QA_1-25-22.pdf

PDF 413 KB Posted

Attached to
WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
Solicitation number
69056721B000010
Issued by

About this file

This document contains questions and answers related to federal contract number 69056721B000010 for public access enhancements to the Willapa National Wildlife Refuge Phase II. The questions and answers provide clarification on construction requirements such as concrete testing, placement of spoils, asphalt paving lifts, use of excavated gravel, landscaping, and material pricing escalation. Specification sections and plan sheets are referenced in answering questions about utility trench locations, backhoe work hours, and asphalt repair work. One question will be addressed in amendment A002 regarding the type of geotextile fabric specified.

View the file

Other files

File Type Posted
Tabulation of Bids Awarded.pdf PDF
Bid Opening Sign-in sheet.pdf PDF
BidSum.pdf PDF
Amendment A002.pdf PDF
Amendment A002.pdf PDF
QA2_1-21-22.pdf PDF
QA_1-21-22.pdf PDF
QA_1-20-22.pdf PDF
QA_1-14-22.pdf PDF
Amendment A001.pdf PDF
QA_1-13-22.pdf PDF
QA_1-12-22.pdf PDF
Corridor Reports Approach 1.pdf PDF
WA Pacific 2015 (2) IFB.pdf PDF
wa-a2015025_va.pdf PDF
wa-a2015025_Approach_Overflow_XS.pdf PDF
wa-a2015025_ha.pdf PDF
wa-a2015025_Approach1_XSReport.pdf PDF
xml and dxf files.zip ZIP file
Geotech Report_PBS.pdf PDF
Corridor Reports Overflow.pdf PDF
GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf PDF
wa-a2015025_control_points.xlsx XLSX spreadsheet
final wa-a2015025_PlanSet.pdf PDF
Qunatities by Named Boundaries.pdf PDF
wa-a2015025_Overflow_XSReport.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA pacific 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II

# General Technical Question Answer Date

1 X Please advise where the 120 lineal feet of utility trench reference in bid item A0640 is shown on the plans. See Section F of the plan set. Bid accordingly 1/12/22

2 X

Thank you for the quick response, but this does not answer my question. I will try to clarify below.

I am familiar with Section F of the plan set. To be more specific:

- 2” waterline is shown on plan sheet F.2 and paid under bid item A0340

- 4” sewer line is shown on plan sheet F.2 and paid under bid item A0360

- Cleanout is shown on plan sheet F.2 and paid under bid item A0380 *** the utility trench bid item A0640 of 120lf is not shown on the plans and I am trying to figure out what exactly this is for and where it is on the plans.

Will be address under Amendment A001 1/13/22

3 X I have been getting questions from our concrete subcontractors needing clarification if Alkali-silica reactivity (ASR) testing will be required for the concrete work and/or precast concrete wheel stops?

yes, please bid accordingly 1/14/22

4 X Is it possible to place spoils over the north bank behind the existing buildings show on Sheet F-2? No. See FP-14 Subsection 204.14. 1/20/22

5 X Please provide clarification on the 40 hours of backhoe work?

See Subsection 622.01 of the Special Contract Requirements.

1/20/22

6 X Can one 3 inch lift of asphalt concrete pavement be placed instead of two 1.5 inch lifts of asphalt concrete pavement? No. See Sheets C.1 & C.2 of the plans. 1/20/22

7 X The specs call for paving the 3” of asphalt concrete pavement in two equal lifts. Will we be allowed to pave in 1 - 3" lift? No. See Sheets C.1 & C.2 of the plans. 1/20/22

8 X Can the excavated gravel on the roadway be re-used to build the base layer?

Construct the base layer according to the plans and Section 302.

1/21/22

9 X Any landscaping? See the plans and Section 625. 1/21/22

10 X Is there any asphalt repair near the entrance to the Wildlife Refuse?

See the solicitation documents for the prescribed work.

1/21/22

11 X Question about material pricing escalation – oil. Due to supply chain issues, with this project being 5-ish months out from starting (6/20/22 start date from the bid documents), are there any escalation clauses in the event that pricing for materials increases? For asphalt paving, oil could potentially see a 5% increase.

This solicitation does not contain Adjustments for Price Fluctuations under Subsection 109.06A. Please bid accordingly.

1/21/22

12 X My manufacturer is saying that they do not make Type 1 Class E (woven) Geotextile fabric. Is this incorrect and instead supposed to be NON-woven?

Will be addressed under Amendment A002 1/25/22

Check General or Technical

File details come from the government source that posted it. Updated .