This is Addendum No. 02 issued by Clark Construction Company on November 6, 2026, for Whitehall District Schools' Phase 1 Projects, which includes construction at Whitehall Middle School, Ealy Elementary, and Shoreline Elementary. The addendum modifies bidding documents and establishes a revised bid due date of Friday, November 13, 2026, at 10:00 AM (ET). The addendum consists of narrative guidance, revised Bid Category Descriptions, and documents from Pure Architects, including revised drawings for Whitehall Middle School (sheets G002, D101B, S101B, A120, A421, I001) and Ealy Elementary (sheets G002, D101C, A201). Where Addendum No. 02 conflicts with previously issued bidding documents, the addendum governs. Bidders must review all addendum materials, incorporate cost effects into their bids, and acknowledge receipt of Addendum No. 02 with their submission. The project is being delivered using the Construction Manager as Adviser method, with trade contracts held directly by Whitehall District Schools and utilizing modified AIA A132-2019, A132-2019 Exhibit A, and modified AIA A232-2019 contract documents.
Key changes outlined in Addendum No. 02 include revisions to Bid Category 01B (Commissioning), which adds building envelope and lighting controls commissioning requirements while clarifying that bid security and bonds are not required; Bid Category 03A (Concrete Allowances), which revises the allowance to $15,000 to be directed by Clark Construction Company; Bid Category 09B (Carpet, Resilient Flooring & Hard Tile), which renames Alternate PT01-A4 to Alternate PT01-A5; Bid Category 26A (Electrical, Low Voltage & Fire Alarm), which removes responsibility matrix references from technology systems coordination; and Bid Category 31A (Site Work & Site Utilities), which corrects page footer editorial changes with no scope modifications. Thirteen bid categories remain unchanged. Pre-bid Requests for Information (RFI #006 through #016) are recorded and provided, with RFI #001 through #005 previously included in Addendum #01.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Whitehall District Schools – Phase 1 Projects
Bid Release No. 01
Addendum No. 02
Date of Issue November 6, 2026
Issued By Clark Construction Company
Contact Tom Brennan, Project Manager (tbrennan@clarkcc.com)
Projects Whitehall Middle School, Ealy Elementary and Shoreline Elementary
General
Addendum No. 02 forms part of the Bidding Documents and consists of this narrative, the revised Bid
Category Descriptions (Section 002416, Scope of Work – Bid Category Specific Notes) identified as
"Addendum 02" in the header, the Addendum 02 documents issued by Pure Architects, and the other documents provided for reference. Where Addendum No. 02 conflicts with previously issued Bidding
Documents, Addendum No. 02 governs.
Bidders shall review all Addendum No. 02 documents, including the Pure Architects Addendum 02 documents and other reference documents, and shall include their cost effect in their bid and acknowledge receipt of Addendum No. 02 with their bid submission. Item numbers below refer to the revised Bid
Category Descriptions. Where items were added or deleted, subsequent items within the same list have been renumbered; renumbering and pagination changes alone are not listed.
Date Changes:
• Bid due date and time revised to Friday, November 13, 2026, at 10:00 AM (ET)
Notes:
• Bidders are advised that this Project is being delivered using the Construction Manager as
Adviser method, with trade contracts held directly by Whitehall District Schools. Contracts will utilize a modified AIA A132-2019, A132-2019 Exhibit A, Insurance and Bonds, and modified
AIA A232-2019. The modified contract documents are currently being finalized and are anticipated to be issued with the final Addendum early next week.
Documents Provided
01. A/E Provided Documents:
a. Addendum No. 02 dated 11/06/2026 from Pure Architects, including:
i. Whitehall Middle School revised drawings: G002, D101B, S101B, A120, A421, I001
ii. Ealy Elementary revised drawings: G002, D101C, A201
02. Section 002416 Bid Category Specific Notes (Revised per Addendum 02)
a. Reference Summary of Changes and Changes by Bid Category below for additional information.
03. Section 012300 Alternates (Revised per Addendum 02) – Added:
a. Whitehall Middle School Alternate PT01-A4 renamed to PT01-A5
b. Supporting documents for Clark Alternate 01 and 02 previously included in Addendum
#01
04. Pre-bid RFI’s recorded to date (RFI #006 through #016)
a. Pre-bid RFI’s #001 through #005 previously included in Addendum #01
Summary of Changes
Bid Category Summary of Change
01B – Commissioning Base specifications revised; building envelope and lighting controls commissioning added; lighting controls removed from exclusions; bid security and bonds clarified as not required.
03A – Concrete Allowance revised to a $15,000 allowance to be utilized at the direction of Clark Construction Company.
09B – Carpet, Resilient Flooring
& Hard Tile
Alternate PT01-A4 renamed to Alternate PT01-A5
26A – Electrical, Low Voltage &
Fire Alarm
References to the responsibility matrix deleted from technology systems coordination.
31A – Site Work & Site Utilities Page footers corrected; no change to scope.
Changes by Bid Category
Bid Category 01B – Commissioning
Base Specification
• Delete Section 002413, Scope of Work General Notes.
• Add Division 00, Procurement and Contracting Requirements, and Division 01, General
Requirements. Section 230800, Commissioning of HVAC Systems, remains.
Include
• Item 19 – Added: “Provide all required building envelope and lighting controls commissioning for applicable areas of construction in accordance with the referenced Energy Code standards.”
Exclude
• Item 4 – Revised. “Lighting-control” is deleted from the list of excluded systems. Revised to read: “Commissioning of plumbing, fire-protection, fire-alarm, electrical power-distribution, emergency-power, communications, security, and other electrical or low-voltage systems, except for interfaces specifically required to functionally test commissioned HVAC equipment and systems.”
• Item 5 – Added: “Bid security, performance bond, and payment bond are not required for Bid
Category 01B.”
Bid Category 03A – Concrete
Allowances
• Allowance 1 – Revised to read: “Provide an allowance of $15,000 to be utilized at the direction of
Clark Construction Company.” The allowance was previously limited to replacement of concrete sidewalks damaged as a result of construction operations.
Bid Category 09B – Carpet, Resilient Flooring & Hard Tile
Alternates
• Alternate PT01-A4 renamed to Alternate PT01-A5. No changes to alternate description.
Bid Category 26A – Electrical, Low Voltage & Fire Alarm
Include
• Item 48 – Revised to read: “Coordinate all data, telecommunications, security, camera, PA/intercom, AV, classroom technology, room technology, and other technology systems indicated on the drawings. Furnish/install only the components assigned to this bid category by the Contract Documents.” References to the applicable responsibility matrix are deleted.
Bid Category 31A – Site Work & Site Utilities
Editorial
• Page footers are corrected to read “Bid Category 31A – Site Work & Site Utilities” (previously
“Bid Category 01A – Site Work & Site Utilities”). There is no change to scope.
Bid Categories Not Changed
No changes were made to the following Bid Categories: 01A – Final Cleaning; 02A – Selective
Demolition; 04A – Masonry; 05A – Structural & Miscellaneous Steel; 06A – Rough & Finish Carpentry
& General Trades; 07A – Roofing; 08A – Entrances & Storefronts, Windows, Glass & Glazing; 09A –
Metal Studs, Gypboard, Acoustical Ceilings & EIFS; 09B – Carpet, Resilient Flooring & Hard Tile; 09C
– Painting & Wall Covering; 11A – Food Service Equipment; 23A – HVAC & Plumbing (Whitehall
Middle School); 23B – HVAC & Plumbing (Ealy Elementary); and 32A – Landscaping
End of Addendum No. 02
| General |
| Date Changes: |
| Notes: |
| Documents Provided |
| Summary of Changes |
| Changes by Bid Category |
| Bid Category 01B – Commissioning |
| Base Specification |
| Include |
| Exclude |
| Bid Category 03A – Concrete |
| Allowances |
| Bid Category 09B – Carpet, Resilient Flooring & Hard Tile |
| Alternates |
| Bid Category 26A – Electrical, Low Voltage & Fire Alarm |
| Include |
| Bid Category 31A – Site Work & Site Utilities |
| Editorial |
Bid Categories Not Changed