Wage Determination 5.18.26.pdf

PDF 3 MB Posted

Attached to
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
Solicitation number
36C24426R0139
Issued by

About this file

This is a federal prevailing wage determination document (General Decision PA20260001) issued by the U.S. Department of Labor for construction projects in Allegheny County, Pennsylvania. The determination establishes hourly wage rates and fringe benefits for various construction worker classifications effective from the modification dates listed, with the most recent modification published on 05/18/2026.

The document specifies prevailing wage rates for approximately 40 construction classifications including asbestos workers, boilermakers, bricklayers, carpenters, electricians, ironworkers, laborers, landscapers, painters, plumbers, roofers, sheet metal workers, truck drivers, welders, and equipment operators. Rates range from $22.37 to $61.07 per hour with corresponding fringe benefit percentages ranging from 17.60% to 38.44%. The classifications include detailed descriptions of work scope for complex categories such as power equipment operators and line construction workers, with specified premium pay for hazardous material handling and equipment operation above certain tonnage thresholds. The document also includes detailed explanations of rate identifiers (union rates, union average rates, survey rates, and state-adopted rates), an appeals process for wage determination challenges with contact information for the Department of Labor's Wage and Hour Division and Administrative Review Board, and notes regarding Executive Order 13706 on paid sick leave and Executive Order 13658 on minimum wage requirements for federal contractors. Unlisted classifications may be added after award through labor standards contract clauses per 29 CFR 5.5(a)(1)(iii).

View the file

Other files

File Type Posted
36C24426R0139 0006.pdf PDF
36C24426R0139 0005.pdf PDF
20260901 Amendment 2.pdf PDF
Amendment - Third floor Overview plan.pdf PDF
36C24426R0139 0004 9.3.26.pdf PDF
Arc Flash Study Single Lines UD 2023.pdf PDF
646-101.AE.20260728 - AE-410 - ENLARGED EQUIPMENT LAYOUT PLAN-LOGISTICS.pdf PDF
36C24426R0139 0003 8.24.26.pdf PDF
646-101.AE.20260728 - GI-107 - ENLARGED PHASING PLANS AREA 1.3-PHASE 1.pdf PDF
646-101.AE.20260728 - GI-106 - ENLARGED PHASING PLANS AREA 1.2-PHASE 1.pdf PDF
Site Visit Signin 8.16.26.jpg JPG image
646-101.MEP.20260728 - GI-000 - COVER SHEET.pdf PDF
36C24426R0139 0002.pdf PDF
Sign In sheet_Pre Bid 072926.pdf PDF
36C24426R0139 0001.docx DOCX document
36C24426R0139_2.pdf PDF
EXHIBIT D - Past Perfomance Questionnaire.docx DOCX document
SSJ Johnson Controls International 36C24426R0139_Redacted.pdf PDF
EXHIBIT C - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
00-Specifications.pdf PDF
SSJ Avigilon Cameras 36C24426R0139 UD SPS AHU RO_signed_Redacted.pdf PDF
EXHIBIT A - Statement of Prior Experience.docx DOCX document
646-21-101_UD SPS AHU RO Upgrade_20260622.pdf PDF
SSJ Chicago Faucets_Watt LFUSG-signed_Redacted.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .