00 - Addendum 02 - Summary.pdf

PDF 142 KB Posted

Attached to
WDS Bond Proposal Phase 1- Ealy, Middle School, Shoreline
Solicitation number
RFP WDS 270000000188 3
Issued by
Oakland County, Michigan

About this file

This is Addendum No. 02 issued by Clark Construction Company on November 6, 2026, for Whitehall District Schools' Phase 1 Projects, which includes construction at Whitehall Middle School, Ealy Elementary, and Shoreline Elementary. The addendum modifies bidding documents and establishes a revised bid due date of Friday, November 13, 2026, at 10:00 AM (ET). The addendum consists of narrative guidance, revised Bid Category Descriptions, and documents from Pure Architects, including revised drawings for Whitehall Middle School (sheets G002, D101B, S101B, A120, A421, I001) and Ealy Elementary (sheets G002, D101C, A201). Where Addendum No. 02 conflicts with previously issued bidding documents, the addendum governs. Bidders must review all addendum materials, incorporate cost effects into their bids, and acknowledge receipt of Addendum No. 02 with their submission. The project is being delivered using the Construction Manager as Adviser method, with trade contracts held directly by Whitehall District Schools and utilizing modified AIA A132-2019, A132-2019 Exhibit A, and modified AIA A232-2019 contract documents.

Key changes outlined in Addendum No. 02 include revisions to Bid Category 01B (Commissioning), which adds building envelope and lighting controls commissioning requirements while clarifying that bid security and bonds are not required; Bid Category 03A (Concrete Allowances), which revises the allowance to $15,000 to be directed by Clark Construction Company; Bid Category 09B (Carpet, Resilient Flooring & Hard Tile), which renames Alternate PT01-A4 to Alternate PT01-A5; Bid Category 26A (Electrical, Low Voltage & Fire Alarm), which removes responsibility matrix references from technology systems coordination; and Bid Category 31A (Site Work & Site Utilities), which corrects page footer editorial changes with no scope modifications. Thirteen bid categories remain unchanged. Pre-bid Requests for Information (RFI #006 through #016) are recorded and provided, with RFI #001 through #005 previously included in Addendum #01.

View the file

Other files

File Type Posted
01a - Pure Architects Bid Addendum 01.pdf PDF
01b - Millies Engineering Bid Addendum 01.pdf PDF
06 - Middle School Asbestos Survey 20260506.pdf PDF
01 - Pure Architects Addendum 02.pdf PDF
03 - Section 012300 - Alternates.pdf PDF
20261021 Phase 1 Project Schedule.pdf PDF
08 - Middle School OSHA Paint Sampling 20260914.pdf PDF
04 - Whitehall Middle School Interior Logistics Plan.pdf PDF
02 - Section 002416 Bid Category Specific Notes.pdf PDF
26 0930 WDS Ealy CD Drawings.pdf PDF
26 0930 WDS MS CD Drawings.pdf PDF
00 - Addendum 01 - Summary.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part1.pdf PDF
Ealy Site Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part2.pdf PDF
02 - Section 002416 - Bid Categories.pdf PDF
04 - Pre-bid RFIs Addendum 2.pdf PDF
07 - Ealy Asbestos Survey 20260501.pdf PDF
10 - 20261029 Pre-Bid Meeting.pdf PDF
05 - Middle School Existing Tunnel Location.pdf PDF
20261021 Clark Construction Project Manual.pdf PDF
09 - Ealy OSHA Paint Sampling 20260914.pdf PDF
Shoreline Logistics Plan.pdf PDF
11 - Pre-Bid RFIs Addendum 01.pdf PDF
03 - Section 012300 - ALTERNATES.pdf PDF
26 0930 WDS Shoreline CD Drawings.pdf PDF
WDS Middle School Logistics Plan.pdf PDF
26 0930 WDS Phase 1 - Project Manual_Part3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Whitehall District Schools – Phase 1 Projects

Bid Release No. 01

Addendum No. 02

Date of Issue November 6, 2026

Issued By Clark Construction Company

Contact Tom Brennan, Project Manager (tbrennan@clarkcc.com)

Projects Whitehall Middle School, Ealy Elementary and Shoreline Elementary

General

Addendum No. 02 forms part of the Bidding Documents and consists of this narrative, the revised Bid

Category Descriptions (Section 002416, Scope of Work – Bid Category Specific Notes) identified as

"Addendum 02" in the header, the Addendum 02 documents issued by Pure Architects, and the other documents provided for reference. Where Addendum No. 02 conflicts with previously issued Bidding

Documents, Addendum No. 02 governs.

Bidders shall review all Addendum No. 02 documents, including the Pure Architects Addendum 02 documents and other reference documents, and shall include their cost effect in their bid and acknowledge receipt of Addendum No. 02 with their bid submission. Item numbers below refer to the revised Bid

Category Descriptions. Where items were added or deleted, subsequent items within the same list have been renumbered; renumbering and pagination changes alone are not listed.

Date Changes:

• Bid due date and time revised to Friday, November 13, 2026, at 10:00 AM (ET)

Notes:

• Bidders are advised that this Project is being delivered using the Construction Manager as

Adviser method, with trade contracts held directly by Whitehall District Schools. Contracts will utilize a modified AIA A132-2019, A132-2019 Exhibit A, Insurance and Bonds, and modified

AIA A232-2019. The modified contract documents are currently being finalized and are anticipated to be issued with the final Addendum early next week.

Documents Provided

01. A/E Provided Documents:

a. Addendum No. 02 dated 11/06/2026 from Pure Architects, including:

i. Whitehall Middle School revised drawings: G002, D101B, S101B, A120, A421, I001

ii. Ealy Elementary revised drawings: G002, D101C, A201

02. Section 002416 Bid Category Specific Notes (Revised per Addendum 02)

a. Reference Summary of Changes and Changes by Bid Category below for additional information.

03. Section 012300 Alternates (Revised per Addendum 02) – Added:

a. Whitehall Middle School Alternate PT01-A4 renamed to PT01-A5

b. Supporting documents for Clark Alternate 01 and 02 previously included in Addendum

#01

04. Pre-bid RFI’s recorded to date (RFI #006 through #016)

a. Pre-bid RFI’s #001 through #005 previously included in Addendum #01

Summary of Changes

Bid Category Summary of Change

01B – Commissioning Base specifications revised; building envelope and lighting controls commissioning added; lighting controls removed from exclusions; bid security and bonds clarified as not required.

03A – Concrete Allowance revised to a $15,000 allowance to be utilized at the direction of Clark Construction Company.

09B – Carpet, Resilient Flooring

& Hard Tile

Alternate PT01-A4 renamed to Alternate PT01-A5

26A – Electrical, Low Voltage &

Fire Alarm

References to the responsibility matrix deleted from technology systems coordination.

31A – Site Work & Site Utilities Page footers corrected; no change to scope.

Changes by Bid Category

Bid Category 01B – Commissioning

Base Specification

• Delete Section 002413, Scope of Work General Notes.

• Add Division 00, Procurement and Contracting Requirements, and Division 01, General

Requirements. Section 230800, Commissioning of HVAC Systems, remains.

Include

• Item 19 – Added: “Provide all required building envelope and lighting controls commissioning for applicable areas of construction in accordance with the referenced Energy Code standards.”

Exclude

• Item 4 – Revised. “Lighting-control” is deleted from the list of excluded systems. Revised to read: “Commissioning of plumbing, fire-protection, fire-alarm, electrical power-distribution, emergency-power, communications, security, and other electrical or low-voltage systems, except for interfaces specifically required to functionally test commissioned HVAC equipment and systems.”

• Item 5 – Added: “Bid security, performance bond, and payment bond are not required for Bid

Category 01B.”

Bid Category 03A – Concrete

Allowances

• Allowance 1 – Revised to read: “Provide an allowance of $15,000 to be utilized at the direction of

Clark Construction Company.” The allowance was previously limited to replacement of concrete sidewalks damaged as a result of construction operations.

Bid Category 09B – Carpet, Resilient Flooring & Hard Tile

Alternates

• Alternate PT01-A4 renamed to Alternate PT01-A5. No changes to alternate description.

Bid Category 26A – Electrical, Low Voltage & Fire Alarm

Include

• Item 48 – Revised to read: “Coordinate all data, telecommunications, security, camera, PA/intercom, AV, classroom technology, room technology, and other technology systems indicated on the drawings. Furnish/install only the components assigned to this bid category by the Contract Documents.” References to the applicable responsibility matrix are deleted.

Bid Category 31A – Site Work & Site Utilities

Editorial

• Page footers are corrected to read “Bid Category 31A – Site Work & Site Utilities” (previously

“Bid Category 01A – Site Work & Site Utilities”). There is no change to scope.

Bid Categories Not Changed

No changes were made to the following Bid Categories: 01A – Final Cleaning; 02A – Selective

Demolition; 04A – Masonry; 05A – Structural & Miscellaneous Steel; 06A – Rough & Finish Carpentry

& General Trades; 07A – Roofing; 08A – Entrances & Storefronts, Windows, Glass & Glazing; 09A –

Metal Studs, Gypboard, Acoustical Ceilings & EIFS; 09B – Carpet, Resilient Flooring & Hard Tile; 09C

– Painting & Wall Covering; 11A – Food Service Equipment; 23A – HVAC & Plumbing (Whitehall

Middle School); 23B – HVAC & Plumbing (Ealy Elementary); and 32A – Landscaping

End of Addendum No. 02

General
Date Changes:
Notes:
Documents Provided
Summary of Changes
Changes by Bid Category
Bid Category 01B – Commissioning
Base Specification
Include
Exclude
Bid Category 03A – Concrete
Allowances
Bid Category 09B – Carpet, Resilient Flooring & Hard Tile
Alternates
Bid Category 26A – Electrical, Low Voltage & Fire Alarm
Include
Bid Category 31A – Site Work & Site Utilities
Editorial

Bid Categories Not Changed