wa-a2015025_va.pdf

PDF 281 KB Posted

Attached to
WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
Solicitation number
69056721B000010
Issued by

About this file

This document contains a vertical alignment review report for a transportation project and related federal contract opportunity. The vertical alignment review report details two proposed vertical alignments for a project with station elevations, element types including linear segments, symmetrical parabolas, and grade rates. The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration for public access enhancements to the Willapa National Wildlife Refuge, with responses due by the listed solicitation number and date.

View the file

Other files

File Type Posted
Tabulation of Bids Awarded.pdf PDF
Bid Opening Sign-in sheet.pdf PDF
BidSum.pdf PDF
Amendment A002.pdf PDF
Amendment A002.pdf PDF
QA_1-25-22.pdf PDF
QA2_1-21-22.pdf PDF
QA_1-21-22.pdf PDF
QA_1-20-22.pdf PDF
QA_1-14-22.pdf PDF
Amendment A001.pdf PDF
QA_1-13-22.pdf PDF
QA_1-12-22.pdf PDF
Corridor Reports Approach 1.pdf PDF
WA Pacific 2015 (2) IFB.pdf PDF
wa-a2015025_Approach_Overflow_XS.pdf PDF
wa-a2015025_ha.pdf PDF
wa-a2015025_Approach1_XSReport.pdf PDF
xml and dxf files.zip ZIP file
Geotech Report_PBS.pdf PDF
Corridor Reports Overflow.pdf PDF
GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf PDF
wa-a2015025_control_points.xlsx XLSX spreadsheet
final wa-a2015025_PlanSet.pdf PDF
Qunatities by Named Boundaries.pdf PDF
wa-a2015025_Overflow_XSReport.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report

Report Created: Tuesday, July 27, 2021 Time: 5:38:21 PM

Project: Default

Description:

File Name: c:\pw-work\d0460867\wa-a2015025_COR.dgn

Last Revised: 7/27/2021 17:22:05 Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: Approach 1

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: BL5

Vertical Description:

Vertical Style: Alignment\Baseline

Station Elevation

Element: Linear

START 5989.034 64.326

VPC 6017.476 66.601

Tangent Grade: 0.080

Tangent Length: 28.442

Element: Symmetrical Parabola

VPC 6017.476 66.601

VPI 6029.976 67.601

VPT 6042.476 67.976

Length: 25.000

Entrance Grade: 0.080

Exit Grade: 0.030 r = (g2 - g1) / L: -20.000

K = l / (g2 - g1): 5.000

Middle Ordinate: -0.156

Element: Linear

VPT 6042.476 67.976

END 6057.914 68.439

Tangent Grade: 0.030

Tangent Length: 15.438

Vertical Alignment: BLAlt6

Vertical Description:

Vertical Style: Alignment\Baseline - Alt 3

Station Elevation

Page 1 of 2Vertical Alignment Review Report

7/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTfcdykq03.html

Element: Linear

START 5989.034 70.260

VPI 6022.127 70.426

Tangent Grade: 0.005

Tangent Length: 33.093

Element: Linear

VPI 6022.127 70.426

VPI 6089.292 75.799

Tangent Grade: 0.080

Tangent Length: 67.165

Element: Linear

VPI 6089.292 75.799

END 6162.687 78.071

Tangent Grade: 0.031

Tangent Length: 73.395

Page 2 of 2Vertical Alignment Review Report

7/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTfcdykq03.html

File details come from the government source that posted it. Updated .