This cross section gradebook report details road construction specifications for a project on Approach 1 of an alignment. It provides elevation and coordinate data for various road features at station intervals along the alignment, including slope stakes, pavement edges, parkways, shoulders, and existing ground elevations.
The related federal contract opportunity is a solicitation to enhance public access to the Willapa National Wildlife Refuge in Washington state during Phase II of the project. The solicitation documents attached to the opportunity describe requirements for road construction and upgrades to be performed by the selected contractor. The solicitation was issued by the Department of Transportation Federal Highway Administration. Responses were due on the date specified. The contract will be awarded based on the terms presented to support completion of the work defined in the solicitation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids Awarded.pdf | ||
| Bid Opening Sign-in sheet.pdf | ||
| BidSum.pdf | ||
| Amendment A002.pdf | ||
| Amendment A002.pdf | ||
| QA_1-25-22.pdf | ||
| QA2_1-21-22.pdf | ||
| QA_1-21-22.pdf | ||
| QA_1-20-22.pdf | ||
| QA_1-14-22.pdf | ||
| Amendment A001.pdf | ||
| QA_1-13-22.pdf | ||
| QA_1-12-22.pdf | ||
| Corridor Reports Approach 1.pdf | ||
| WA Pacific 2015 (2) IFB.pdf | ||
| wa-a2015025_va.pdf | ||
| wa-a2015025_Approach_Overflow_XS.pdf | ||
| wa-a2015025_ha.pdf | ||
| xml and dxf files.zip | ZIP file | |
| Geotech Report_PBS.pdf | ||
| Corridor Reports Overflow.pdf | ||
| GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf | ||
| wa-a2015025_control_points.xlsx | XLSX spreadsheet | |
| final wa-a2015025_PlanSet.pdf | ||
| Qunatities by Named Boundaries.pdf | ||
| wa-a2015025_Overflow_XSReport.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross Section Gradebook with Northing/Easting Report
Report Created: Wednesday, July 28, 2021 Time: 12:37:47 PM
Set Name: Approach 1 XS
Alignment Name: Approach 1 Input Grid Factor: Note: All units in this report are in feet unless specified otherwise.
Surface: Approach1
Station: 6000.000
Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway
Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L
Offset -20.743 -15.473 -14.000 -13.414 -13.414 -12.572
Elevation 63.867 63.648 64.991 64.678 64.678 64.690
Northing 395420.687 395416.873 395415.806 395415.382 395415.382 395414.773
Easting 759019.733 759023.370 759024.386 759024.790 759024.790 759025.371
Existing Ground
63.867 64.014 64.055 64.071 64.071 64.094
Slope
Station: 6025.000
Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway
Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L
Offset -18.793 -13.378 -12.031 -11.372 -11.372 -10.608
Elevation 65.966 65.794 67.092 66.797 66.797 66.798
Northing 395436.526 395432.607 395431.632 395431.155 395431.155 395430.602
Easting 759039.174 759042.910 759043.839 759044.294 759044.294 759044.821
Existing Ground
65.966 66.133 66.122 66.117 66.117 66.111
Slope
Station: 6050.000
Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway
Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L
Offset -26.682 -25.487 -24.258 -23.532 -23.532 -22.839
Elevation 68.014 67.162 68.418 68.140 68.140 68.132
Northing 395459.487 395458.622 395457.732 395457.207 395457.207 395456.705
Easting 759051.824 759052.649 759053.497 759053.998 759053.998 759054.476
Existing Ground
68.014 67.879 67.763 67.695 67.695 67.630
Slope
Station: 6057.914
Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway
Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L
Offset -18.660 -15.194 -14.000 -13.255 -13.255 -12.582
Elevation 67.810 67.343 68.587 68.313 68.313 68.303
Northing 395459.142 395456.633 395455.769 395455.230 395455.230 395454.743
Easting 759063.088 759065.479 759066.304 759066.818 759066.818 759067.282
Existing Ground
67.810 67.484 67.375 67.356 67.356 67.340
Slope
Surface: BL13
Station: 6057.914
Feature Slope_Stake_R
Offset 22.227
Elevation 66.471
Northing 395429.548
Easting 759091.301
Existing Ground
66.471
Slope
Surface: BL14
Station: 6057.914
Feature Back_Top1_L_L
Offset -39.144
Elevation 69.223
Northing 395473.968
Easting 759048.953
Existing Ground
69.312
Slope
Page 1 of 1Cross Section Gradebook with Northing/Easting Report
7/28/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTxxrrc4ff.html
File details come from the government source that posted it. Updated .