646-101.AE.20260728 - GI-107 - ENLARGED PHASING PLANS AREA 1.3-PHASE 1.pdf

PDF 517 KB Posted

Attached to
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
Solicitation number
36C24426R0139
Issued by

About this file

This is an architectural phasing plan and equipment legend for temporary logistics storage installation at the Pittsburgh VAMC University Drive facility. The document specifies equipment requirements, quantities, dimensions, and installation details for three temporary storage areas during Phase 1 of construction.

Temporary Logistics Storage #1 includes 48 high-density 5-tier shelves (2' X 5' X 6'-8"), 4 carts, and 2 workstations (5' X 5'). Temporary Logistics Storage #2 includes 22 high-density 5-tier shelves, 8 four-tier wire shelves (2' X 6'), 4 four-tier wire shelves (2' X 4'), 4 seven-tier baskets (1' X 6' X 2'), 4 carts, 2 workstations, and 2 tugs. Temporary SPS Staging Storage/Office Areas includes 18 case carts (2'-4" X 4'-0"), 7 shelves (4'-0" X 2'-0"), and 20 storage units (2'-6" X 1'-6"). The contractor is responsible for providing top rails at appropriate lengths for both relocated existing equipment and new equipment. Basis of design specifies Metro Shelving High Density Storage or approved equal for high-density shelves, Eagle Group S4-74-2448C for shelves, and Eagle Group S4-74-1830C for storage units. Phase 1 work includes demolition, wall construction, door installation, ceiling modifications, flooring preparation, and equipment installation across designated areas with coordination required with VA personnel.

View the file

Other files

File Type Posted
36C24426R0139 0006.pdf PDF
36C24426R0139 0005.pdf PDF
Arc Flash Study Single Lines UD 2023.pdf PDF
36C24426R0139 0004 9.3.26.pdf PDF
20260901 Amendment 2.pdf PDF
Amendment - Third floor Overview plan.pdf PDF
646-101.AE.20260728 - GI-106 - ENLARGED PHASING PLANS AREA 1.2-PHASE 1.pdf PDF
646-101.AE.20260728 - AE-410 - ENLARGED EQUIPMENT LAYOUT PLAN-LOGISTICS.pdf PDF
36C24426R0139 0003 8.24.26.pdf PDF
646-101.MEP.20260728 - GI-000 - COVER SHEET.pdf PDF
Site Visit Signin 8.16.26.jpg JPG image
36C24426R0139 0002.pdf PDF
Sign In sheet_Pre Bid 072926.pdf PDF
36C24426R0139 0001.docx DOCX document
00-Specifications.pdf PDF
646-21-101_UD SPS AHU RO Upgrade_20260622.pdf PDF
EXHIBIT A - Statement of Prior Experience.docx DOCX document
36C24426R0139_2.pdf PDF
SSJ Johnson Controls International 36C24426R0139_Redacted.pdf PDF
EXHIBIT D - Past Perfomance Questionnaire.docx DOCX document
EXHIBIT C - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
SSJ Avigilon Cameras 36C24426R0139 UD SPS AHU RO_signed_Redacted.pdf PDF
EXHIBIT B - Subcontractor Consent and Reference Form.docx DOCX document
SSJ Chicago Faucets_Watt LFUSG-signed_Redacted.pdf PDF
Wage Determination 5.18.26.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO.

PHASING PLAN STORAGE EQUIPMENT LEGEND

COUNT DESCRIPTION

EXISTING LOGISTICS STORAGE (FOR REFERENCE)

- 88 5-TIER SHELVES

- 9 4-TIER WIRE SHELVES

- 4 7-TIER BASKETS

- 5 CARTS

ITEM NO. COUNT DESCRIPTION

TEMPORARY LOGISTICS STORAGE #1

TS1M 48 HIGH DENSITY 5-TIER SHELVES

TS2 0 4-TIER WIRE SHELVES

TS3 0 7-TIER BASKETS

TS4 4 CARTS

TS5 2 WORKSTATIONS

ITEM NO. COUNT DESCRIPTION

TS1M 22 HIGH DENSITY 5-TIER SHELVES

TS2 8 4-TIER WIRE SHELVES

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

5' X 5'

SIZE

2' X 5' X 6'-8"

2' X 6'

TEMPORARY LOGISTICS STORAGE #2

TS6 4 4-TIER WIRE SHELVES

TS7 4 7-TIER BASKETS

2' X 4'

1' X 6' X 2'

TS4 4 CARTS

TS5 2 WORKSTATIONS

5' X 5'

TS8 2 TUG -

TEMPORARY SPS STAGING STORAGE / OFFICE AREAS

ITEM NO. COUNT DESCRIPTION

TS9 18 CASE CARTS

TS10 7 SHELVES

SIZE

2'-4" X 4'-0"

4'-0" X 2'-0"

TS11 20 STORAGE UNITS 2'-6" X 1'-6"

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

RELOCATE EXISTING 17

UNITS AND 5 NEW UNITS.

PROVIDE NEW TOP RAILS

FOR ALL

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

NEW - VA PROVIDED

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

EXISTING - RELOCATED

CONTRACTOR PROVIDED

CONTRACTOR PROVIDED

EXISTING - RELOCATED

EXISTING - REMAPPED

NEW - VA PROVIDED

EXISTING - RELOCATED

NEW - VA PROVIDED

NEW - VA PROVIDED

EXISTING - RELOCATED

EXISTING - RELOCATED

NOTE: CONTRACTOR RESPONSIBLE FOR TOP RAILS AT APPROPIATE LENGTH FOR BOTH RELOCATED AND NEW

EQUIPMENT - CONFIRM EQUIPMENT WITH VA

NOTE: BASIS OF DESIGN FOR ITEM NO. TS1 - MATCH EXISTING MANUFACTURER CURRENTLY USED BY THE VA.

METRO SHELVING HIGH DENSITY STORAGE OR APPROVED EQUAL.

NOTE: BASIS OF DESIGN FOR ITEM NO. TS10 - EAGLE GROUP S4-74-2448C

NOTE: BASIS OF DESIGN FOR ITEM NO. TS11 - EAGLE GROUP S4-74-1830C

NOTE: FOR ITEMS NO. TS1M AND TS1E IN AREA 1- 12 NEW TOP TRACKS, APPROX 19' LONG EACH

NOTE FOR ITEMS NO. TS1M AND TS1E IN AREA 2- 6 NEW TOP TRACKS APPROX. 21' LONG EACH

NOTE: QUANTITIES INCLUSIVE OF TEMPORARY AND END STATE PHASES OF ENTIRE PROJECT

TS1E 12 HIGH DENSITY 5-TIER SHELVES 2' X 5' X 6'-8" EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

TS1E 6 HIGH DENSITY 5-TIER SHELVES 2' X 5' X 6'-8" RELOCATE EXISTING 6

UNITS. PROVIDE NEW

TOP RAILS FOR ALL

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

8 10 11 12

P

AISLE

4' - 6"

AISLE

4' - 6"

AISLE

4' - 6"

TS4

(5

R O

L L

IN

G

C A

G E

S

F C

C S

T O

R A

G E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

TS1E

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1M

TS1E

P1.8

P1.7

TS5

TS5

TS4TS4TS4

Q

± 14' - 0"

ALIGN1

R .O

" TP1

TP1

± 54' - 8"

P1.6

P1.7

P1.8

P1.9

EXISTING

LOGISTICS

RECEIVING

AE153

EXISTING CORRIDOR

CAA1

TEMPORARY

LOGISTICS

STORAGE #1

TEMPORARY

BREAKOUT

SPACE

8 10 11 12

P

Q

EXISTING GIP OFFICES /

TEMPORARY LOGISTICS

STORAGE #1

TEMPORARY

BREAKOUT

SPACE

P1.17

A L

IG

N

W

IT

H N

E A

R E

S T

E X

IS

T

IN

G

A C

T

ALIGN WITH NEAREST EXISTING ACT

± 14' - 0"

± 54' - 8"

P1.17

P1.17

18 2019 21

S

TS9 TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

EXISTING

OFFICE

AN221

TEMPORARY

SPS OFFICE

AN218

TEMPORARY

SPS OFFICE

AN219

TS10

TS10

TS10

TS10

TS10

TS10

TS10

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TEMPORARY

STORAGE

AN215

TEMPORARY

STORAGE

AN220

EXISTING PASSAGE

AN217

EXISTING OFFICE

AN222

EXISTING OFFICE

AN223

EXISTING OFFICE

AN225

EXISTING

CORRIDOR

CAN51

EXISTING

TOILET

AN224

P1.15

P1.15

P1.15

P1.15P1.15

P1.0

P1.0

KEY PLAN

NOT TO SCALE

NORTH

TEMPORARY

LOGISTICS

STORAGE #2

TEMPORARY

LOGISTICS

STORAGE #1

TEMPORARY SPS

STAGING STORAGE /

OFFICE AREA

18 2019 21

S

± 11' - 10" ± 12' - 10" ± 17' - 11"

± 16' - 9"

EXISTING PASSAGE

AN217

EXISTING OFFICE

AN222

EXISTING OFFICE

AN223

EXISTING OFFICE

AN225

EXISTING

CORRIDOR

CAN51

EXISTING

TOILET

AN224

EXISTING

INTERIOR DESIGN

OFFICE

AN215

EXISTING

OFFICE

AN221

EXISTING

OFFICE

AN218

EXISTING

OFFICE

AN219

EXISTING

CONFERENCE ROOM

AN220

P1.18

P1.18

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/2

/2

:3

:1

A

M

GI-107

ENLARGED PHASING PLANS AREA

1 & 3 - PHASE 1

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

PHASE 1 KEYNOTES

# COMMENT

P1.0 CHANGE EXISTING DOOR LOCKSETS TO CONSTRUCTION LOCKSETS. COORDINATE

REQUIRED HARDWARE WITH VA.

P1.1 CONFIRM IF EXISTING WALLS EXTEND TO DECK ABOVE. EXTEND WALL TO CREATE

CONSTRUCTION BARRIER IF NEEDED. SEE WALL TYPE TP2 ON SHEET GI-108.

P1.2 EXISTING DOOR TO BE TEMPORARILY CLOSED FOR DURATION OF ALL PHASES.

P1.3 REMOVE EXISTING FURNITURE - CONTRACTOR TO DISCARD FURNITURE

P1.4 REMOVE CUBICLE PARTITIONS AND ASSOCIATED MOUNTING HARDWARE -

CONTRACTOR TO DISCARD CUBICLES

P1.5 REMOVE PORTION OF EXISTING WALL TO ACCOMODATE NEW DOOR OPENING.

P1.6 REPAIR OR MODIFY EXISTING FLOOR FINISHES AS NEEDED TO ACCOMODATE NEW

TEMPORARY SPACES.

P1.7 CONSTRUCT NEW WALL.

P1.8 INSTALL DOOR, FRAME, AND HARDWARE.

P1.9 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.

P1.10 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE IN ITS ENTIRETY.

P1.11 DEMOLISH EXISTING WALLS IN THEIR ENTIRETY.

P1.12 REMOVE PORTION OF EXISTING ACT CEILING PANELS. CUT AT NEAREST EXISTING

TILE GRID. PROVIDE NEW ACT PANELS & MAINTAIN EXISTING CEILING HEIGHT.

P1.13 REMOVE EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM IN THEIR

ENTIRETY - RETAIN LIGHT FIXTURES AND ALL CEILING DEVICES FOR

REINSTALLATION

P1.14 CONTRACTOR TO REROUTE TUG SYSTEM TO TEMP STORAGE AREAS, AS

CONSTRUCTION IS OCCURING AND AS PART OF NEW WORK AS REQUIRED

P1.15 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.

P1.16 EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM, LIGHT FIXTURES, AND

MECHANICAL DEVICES TO REMAIN - SEE MEP DRAWINGS

P1.17 INSTALL NEW ACT SUSPENDED CEILING AND INTEGRATE PATTERN AND GRID INTO

EXISTING - SEE MEP DRAWINGS

P1.18 REMOVE EXISTING CARPET AND PREPARE ROOM TO RECEIVE NEW LVT

FLOORING

SCALE: 3/16" = 1'-0"

1680 4

SCALE: 3/16" = 1'-0"

1680 4

SCALE: 3/16" = 1'-0"

1680 4

3/16" = 1'-0"

PHASE 1 - TEMPORARY LOGISTICS STORAGE #1

3/16" = 1'-0"

PHASE 1 - TEMPORARY LOGISTICS STORAGE #1 RCP

3/16" = 1'-0"

PHASE 1 - TEMPORARY SPS STAGING STORAGE - AREA #3

SCALE: 3/16" = 1'-0"

1680 4

3/16" = 1'-0"

PHASE 1 - TEMPORARY SPS STAGING STORAGE (DEMOLITION) - AREA #3

Revisions: Date:

REVISION 1 - VA COMMENTS 06/15/26

BID SET - AMENDMENT-1 07/28/26

Sheets
AE-410 - ENLARGED EQUIPMENT LAYOUT PLAN (LOGISTICS)
GI-106 - ENLARGED PHASING PLANS AREA 1 & 2 - PHASE 1
GI-107 - ENLARGED PHASING PLANS AREA 1 & 3 - PHASE 1

File details come from the government source that posted it. Updated .