This is an interior logistics plan for Whitehall Middle School, a project within the Whitehall District Schools located at 401 SE Elizabeth Street, Whitehall, Michigan 49461. The document, issued September 30, 2026, provides detailed first-floor architectural plans and specifications for interior renovation work across multiple units (Units A through E) within the school facility. The project encompasses work in various spaces including classrooms, cafeteria, kitchen, gymnasium, science labs, media center, administrative offices, and support areas. Key work items include custom millwork installation, new countertops with solid surface materials and supporting brackets, new horizontal unit ventilators, wall louvers, patch and repair of existing walls and floors following MEP (mechanical, plumbing, electrical) demolition, refinishing or replacement of doors and frames, and repair of existing floor cracks. The plan designates certain areas as "not in scope" and requires coordination with mechanical contractors regarding pipe chases, asbestos-containing materials abatement, and temporary construction walls with doors for phased work execution.
The document identifies Bid Category 06A as requiring temporary floor protection and references coordination requirements with multiple trade contractors including mechanical, plumbing, and electrical specialists. The project includes coordination notes for asbestos abatement contractors concerning existing asbestos-containing materials in the ceiling and roofing areas where MEP trades will install hangers and penetrations. Specifications detail material standards such as staining door finishes (WS01) and painting frames (P04) to match building standards, with alternatives provided for aluminum door and frame systems in building standard red. The plan references mechanical drawings, finish plans, structural notes, and site plans for comprehensive project coordination, indicating a complex renovation requiring detailed subcontractor and specialist coordination throughout execution.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18X48
X
18X60 18X48
18X60 18X4818X48
X
18X48
X
X
X
24X42
X
24X48 24X48
24X48 24X48
X
18X3618X36
18X4818X48
18X48
X
36X72 36X72
24x48
CAFETERIA
B104
KITCHEN
B110
BAND
33CHOIR
GYM
AUXILLARY GYM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SMALL GROUP
CLASSROOM
CLASSROOM
BOILER ROOM
TOILETTOILET
CLASSROOM
OFFICE
MDF TOILET TOILET
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE LAB
CLASSROOM
MEDIA CENTER
CLASSROOM
CLASSROOM
01 LARGE GROUP
LEARNING
CENTER
CLASSROOM
OFFICE
CLASSROOM
TOILETSTOILETS
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE LAB
ART ROOM
TEACHERS
LOUNGE
TRAINING
IT
RECEPTION
PRINCIPALOFFICE
OFFICE
OFFICE VESTIBULE
COMMONS
MEN'S LOCKER
WOMEN'S
LOCKER
LOCKER ROOMS
MENS
B101
WOMENS
B102
UNIT B
UNIT C
U N
IT A
U N
IT B
U N
IT
D
U N
IT
C
U N
IT
E
U N
IT
D
U N
IT
E
U N
IT
A
ELEC.
B117
A101
GRAPHICS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SERVING
B105
STORAGE
B116
WALK-IN COOLER
B115
FREEZER
B114
DOCK
B113
STOR.
B108
A LA CARTE
B107
MECH.
B103
CORR
B100
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN SCOPE
7 7 7 7 7
7 7
7 7 7
7 7
7 7
7 7
NEW PAD IN MEZZANINE, SEE MEP
NEW PAD IN MEZZANINE, SEE MEP
TYP
CLASSROOM
METAL PIPE ENCLOSURE FROM CEILING TO
UNIT, BY MECH. CONTRACTOR. PROVIDE
HEAVY GAUGE METAL TO AVOID OIL-
CANNING. INSTALL FOR AN AESTHETICALLY
CLEAN AND ORGANIZED FINISH PRODUCT.
FIELD VERIFY ROUTE, NOTIFY ARCHITECT
OF ROUTING CHALLENGES AS REQUIRED.
A101
A101
MECHANICAL UNIT BELOW, SEE MEP
BENT METAL CHASE ENCLOSURE, SIZE
MTL GAUGE TO AVOID OIL CANNING
2-1/2" CFMF
MEP PIPING FOR NEW UNIT, MOUNT
TIGHT TOGETHER AS CODE ALLOWS
/2
EXIST. WALL, FIELD VERIFY
CONSTRUCTION
COORD. W/ MEP
1' - 7" +/-
F .V
. C E
IL
IN
G H
E
IG
H T
EXIST. CEILING
EXIST. WINDOW
NEW MECH. UNIT
EXPOSED PIPING ABOVE CEILING
A101
EXIST. WALL BASE
NEW PIPE CHASE,
SEE DETAIL
SHEET NUMBER
SHEET NAME
REVISIONS
ISSUE DATE
©2026
SHEET SIZE
30 x 42
W D
S M id d le S ch o o l
W h it eh al l D is tr ic t
S ch o o ls
S E li za b e th S t, W h it e h a ll
, M I
PROJECT NO. 25 146
A101
OVERALL FIRST FLOOR
PLAN
9.30.2026
NR
TH 3/64" = 1'-0"
OVERALL FIRST FLOOR PLAN
FLOOR PLAN KEYED NOTES
1 CUSTOM MILLWORK, SEE INTERIOR FINISH PLANS FOR
DETAIL
2 BUILT-IN SHELVING TO REMAIN, NO SCOPE
3 COUNTERTOP, NEW SOLID SURFACE AND SUPPORTING
BRACKETS EVERY 36" O.C. AT AREAS WHERE
COUNTERTOP IS OPEN UNDERNEATH. CONTRACTOR
WILL BE RESPONSIBLE FOR PROVIDING BRACKETS
APPROPRIATELY SIZED BASED ON DEPTH OF COUNTER.
4 NEW HORIZONTAL UNIT VENTILATOR. COORDINATE
WITH MECHANICAL DRAWINGS.
5 NEW WALL LOUVER IN EXISTING OPENING.
COORDINATE WITH MECHANICAL DRAWINGS.
6 PATCH AND REPAIR EXISTING WALL WHERE PLUMB,
MECH, AND ELEC. HAS BEEN REMOVED. PREP FOR NEW
FINISH, COORDINATE W/ FINISH PLANS
7 PATCH AND REPAIR EXISTING FLOOR WHERE DEMO
OCCURED. PREP FOR NEW FINISH, COORDINATE W/
FINISH PLANS
8 ALT REFINISH EXISTING DOOR/ FRAME TO REMAIN,
DOOR TO BE STAINED WS01, FRAME TO BE PAINTED P04.
SEE FINISH PLANS AND SCHEDULE
9 ALT: REMOVE AND PROVIDE NEW ALUMINUM DOOR
AND FRAME SYSTEM TO MATCH BUILDING STANDARD
RED. PROVIDE NEW HARDWARE.
10 REPAIR EXISTING CRACK IN FLOORING, FIELD VERIFY
LOCATIONS - SEE STRUCT.
NO
TE
1/4" = 1'-0"1 TYPICAL CLASSROOM
UNIT A
UNIT B
UNIT C
UNIT D
UNIT E
KEY PLAN
N.T.S.
1 1/2" = 1'-0"3 TYP. PIPE CHASE DETAIL
1/4" = 1'-0"2 TYP. PIPE CHASE ELEVATION
SYM DATE ISSUED FOR
TomBrennan Polygon
TomBrennan Polygon
TomBrennan Line
TomBrennan Architect
PROPOSED LOCATION OF TEMPORARY CONSTRUCTION WALL WITH DOOR
TomBrennan Text Box AREA OF ASBESTOS CONTAINING MATERIALS AT EXISTING CEILING ABOVE NEWER ACOUSTIC CEILING. MEP TRADES TO COORDINATE WITH ASBESTOS ABATEMENT CONTRACTOR FOR LOCATIONS OF HANGERS, PENETRATIONS, ETC.
TomBrennan Text Box AREA OF ASBESTOS CONTAINING MATERIALS AT EXISTING ROOFING. MEP TRADES TO COORDINATE WITH ASBESTOS ABATEMENT CONTRACTOR FOR LOCATIONS OF HANGERS, PENETRATIONS, ETC.
18X48
X
18X60 18X48
18X60 18X4818X48
X
18X48
X
X
X
24X42
X
24X48 24X48
24X48 24X48
X
18X3618X36
18X4818X48
18X48
X
36X72 36X72
24x48
A301
A301
A301
A301
VESTIBULE
288 SF
BAND
STORAGE
CHOIR
CORRIDOR
SERVING
B105
WALK-IN COOLER
B115
OFFICE
B111
ELEC.
B117
STORAGE
B116
A LA CARTE
B107
KITCHEN
B110
CAFETERIA
B104
CORR
B100
MENS
B101
WOMENS
B102
CORRIDOR
UNIT B
UNIT C
U N
IT A
U N
IT B
A
A301
A301
M8
M8
M8
M8
M4
M4
M8
RECEIVING
B112
FREEZER
B114
25' - 0"
S6A
A601 5
B
B
B104D
B104C
B105B
M8
1"
W
E X
IS
T
. B R
IC
K
C O
U R
S
IN
G
C O
O R
D
16' - 4" 21' - 1 5/8"
INFILL EXISTING OPENING W/
MATCHING MATERIAL FLUSH
TO ADJACENT WALL.
A122
A121
DISH WASHING
B106
STOR.
B108
S3G
COMMONS
VESTIBULE
B104AB104B
B105A
B105D
B105E
B109
B108
B106B
B105F
S6A S6A
S6A
S6A
S6A
TYP ALL
SIDES
DN
A121 3
A121 2
A122
A122
A1224
CASEMENT WINDOW
PANEL, SEE FRAME
ELEVATIONS
B112
NEW HM CASED
OPENING
S3G
A601
A601
A601
MECH.
B103
A D
A
CR
ADA
(MULLION
MOUNTED)
ADA
(MULLION
MOUNTED)
TLT
B109
EXIST. STAIR
TO REMAIN
A601
A601
NOT IN
SCOPE
A421
A421
A411
A421
B117 7 A411
B111
8 8
6 6 6 6 6 6 6
6 6 6 6 6 6
B100-ALT
B116A-ALT
B116B-ALT
B112A-ALT
B112C-ALTB112B-ALT
B103-ALT
A421
TYP
B117D
I101
1 1 1
A421
14 TYP
SOUTH
COLS.
A421
NEW SITE CONCRETE, SEE SITE PLANS
NEW GRADE INFILL, SEE SITE PLANS
10 NEW PAD, SEE MEP
A301
MECH.
B103
GEOFOAM INFILL,
SEE STRUCT.
M8
TYP.
93' - 4"
SHEET NUMBER
SHEET NAME
REVISIONS
ISSUE DATE
©2026
SHEET SIZE
30 x 42
W D
S M id d le S ch o o l
W h it eh al l D is tr ic t
S ch o o ls
S E li za b e th S t, W h it e h a ll
, M I
PROJECT NO. 25 146
A101B
FIRST FLOOR PLAN -
UNIT B
9.30.2026
NR
TH 1/8" = 1'-0"
FIRST FLOOR PLAN - UNIT B
UNIT B
KEY PLAN
N.T.S.
FLOOR PLAN KEYED NOTES
1 CUSTOM MILLWORK, SEE INTERIOR FINISH PLANS FOR
DETAIL
2 BUILT-IN SHELVING TO REMAIN, NO SCOPE
3 COUNTERTOP, NEW SOLID SURFACE AND SUPPORTING
BRACKETS EVERY 36" O.C. AT AREAS WHERE
COUNTERTOP IS OPEN UNDERNEATH. CONTRACTOR
WILL BE RESPONSIBLE FOR PROVIDING BRACKETS
APPROPRIATELY SIZED BASED ON DEPTH OF COUNTER.
4 NEW HORIZONTAL UNIT VENTILATOR. COORDINATE
WITH MECHANICAL DRAWINGS.
5 NEW WALL LOUVER IN EXISTING OPENING.
COORDINATE WITH MECHANICAL DRAWINGS.
6 PATCH AND REPAIR EXISTING WALL WHERE PLUMB,
MECH, AND ELEC. HAS BEEN REMOVED. PREP FOR NEW
FINISH, COORDINATE W/ FINISH PLANS
7 PATCH AND REPAIR EXISTING FLOOR WHERE DEMO
OCCURED. PREP FOR NEW FINISH, COORDINATE W/
FINISH PLANS
8 ALT REFINISH EXISTING DOOR/ FRAME TO REMAIN,
DOOR TO BE STAINED WS01, FRAME TO BE PAINTED P04.
SEE FINISH PLANS AND SCHEDULE
9 ALT: REMOVE AND PROVIDE NEW ALUMINUM DOOR
AND FRAME SYSTEM TO MATCH BUILDING STANDARD
RED. PROVIDE NEW HARDWARE.
10 REPAIR EXISTING CRACK IN FLOORING, FIELD VERIFY
LOCATIONS - SEE STRUCT.
NO
TE
NR
TH 1/8" = 1'-0"
MECH. FLOOR PLAN
SYM DATE ISSUED FOR
TomBrennan Architect
PROPOSED LOCATION OF TEMPORARY CONSTRUCTION WALL WITH DOOR
TomBrennan Line
TomBrennan Polygon
TomBrennan Architect
BID CATEGORY 06A - INCLUDE TEMPORARY FLOOR PROTECTION