolition before releasing them for physical removal.
19. Physical demolition, removal, hauling, and disposal of existing major electrical equipment and associated abandoned distribution components is by the Selective Demolition Contractor after the Electrical Contractor has completed the required disconnection and make-safe work. This includes existing main distribution equipment, switchboards, transformers, panelboards, large disconnects, associated abandoned conduit/raceways, and similar electrical equipment designated for demolition.
20. The Electrical Contractor shall perform electrical, low-voltage/technology, and fire alarm demolition specifically assigned to the Electrical Bid Category, including removal, relocation, temporary support, modification, and reconnection of devices, wiring, conduit, raceways, and other components necessary to accommodate the new Work, except physical demolition specifically assigned to the Selective Demolition Contractor.
21. Remove abandoned conductors from conduit and raceways where required under the Contract Documents. Removal of conduit, raceways, supports, and associated electrical equipment designated for physical demolition by the Selective Demolition Contractor is excluded from the Electrical scope after the Electrical Contractor has disconnected, cut, capped, and made the systems safe.
22. Maintain electrical, communications, security, fire alarm, and other existing systems serving occupied portions of the building. Coordinate all required shutdowns, temporary services, interruptions, and restoration of service with Clark Construction Company.
23. Coordinate the sequence of shutdown, disconnection, make-safe work, and physical demolition with Clark Construction Company and the Selective Demolition Contractor. Do not release equipment or systems for demolition until required shutdowns have been completed and temporary or replacement systems are operational where necessary to maintain service to occupied portions of the building.
24. Provide temporary relocation, support, and reconnection of existing electrical/LV/fire-alarm devices where ceilings, walls, or other construction must be removed and replaced.
25. Furnish and install all new electrical distribution equipment indicated, including switchboards, panelboards, transformers, circuit breakers, overcurrent protection, surge protection, disconnect switches, motor disconnects, raceways, conductors, grounding, boxes, and associated equipment.
26. Provide modifications to existing distribution equipment, panels, feeders, and branch circuits as indicated.
27. Provide all grounding and bonding required for complete electrical, communications, and fire-alarm systems.
28. Provide complete wiring and raceway systems for receptacles, devices, equipment, branch circuits, feeders, and miscellaneous electrical loads indicated.
29. Provide electrical identification and labeling, including panel directories, equipment labels, raceway/system identification, conductors, and devices as required.
30. Furnish and install disconnects for mechanical and other equipment unless shown to be furnished with the equipment. Install disconnects furnished by others where indicated. Disconnecting means shall be lockable where required.
31. Furnish and install motor starters where required under the electrical Contract Documents and not furnished as an integral part of equipment furnished by others.
32. Install VFDs furnished by others where indicated, including required power wiring, raceway, grounding, and connections. Coordinate control interfaces with the Controls contractor.
33. Provide final electrical connections to equipment furnished by the Owner and other contractors, including mechanical, plumbing, fire suppression, food-service, architectural equipment, doors/operators, appliances, and similar equipment. Field verify actual voltage, phase, load, disconnecting means, connection location, and manufacturer's requirements before rough-in.
34. Provide electrical power and required connections for HVAC equipment including unit ventilators, air-handling/fan-coil equipment, boilers, pumps, condensing units, exhaust fans, cabinet/unit heaters, and associated equipment indicated. Both Middle School and Ealy drawings contain extensive new mechanical equipment power requirements.
35. Provide electrical work for fire suppression equipment, including power and required connections/interfaces associated with flow switches, tamper switches, and related devices.
36. Provide power and required electrical connections for food-service equipment at the Middle School, including equipment indicated on the electrical and food-service drawings.
37. Furnish and install complete interior lighting, emergency lighting, exit lighting, lighting controls, occupancy sensors, power packs, control devices, branch circuiting, and related equipment indicated.
38. Provide exterior electrical and exterior lighting Work indicated by the electrical Contract Documents, including wiring, raceways, underground work, connections, bases/support coordination, and restoration.
39. Provide excavation, trenching, bedding, warning tape, initial backfill, final backfill, and compaction required specifically for underground Electrical/LV Work. Restore earth subgrades disturbed by this Work. Final asphalt paving, concrete paving, topsoil, landscape fine grading, seeding, hydroseeding, and permanent vegetative restoration are by the respective Sitework, Concrete, and Landscaping Bid Categories.
40. Provide all interior excavation, subgrade removal, backfill, and compaction required for below-slab MEP work. Concrete slab-on-grade removal and replacement is by others.
41. Restore areas disturbed solely by Electrical/LV/Fire Alarm underground Work to the condition/configuration required by the Contract Documents. Coordinate final surface restoration performed by paving, concrete, landscaping, or applicable trades.
42. Provide, maintain, modify, and remove temporary electrical service, temporary power, temporary distribution, and temporary wiring required by the Contract Documents.
43. Provide and maintain temporary lighting required for construction operations, including required illumination and associated temporary wiring and distribution.
44. The project manual contains a dedicated Section 26 60 00 – Temporary Service and Wiring, which includes maintaining the temporary power and lighting facilities during standard working hours.
45. Provide complete Division 27 Work shown in the Contract Documents including communications pathways, raceways, boxes, cabling, cable supports, terminations, testing, labeling, documentation, and other components assigned to this contractor.
46. Provide communications/technology raceways, boxes, sleeves, pathways, pull strings, and cable supports indicated.
47. Provide the low-voltage cabling Work identified in Section 27 10 00 and on the Technology drawings, including installation, termination, testing, labeling, documentation, record information, and closeout requirements.
48. Coordinate all data, telecommunications, security, camera, PA/intercom, AV, classroom technology, room technology, and other technology systems indicated on the drawings. Furnish/ install only the components assigned to this bid category by the Contract Documents.
49. Where technology equipment itself is Owner-furnished or provided by others, provide the required pathways, raceways, boxes, sleeves, cable supports, and other infrastructure indicated for that system.
50. Coordinate technology outlet/device locations with architectural finishes, casework, furniture, displays, projectors, equipment, and Owner equipment before rough-in. Both drawing sets establish coordinated mounting/alignment requirements for voice/data and other low devices.
51. Provide required low-voltage system testing, certification, labeling, record documentation, equipment information, and training.
52. Provide a complete, fully operational voice fire-alarm/detection system per Section 28 31 63, drawings, applicable codes, and AHJ requirements, including engineering/shop drawings where required, equipment, raceways, wire, devices, programming, testing, certification, and integration with existing systems.
53. Provide fire-alarm control units/panels, annunciators, power supplies, batteries, addressable modules, manual stations, smoke detectors, heat detectors, carbon monoxide detectors, notification appliances, speakers/strobes, magnetic door-holder interfaces, duct detectors/associated components, wiring, conduit, and accessories indicated or required by the specified system.
54. Provide all fire-alarm wiring in conduit.
55. Provide required fire-alarm monitoring communication equipment and programming.
56. Provide fire-alarm connections and addressable interfaces to equipment and systems including sprinkler waterflow/tamper switches, duct smoke detectors, smoke dampers, fan shutdown, emergency gas/fuel shutoff, electric door locks, magnetic door holders, and other devices indicated.
57. Coordinate duct-detector locations and installation with the Mechanical contractor. Provide necessary fire-alarm modules, remote test stations, wiring/conduit, and fan-shutdown connections.
58. Coordinate smoke damper/fire-smoke damper connections and required fire-alarm interfaces with the Mechanical and Controls contractors.
59. Coordinate fire-alarm interfaces with the existing systems. At the Middle School, the code documents specifically identify a new voice-enabled fire-alarm panel serving the cafeteria and monitoring the existing system.
60. Obtain required fire-alarm permits/approvals and submit fire-alarm shop drawings to the authorities having jurisdiction as required.
61. Coordinate, schedule, perform, and attend fire-alarm system testing and acceptance with the Owner, Fire Marshal/AHJ, manufacturer's representative, and required parties. Provide test reports and completion documentation.
62. Provide fire-alarm record drawings, O&M information, programming/database files and passwords, records of completion, inspection/testing documentation, training, and specified extra materials.
63. Coordinate all electrical, low-voltage, technology, fire-alarm, and utility shutdowns, tie-ins, service interruptions, and system transfers with Clark Construction Company. Do not interrupt systems serving occupied areas without prior authorization and an approved shutdown plan.
64. Include off-hours work required for critical shutdowns, cutovers, fire-alarm interruptions, or other work that cannot reasonably be performed while the school is occupied, when required by the project logistics and approved schedule.
65. Maintain temporary power and life-safety systems as required to keep occupied portions of the buildings safe and operational during phased construction.
66. Closeout / Testing / Commissioning
67. Test electrical systems and equipment per the Contract Documents, including required equipment/system startup, functional testing, system demonstrations, and inspection documentation.
68. Participate in coordination with the commissioning authority for electrical components serving commissioned HVAC systems, including providing access, power, assistance, documentation, and qualified personnel necessary to support functional testing.
69. Maintain accurate Electrical, Low Voltage/Technology, and Fire Alarm record/as-built drawings throughout construction and submit final record information at closeout.
70. Provide O&M manuals, test reports, certifications, warranties, training, system documentation, software/database files, and other closeout materials required by the applicable specification sections.
71. Provide Owner training for electrical, low-voltage/technology, and fire-alarm systems furnished under this bid category.
72. Coordinate system demonstrations and training with Clark Construction Company and the Owner, and provide required training documentation/recordings where specifically required by the Contract Documents.
73. Warranty Work beginning per the Contract Documents. For the fire-alarm system, comply with its specific warranty requirements rather than relying solely on the generic one-year warranty language.
74. Store materials and equipment off the floor on pallets, carts, dunnage, or other movable/protective supports.
75. At start of project, identify long-lead electrical, low-voltage, technology, and fire-alarm equipment and provide current lead times. Provide separately identified pricing for approved expediting when requested.
76. Provide all electrical and fire alarm wiring, connections, relays, modules, and interlocks required between the kitchen hood wet-chemical fire suppression system, building fire alarm system, hood exhaust system, make-up air/HVAC systems, and electrical equipment beneath the hood. Coordinate requirements with the Food Service Equipment Contractor and HVAC Contractor.
77. Before removal of existing food-service equipment by Bid Category 11A, de-energize, disconnect, cut, cap or terminate, and make safe all electrical, low-voltage, and fire-alarm connections serving the equipment, as applicable. Physical removal, handling, storage, and reinstallation of food-service equipment is by Bid Category 11A.
78. Include decorative “Viking” panel sign at cafeteria ceiling.
79. Provide complete firestopping of all penetrations through fire- and smoke-rated assemblies associated with this Bid Category, including existing penetrations where new rated assemblies are constructed around them.
80. Coordinate with the Owner’s Asbestos Abatement Contractor for all required penetrations, hangers, supports, and other attachments at or through asbestos-containing ceilings, as indicated on the Interior Logistics Plan.
81. Provide all core drilling, cutting, and penetrations through existing wall and floor assemblies required for installation of this Bid Category’s Work, including coordination and layout of penetration locations.
82. Perform worker exposure assessments and implement applicable lead-safe work practices for operations that may disturb lead-containing materials.
83. Removal of all existing electrical equipment within Room B117. Coordinate shutdown and replacement to minimize downtime. Provide a generator for temporary power if outage will last longer then one weekend.
1. Physical demolition, hauling, and disposal of major electrical distribution equipment and associated abandoned distribution components specifically assigned to Bid Category 02A, after systems have been de-energized, disconnected, terminated, capped, and made safe by this Bid Category.
2. Physical removal, handling, storage, transportation, and reinstallation of existing…
This is the start of the file's text. The full file is on GovTribe.