This document is an Addendum 01 to the Pre-Bid Requests for Information (RFIs) for the WDS Bond Proposal Phase 1 project in Michigan, which encompasses construction at Ealy Middle School and Shoreline locations. The addendum addresses clarifications and responses to inquiries submitted by bidders during the pre-bid phase, providing additional project information and specifications necessary for bid preparation. The document serves to amend and clarify the original bidding documents and project requirements, ensuring all potential bidders have access to consistent and complete information prior to proposal submission.
The addendum contains responses to specific RFIs submitted by contractors, addressing technical questions, design clarifications, and construction specifications relevant to the bond proposal phase. This document is essential for bidders to accurately prepare their proposals and cost estimates, as it resolves ambiguities or gaps in the original project documentation and ensures a level playing field among all bidding parties.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information
Detailed with Comments
Whitehall District Schools 2025 Bond (25-2983) 541 E. Slocum Street
Whitehall, MI 49461
0001 - Pre-Bid - Mechanical Product Acceptable Manufacturer Request
Subject Pre-Bid - Mechanical Product Acceptable Manufacturer Request
Status Closed by Clark n
Discipline
Mechanical
Location
Multiple
Phase
Preconstruction
Created on
10/28/2026
Due date
11/4/2026
Date resolved
11/3/2026
Author
Wyatt Foerch
Clark Construction Company
Resolved by
Tom Brennan
Clark Construction Company
QUESTION Wyatt Foerch on 10/28/2026 10:37 AM
See email chain attached.
A request has been made to add Grundfos to the list of acceptable manufacturers for certain mechanical products.
The attached email chain includes the full request along with engineer approval.
Submission is for record.
ANSWER Tom Brennan on 11/3/2026 10:05 AM
Per email response from Millies Engineering Group on 10/27/26, Grundfos is an acceptable manufacturer for certain mechanical equipment. This will be clarified further in a forthcoming addendum.
Page 1 of 5Printed on: 11/3/2026ProjectSight
Whitehall District Schools 2025 Bond (25-2983) 541 E. Slocum Street
Whitehall, MI 49461
0002 - Pre-Bid - Project Specifications Formatting Issues
Subject Pre-Bid - Project Specifications Formatting Issues
Status Closed by Architect n
Discipline
All Disciplines
Location
Multiple
Phase
Preconstruction
Created on
10/28/2026
Due date
11/4/2026
Date resolved
Author
Wyatt Foerch
Clark Construction Company
Resolved by
QUESTION Wyatt Foerch on 10/28/2026 12:40 PM
Please refer to attachments for examples.
Throughout the specifications, there are some formatting issues. Quite a few items are in a different text color or have unnecessary bolding and/or parentheses. Please re-evaluate the specs and finish them so the formatting maintains consistency and clarity.
We are requesting this by Tuesday, November 3rd.
COMMENT Nate Gilman on 10/29/2026 08:17 AM
This will be addressed in the next addendum
ASSIGNMENTS
Nate Gilman (Pure Architects) Due on 11/4/2026
Nick Wallis (Pure Architects) Due on 11/4/2026
Quint Rauch (Pure Architects) Due on 11/4/2026
Page 2 of 5Printed on: 11/3/2026ProjectSight
0003 - Pre-Bid - LEED/Sustainability Requirements
Subject Pre-Bid - LEED/Sustainability Requirements
Status Closed by Architect n
Discipline
All Disciplines
Location
Multiple
Phase
Preconstruction
Created on
10/30/2026
Due date
11/6/2026
Date resolved
Author
Wyatt Foerch
Clark Construction Company
Resolved by
QUESTION Wyatt Foerch on 10/30/2026 11:55 AM
Regarding LEED and sustainability requirements outlined in the specifications, many of the items would affect the bids/budget and may not have been discussed or accounted for. Please determine what items may pose a burden to the bids and were not discussed with WDS. Are and of these items necessary or can they be removed?
Please advise and remove accordingly.
COMMENT Nate Gilman on 10/30/2026 01:48 PM
Per the email on 10/29, this criteria is not required and can be removed from the project/specifications. This is be addressed in Add 01.
ASSIGNMENTS
Gregory Richardson (Pure Architects) Due on 11/6/2026
Nate Gilman (Pure Architects) Due on 11/6/2026
Nick Wallis (Pure Architects) Due on 11/6/2026
Quint Rauch (Pure Architects) Due on 11/6/2026
Page 3 of 5Printed on: 11/3/2026ProjectSight
0004 - Pre-Bid - Energy Code Clarification
Subject Pre-Bid - Energy Code Clarification
Status Closed by Architect n
Discipline
All Disciplines
Location
Middle School
Phase
Preconstruction
Created on
10/30/2026
Due date
11/6/2026
Date resolved
Author
Wyatt Foerch
Clark Construction Company
Resolved by
QUESTION Wyatt Foerch on 10/30/2026 12:04 PM
Sheet G101 for Whitehall Middle School references the 2015 Michigan Energy Code and ASHRAE 90.1-2013. With
ASHRAE 90.1 - 2019 becoming effective in April of 2025, please clarify the following:
1. Confirm the applicable Michigan Energy Code and edition of ASHRAE 90.1 governing the project, including whether
ASHRAE 90.1-2019 applies.
2. If ASHRAE 90.1-2019 applies, confirm whether third-party building envelope commissioning is required, including submittal review and field inspections of applicable envelope systems.
3. Confirm whether third-party MEP design review is required under the applicable energy code.
COMMENT Nate Gilman on 10/30/2026 03:33 PM
1. Correct, MEC 2021 and ASHRAE 2019 are the effective versions. This will be updated on G101 for Add01
2. The "Energy Standards" paragraph is still accurate as there was no change in this area between effective years.
There may be a couple areas that fall under the exception, however this would need to be discussed with the building official/inspector. Yes, verification is required for only new fenestration, walls, doors, etc. per chapter 5.
3. Yes, verification is required for new systems, and their integration with existing (where appliable).
ASSIGNMENTS
Gregory Richardson (Pure Architects) Due on 11/6/2026
Nate Gilman (Pure Architects) Due on 11/6/2026
Nick Wallis (Pure Architects) Due on 11/6/2026
Page 4 of 5Printed on: 11/3/2026ProjectSight
0005 - Pre-Bid - Geofoam Requirements
Subject Pre-Bid - Geofoam Requirements
Status Closed by Architect n
Discipline
Structural
Location
Multiple
Phase
Preconstruction
Created on
10/30/2026
Due date
11/6/2026
Date resolved
Author
Wyatt Foerch
Clark Construction Company
Resolved by
QUESTION Wyatt Foerch on 10/30/2026 01:35 PM
The geofoam requirements in Foundation Plan Note 5 on Drawing S201 do not appear to correspond with an available product. Specifically, no extruded polystyrene geofoam has been identified that documents a compressive strength of
100 psi at no more than 5% deflection.
Please provide an acceptable basis-of-design product, a list of approved manufacturers and products, or revised performance criteria that can be used for bidding and submittal review.
COMMENT Nate Gilman on 11/2/2026 12:29 PM
Refer to the attached response from JDH.
ASSIGNMENTS
Gregory Richardson (Pure Architects) Due on 11/6/2026
Nate Gilman (Pure Architects) Due on 11/6/2026
Nick Wallis (Pure Architects) Due on 11/6/2026
Page 5 of 5Printed on: 11/3/2026ProjectSight
Request for Information
Detailed with Comments
Whitehall District Schools 2025 Bond (25-2983) 541 E. Slocum Street
Whitehall, MI 49461
0005 - Pre-Bid - Geofoam Requirements
Subject Pre-Bid - Geofoam Requirements
Status Submitted for Review n
Discipline
Structural
LocationPhase
Preconstruction
Created on
10/30/2026
Due date
11/6/2026
Date resolved
Author
Wyatt Foerch
Clark Construction Company
Resolved by
QUESTION Wyatt Foerch on 10/30/2026 01:35 PM
The geofoam requirements in Foundation Plan Note 5 on Drawing S201 do not appear to correspond with an available product. Specifically, no extruded polystyrene geofoam has been identified that documents a compressive strength of
100 psi at no more than 5% deflection.
Please provide an acceptable basis-of-design product, a list of approved manufacturers and products, or revised performance criteria that can be used for bidding and submittal review.
ASSIGNMENTS
Gregory Richardson (Pure Architects) Due on 11/6/2026
Nate Gilman (Pure Architects) Due on 11/6/2026
Nick Wallis (Pure Architects) Due on 11/6/2026
Quint Rauch (Pure Architects) Due on 11/6/2026
Page 1 of 1Printed on: 10/30/2026ProjectSight roland Text Box Provide expanded polystyrene (EPS) geoform conforming to EPS46 physical property requirements of ASTM D6817.
Roland Bokma (JDH Engr.)
roland Image