646-101.AE.20260728 - GI-107 - ENLARGED PHASING PLANS AREA 1.3-PHASE 1.pdf
PDF 517 KB Posted
- Solicitation number
- 36C24426R0139
About this file
This is an architectural phasing plan and equipment legend for temporary logistics storage installation at the Pittsburgh VAMC University Drive facility. The document specifies equipment requirements, quantities, dimensions, and installation details for three temporary storage areas during Phase 1 of construction.
Temporary Logistics Storage #1 includes 48 high-density 5-tier shelves (2' X 5' X 6'-8"), 4 carts, and 2 workstations (5' X 5'). Temporary Logistics Storage #2 includes 22 high-density 5-tier shelves, 8 four-tier wire shelves (2' X 6'), 4 four-tier wire shelves (2' X 4'), 4 seven-tier baskets (1' X 6' X 2'), 4 carts, 2 workstations, and 2 tugs. Temporary SPS Staging Storage/Office Areas includes 18 case carts (2'-4" X 4'-0"), 7 shelves (4'-0" X 2'-0"), and 20 storage units (2'-6" X 1'-6"). The contractor is responsible for providing top rails at appropriate lengths for both relocated existing equipment and new equipment. Basis of design specifies Metro Shelving High Density Storage or approved equal for high-density shelves, Eagle Group S4-74-2448C for shelves, and Eagle Group S4-74-1830C for storage units. Phase 1 work includes demolition, wall construction, door installation, ceiling modifications, flooring preparation, and equipment installation across designated areas with coordination required with VA personnel.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO.
PHASING PLAN STORAGE EQUIPMENT LEGEND
COUNT DESCRIPTION
EXISTING LOGISTICS STORAGE (FOR REFERENCE)
- 88 5-TIER SHELVES
- 9 4-TIER WIRE SHELVES
- 4 7-TIER BASKETS
- 5 CARTS
ITEM NO. COUNT DESCRIPTION
TEMPORARY LOGISTICS STORAGE #1
TS1M 48 HIGH DENSITY 5-TIER SHELVES
TS2 0 4-TIER WIRE SHELVES
TS3 0 7-TIER BASKETS
TS4 4 CARTS
TS5 2 WORKSTATIONS
ITEM NO. COUNT DESCRIPTION
TS1M 22 HIGH DENSITY 5-TIER SHELVES
TS2 8 4-TIER WIRE SHELVES
SIZE
2' X 5' X 6'-8"
2' X 6'
2' X 2'
SIZE
2' X 5' X 6'-8"
2' X 6'
2' X 2'
5' X 5'
SIZE
2' X 5' X 6'-8"
2' X 6'
TEMPORARY LOGISTICS STORAGE #2
TS6 4 4-TIER WIRE SHELVES
TS7 4 7-TIER BASKETS
2' X 4'
1' X 6' X 2'
TS4 4 CARTS
TS5 2 WORKSTATIONS
5' X 5'
TS8 2 TUG -
TEMPORARY SPS STAGING STORAGE / OFFICE AREAS
ITEM NO. COUNT DESCRIPTION
TS9 18 CASE CARTS
TS10 7 SHELVES
SIZE
2'-4" X 4'-0"
4'-0" X 2'-0"
TS11 20 STORAGE UNITS 2'-6" X 1'-6"
NEW/EXISTING
NEW/EXISTING
NEW/EXISTING
NEW/EXISTING
RELOCATE EXISTING 17
UNITS AND 5 NEW UNITS.
PROVIDE NEW TOP RAILS
FOR ALL
EXISTING - RELOCATED -
PROVIDE NEW TOP RAILS
NEW - VA PROVIDED
EXISTING - RELOCATED -
PROVIDE NEW TOP RAILS
EXISTING - RELOCATED
CONTRACTOR PROVIDED
CONTRACTOR PROVIDED
EXISTING - RELOCATED
EXISTING - REMAPPED
NEW - VA PROVIDED
EXISTING - RELOCATED
NEW - VA PROVIDED
NEW - VA PROVIDED
EXISTING - RELOCATED
EXISTING - RELOCATED
NOTE: CONTRACTOR RESPONSIBLE FOR TOP RAILS AT APPROPIATE LENGTH FOR BOTH RELOCATED AND NEW
EQUIPMENT - CONFIRM EQUIPMENT WITH VA
NOTE: BASIS OF DESIGN FOR ITEM NO. TS1 - MATCH EXISTING MANUFACTURER CURRENTLY USED BY THE VA.
METRO SHELVING HIGH DENSITY STORAGE OR APPROVED EQUAL.
NOTE: BASIS OF DESIGN FOR ITEM NO. TS10 - EAGLE GROUP S4-74-2448C
NOTE: BASIS OF DESIGN FOR ITEM NO. TS11 - EAGLE GROUP S4-74-1830C
NOTE: FOR ITEMS NO. TS1M AND TS1E IN AREA 1- 12 NEW TOP TRACKS, APPROX 19' LONG EACH
NOTE FOR ITEMS NO. TS1M AND TS1E IN AREA 2- 6 NEW TOP TRACKS APPROX. 21' LONG EACH
NOTE: QUANTITIES INCLUSIVE OF TEMPORARY AND END STATE PHASES OF ENTIRE PROJECT
TS1E 12 HIGH DENSITY 5-TIER SHELVES 2' X 5' X 6'-8" EXISTING - RELOCATED -
PROVIDE NEW TOP RAILS
TS1E 6 HIGH DENSITY 5-TIER SHELVES 2' X 5' X 6'-8" RELOCATE EXISTING 6
UNITS. PROVIDE NEW
TOP RAILS FOR ALL
PHASING LEGEND
AREA OF WORK
WALLS TO BE DEMOLISHED
EXISTING STEEL COLUMNS
PHASE UNDER DEMOLITION
EXISTING WALLS TO REMAIN
EXISTING 2-HR FIRE RATING
EXISTING 1-HR FIRE RATING
EXISTING SMOKE BARRIER
NEW PARTITION
1-HR FIRE RATED
2-HR FIRE RATED
NEW SMOKE PARTITION
PRIORITY AREA
8 10 11 12
P
AISLE
4' - 6"
AISLE
4' - 6"
AISLE
4' - 6"
TS4
(5
R O
L L
IN
G
C A
G E
S
F C
C S
T O
R A
G E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
TS1E
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1M
TS1E
P1.8
P1.7
TS5
TS5
TS4TS4TS4
Q
± 14' - 0"
ALIGN1
R .O
" TP1
TP1
± 54' - 8"
P1.6
P1.7
P1.8
P1.9
EXISTING
LOGISTICS
RECEIVING
AE153
EXISTING CORRIDOR
CAA1
TEMPORARY
LOGISTICS
STORAGE #1
TEMPORARY
BREAKOUT
SPACE
8 10 11 12
P
Q
EXISTING GIP OFFICES /
TEMPORARY LOGISTICS
STORAGE #1
TEMPORARY
BREAKOUT
SPACE
P1.17
A L
IG
N
W
IT
H N
E A
R E
S T
E X
IS
T
IN
G
A C
T
ALIGN WITH NEAREST EXISTING ACT
± 14' - 0"
± 54' - 8"
P1.17
P1.17
18 2019 21
S
TS9 TS9TS9
TS9TS9TS9
TS9TS9TS9
TS9TS9TS9
TS9TS9TS9
TS9TS9TS9
EXISTING
OFFICE
AN221
TEMPORARY
SPS OFFICE
AN218
TEMPORARY
SPS OFFICE
AN219
TS10
TS10
TS10
TS10
TS10
TS10
TS10
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TS11
TEMPORARY
STORAGE
AN215
TEMPORARY
STORAGE
AN220
EXISTING PASSAGE
AN217
EXISTING OFFICE
AN222
EXISTING OFFICE
AN223
EXISTING OFFICE
AN225
EXISTING
CORRIDOR
CAN51
EXISTING
TOILET
AN224
P1.15
P1.15
P1.15
P1.15P1.15
P1.0
P1.0
KEY PLAN
NOT TO SCALE
NORTH
TEMPORARY
LOGISTICS
STORAGE #2
TEMPORARY
LOGISTICS
STORAGE #1
TEMPORARY SPS
STAGING STORAGE /
OFFICE AREA
18 2019 21
S
± 11' - 10" ± 12' - 10" ± 17' - 11"
± 16' - 9"
EXISTING PASSAGE
AN217
EXISTING OFFICE
AN222
EXISTING OFFICE
AN223
EXISTING OFFICE
AN225
EXISTING
CORRIDOR
CAN51
EXISTING
TOILET
AN224
EXISTING
INTERIOR DESIGN
OFFICE
AN215
EXISTING
OFFICE
AN221
EXISTING
OFFICE
AN218
EXISTING
OFFICE
AN219
EXISTING
CONFERENCE ROOM
AN220
P1.18
P1.18
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1300 Baxter St.
Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com
SES Project : 22164.001
MOTT MACDONALD
ARCHITECTS PENN, P.C.
325 CHESTNUT STREET,
SUITE 300
PHILADELPHIA, PA 19016 U.S.A.
A u to d e s k D o c s /2
.0
V
A P it ts b u rg S
P S
A H
U a n d
R O
U p g ra d e s /6
-2
-1
U
D S
P S
A H
U
R O
U p g ra d e A rc h it e c tu re R
.r v t
/2
/2
:3
:1
A
M
GI-107
ENLARGED PHASING PLANS AREA
1 & 3 - PHASE 1
UD SPS AHU & RO UPGRADE,
PITTSBURGH VAMC
University Drive C, Pittsburgh, PA 15240
646-21-101
11/07/2025 DH/LAA MS
PHASE 1 KEYNOTES
# COMMENT
P1.0 CHANGE EXISTING DOOR LOCKSETS TO CONSTRUCTION LOCKSETS. COORDINATE
REQUIRED HARDWARE WITH VA.
P1.1 CONFIRM IF EXISTING WALLS EXTEND TO DECK ABOVE. EXTEND WALL TO CREATE
CONSTRUCTION BARRIER IF NEEDED. SEE WALL TYPE TP2 ON SHEET GI-108.
P1.2 EXISTING DOOR TO BE TEMPORARILY CLOSED FOR DURATION OF ALL PHASES.
P1.3 REMOVE EXISTING FURNITURE - CONTRACTOR TO DISCARD FURNITURE
P1.4 REMOVE CUBICLE PARTITIONS AND ASSOCIATED MOUNTING HARDWARE -
CONTRACTOR TO DISCARD CUBICLES
P1.5 REMOVE PORTION OF EXISTING WALL TO ACCOMODATE NEW DOOR OPENING.
P1.6 REPAIR OR MODIFY EXISTING FLOOR FINISHES AS NEEDED TO ACCOMODATE NEW
TEMPORARY SPACES.
P1.7 CONSTRUCT NEW WALL.
P1.8 INSTALL DOOR, FRAME, AND HARDWARE.
P1.9 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.
P1.10 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE IN ITS ENTIRETY.
P1.11 DEMOLISH EXISTING WALLS IN THEIR ENTIRETY.
P1.12 REMOVE PORTION OF EXISTING ACT CEILING PANELS. CUT AT NEAREST EXISTING
TILE GRID. PROVIDE NEW ACT PANELS & MAINTAIN EXISTING CEILING HEIGHT.
P1.13 REMOVE EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM IN THEIR
ENTIRETY - RETAIN LIGHT FIXTURES AND ALL CEILING DEVICES FOR
REINSTALLATION
P1.14 CONTRACTOR TO REROUTE TUG SYSTEM TO TEMP STORAGE AREAS, AS
CONSTRUCTION IS OCCURING AND AS PART OF NEW WORK AS REQUIRED
P1.15 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.
P1.16 EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM, LIGHT FIXTURES, AND
MECHANICAL DEVICES TO REMAIN - SEE MEP DRAWINGS
P1.17 INSTALL NEW ACT SUSPENDED CEILING AND INTEGRATE PATTERN AND GRID INTO
EXISTING - SEE MEP DRAWINGS
P1.18 REMOVE EXISTING CARPET AND PREPARE ROOM TO RECEIVE NEW LVT
FLOORING
SCALE: 3/16" = 1'-0"
1680 4
SCALE: 3/16" = 1'-0"
1680 4
SCALE: 3/16" = 1'-0"
1680 4
3/16" = 1'-0"
PHASE 1 - TEMPORARY LOGISTICS STORAGE #1
3/16" = 1'-0"
PHASE 1 - TEMPORARY LOGISTICS STORAGE #1 RCP
3/16" = 1'-0"
PHASE 1 - TEMPORARY SPS STAGING STORAGE - AREA #3
SCALE: 3/16" = 1'-0"
1680 4
3/16" = 1'-0"
PHASE 1 - TEMPORARY SPS STAGING STORAGE (DEMOLITION) - AREA #3
Revisions: Date:
REVISION 1 - VA COMMENTS 06/15/26
BID SET - AMENDMENT-1 07/28/26
| Sheets |
| AE-410 - ENLARGED EQUIPMENT LAYOUT PLAN (LOGISTICS) |
| GI-106 - ENLARGED PHASING PLANS AREA 1 & 2 - PHASE 1 |
| GI-107 - ENLARGED PHASING PLANS AREA 1 & 3 - PHASE 1 |
File details come from the government source that posted it. Updated .