SSJ Chicago Faucets_Watt LFUSG-signed_Redacted.pdf

PDF 155 KB Posted

Attached to
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
Solicitation number
36C24426R0139
Issued by

About this file

This is a Justification and Approval (J&A) document for an acquisition exempted from full and open competition (sole source procurement).

The Department of Veterans Affairs, VISN 04, VA Pittsburgh Healthcare System (VAPHS) seeks to acquire proprietary Chicago Gooseneck Faucets with wristblade handles featuring 1.5 GPM laminar flow control and Watts LFUSG-CS thermostatic mixing valves with Cross Sense Technology. The faucets are specified with the following key attributes: 5-1/4" rigid/swing gooseneck spout, vandal-proof 4" wristblade handle pairs, ceramic 1/4-turn operating cartridges (right and left-hand), 3/8" compression connections, rated operating pressure of 20-125 PSI, and rated operating temperature of 40-140°F. The thermostatic mixing valve allows temperature control to prevent scalding while maintaining 140-degree boiler temperatures to mitigate bacterial growth such as legionella. VAPHS has standardized on these products across both the University Drive and Heinz campuses to reduce maintenance costs, minimize inventory, decrease installation time, and decrease callback frequency. The acquisition is authorized under 10 U.S.C. 2304(c)(1) and FAR 6.302-1(c) based on the determination that only one responsible source—Chicago Faucets—can satisfy agency requirements. The contracting officer determined the anticipated cost will be fair and reasonable because this item is being sole sourced under a larger construction project that will be competed as full and open competition, thereby providing competition at the base contract level. No market research was conducted, and no other sources expressed written interest in the acquisition. The requirement was certified as a bona fide need by Bunny Adair, Healthcare Engineer, and approved by Elijah McIntosh, Contracting Officer, on June 25, 2026.

View the file

Other files

File Type Posted
36C24426R0139 0006.pdf PDF
36C24426R0139 0005.pdf PDF
Amendment - Third floor Overview plan.pdf PDF
36C24426R0139 0004 9.3.26.pdf PDF
Arc Flash Study Single Lines UD 2023.pdf PDF
20260901 Amendment 2.pdf PDF
646-101.AE.20260728 - GI-107 - ENLARGED PHASING PLANS AREA 1.3-PHASE 1.pdf PDF
646-101.AE.20260728 - GI-106 - ENLARGED PHASING PLANS AREA 1.2-PHASE 1.pdf PDF
Site Visit Signin 8.16.26.jpg JPG image
646-101.MEP.20260728 - GI-000 - COVER SHEET.pdf PDF
646-101.AE.20260728 - AE-410 - ENLARGED EQUIPMENT LAYOUT PLAN-LOGISTICS.pdf PDF
36C24426R0139 0003 8.24.26.pdf PDF
36C24426R0139 0002.pdf PDF
Sign In sheet_Pre Bid 072926.pdf PDF
36C24426R0139 0001.docx DOCX document
00-Specifications.pdf PDF
SSJ Avigilon Cameras 36C24426R0139 UD SPS AHU RO_signed_Redacted.pdf PDF
EXHIBIT A - Statement of Prior Experience.docx DOCX document
Wage Determination 5.18.26.pdf PDF
646-21-101_UD SPS AHU RO Upgrade_20260622.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form.docx DOCX document
36C24426R0139_2.pdf PDF
EXHIBIT D - Past Perfomance Questionnaire.docx DOCX document
SSJ Johnson Controls International 36C24426R0139_Redacted.pdf PDF
EXHIBIT C - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (>SAT)

Acquisition Plan Action ID: 36C244-26-AP-3238

1. Contracting Activity:

a. Department of Veterans Affairs, VISN 04, VAPHS, University Drive Campus, Pittsburgh, PA

15215

2. Nature and/or Description of the Action Being Processed: Acquistition of proprietary Chicago Gooseneck Faucets with wristblade handles and 1.5 GPM laminar flow control and Watts LFUSG-CS thermostatic mixing valve. Chicago Gooseneck Faucets with wristblade handles and 1.5 GPM laminar flow control are the standard application throughout VAPHS due to conscious effort to standardize the finishes throughout the restroom, laboratory and clinical areas to make them more resistant to infectious pathogens and easier for the limited custodial staff to maintain. That translates to less time spent on installation, less inventory and fewer callbacks for maintenance. As well Watts LFUSG-CS thermostatic mixing valve with Cross Sense Technology allows for temperature control providing safety to patients and staff from scolding water; while simutanlously allows the boilers to maintain 140 degrees to help kill potentially bacteria such as legionella in the water. This Sole Source Product is for Chicago Gooseneck faucets with wristblade handles and 1.5 GPM laminar flow control and Watts LFUSG-CS thermostatic mixing valve with Cross Sense Technology.

3. : The VAPHS uses Chicago

Gooseneck Faucets with Watts LFUSG-CS thermostatic mixing valve throughout all facilities on both the University Drive and Heinz Campuses. Chicago Gooseneck Faucets with Watts LFUSG-CS thermostatic mixing valve have qualities, as noted below, that are key factors in the standardization.

This allows for quick replacements to be completed by our M&R with no adverse side effects to our patients. The Chicago Gooseneck Faucets with Watts LFUSG-CS thermostatic mixing valve is used across the campuses are designed with the following performance criteria:

a. Specifications

1.5 GPM (5.7 L/min) laminar flow control insert in spout inlet 5-1/4" Rigid/swing gooseneck spout with 1.5 GPM flow control Vandal Proof 4" Wristblade handle (pair) Ceramic 1/4-turn operating cartridge, right-hand Ceramic 1/4-turn operating cartridge, left-hand Complies with the requirements of the Buy American Act of 1933.

Rated Operating Pressure: 20-125 PSI Rated Operating Temperature: 40-140°F Minimum supply pressure 30 psi (207 kPa) Connection type 3/8" compression Hot inlet temperature 120°F 180°F (49°C 82°C) Cold inlet temperature 39°F 80°F (3.8°C 27°C) Minimum inlet temperature differential 5°F (2.8°C) Temperature range 80°F 120°F (27°C 49°C) Maximum pressure 150 psi (10.3 bar)

Minimum flow 0.25 gpm (1.0 l/m) Maximum pressure differential between hot and cold water supplies 20% (Max 20 psi)

4. Statutory Authority Permitting Restricted Competition:

( X ) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements

( ) Unusual and Compelling Urgency ( ) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert

Services ( ) International Agreement ( ) Authorized or Required by Statute ( ) National Security ( ) Public Interest

5. Demonstration that the Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): The acquisition is authorized pursuant to 10 U.S.C. 2304 (c)(1), and is implemented by FAR 6.302-1 (c), Only one responsible source and no other supplies or services will satisfy agency requirements. This authority is applicable due to Chicago Faucets being the only manufacturer able to provide all necessary functions necessary to satisfy Pittsburgh VA Medical Center requirements. Material finishes other than Chicago would require duplication of maintenance cost and materials as well as heightened risk to patients as described below.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: Any action to increase competition for the suppliers of the Chicago Gooseneck Faucets with Watts LFUSG-CS thermostatic mixing valve would cause an undue hardship on the VA Pittsburgh Healthcare System. VAPHS has been making a conscious effort to standardize the finishes throughout the restroom, laboratory and clinical areas to make them more resistant to infectious pathogens and easier for the limited custodial staff to maintain. The installation of material finishes other than Chicago would require duplication of maintenance materials and could expose our veteran patient population to dangerous pathogens unnecessarily.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and

Reasonable: This item is being sole sourced under a larger construction project that will be competed as Full and Open Competition. Therefore, competition will be provided on the base contract which will lead to a fair and reasonable price.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted: Further market research was not conducted based on the same content provided in paragraph 6 above.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: N/A

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: N/A

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: N/A.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona

Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.