wa-a2015025_Approach1_XSReport.pdf

PDF 284 KB Posted

Attached to
WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
Solicitation number
69056721B000010
Issued by

About this file

This cross section gradebook report details road construction specifications for a project on Approach 1 of an alignment. It provides elevation and coordinate data for various road features at station intervals along the alignment, including slope stakes, pavement edges, parkways, shoulders, and existing ground elevations.

The related federal contract opportunity is a solicitation to enhance public access to the Willapa National Wildlife Refuge in Washington state during Phase II of the project. The solicitation documents attached to the opportunity describe requirements for road construction and upgrades to be performed by the selected contractor. The solicitation was issued by the Department of Transportation Federal Highway Administration. Responses were due on the date specified. The contract will be awarded based on the terms presented to support completion of the work defined in the solicitation documents.

View the file

Other files

File Type Posted
Tabulation of Bids Awarded.pdf PDF
Bid Opening Sign-in sheet.pdf PDF
BidSum.pdf PDF
Amendment A002.pdf PDF
Amendment A002.pdf PDF
QA_1-25-22.pdf PDF
QA2_1-21-22.pdf PDF
QA_1-21-22.pdf PDF
QA_1-20-22.pdf PDF
QA_1-14-22.pdf PDF
Amendment A001.pdf PDF
QA_1-13-22.pdf PDF
QA_1-12-22.pdf PDF
Corridor Reports Approach 1.pdf PDF
WA Pacific 2015 (2) IFB.pdf PDF
wa-a2015025_va.pdf PDF
wa-a2015025_Approach_Overflow_XS.pdf PDF
wa-a2015025_ha.pdf PDF
xml and dxf files.zip ZIP file
Geotech Report_PBS.pdf PDF
Corridor Reports Overflow.pdf PDF
GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf PDF
wa-a2015025_control_points.xlsx XLSX spreadsheet
final wa-a2015025_PlanSet.pdf PDF
Qunatities by Named Boundaries.pdf PDF
wa-a2015025_Overflow_XSReport.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cross Section Gradebook with Northing/Easting Report

Report Created: Wednesday, July 28, 2021 Time: 12:37:47 PM

Set Name: Approach 1 XS

Alignment Name: Approach 1 Input Grid Factor: Note: All units in this report are in feet unless specified otherwise.

Surface: Approach1

Station: 6000.000

Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway

Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L

Offset -20.743 -15.473 -14.000 -13.414 -13.414 -12.572

Elevation 63.867 63.648 64.991 64.678 64.678 64.690

Northing 395420.687 395416.873 395415.806 395415.382 395415.382 395414.773

Easting 759019.733 759023.370 759024.386 759024.790 759024.790 759025.371

Existing Ground

63.867 64.014 64.055 64.071 64.071 64.094

Slope

Station: 6025.000

Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway

Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L

Offset -18.793 -13.378 -12.031 -11.372 -11.372 -10.608

Elevation 65.966 65.794 67.092 66.797 66.797 66.798

Northing 395436.526 395432.607 395431.632 395431.155 395431.155 395430.602

Easting 759039.174 759042.910 759043.839 759044.294 759044.294 759044.821

Existing Ground

65.966 66.133 66.122 66.117 66.117 66.111

Slope

Station: 6050.000

Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway

Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L

Offset -26.682 -25.487 -24.258 -23.532 -23.532 -22.839

Elevation 68.014 67.162 68.418 68.140 68.140 68.132

Northing 395459.487 395458.622 395457.732 395457.207 395457.207 395456.705

Easting 759051.824 759052.649 759053.497 759053.998 759053.998 759054.476

Existing Ground

68.014 67.879 67.763 67.695 67.695 67.630

Slope

Station: 6057.914

Feature Slope_Stake_L_L_L_R_L Pavt_EOP_Layer4_L_L Parkway

Back_L_L_L_R_L Pavt_EOP_Layer3_L_L Shdr_Wedge_Layer2_L_L Pavt_EOP_Layer1_L_L Pavt_EOP_Layer2_L_L

Offset -18.660 -15.194 -14.000 -13.255 -13.255 -12.582

Elevation 67.810 67.343 68.587 68.313 68.313 68.303

Northing 395459.142 395456.633 395455.769 395455.230 395455.230 395454.743

Easting 759063.088 759065.479 759066.304 759066.818 759066.818 759067.282

Existing Ground

67.810 67.484 67.375 67.356 67.356 67.340

Slope

Surface: BL13

Station: 6057.914

Feature Slope_Stake_R

Offset 22.227

Elevation 66.471

Northing 395429.548

Easting 759091.301

Existing Ground

66.471

Slope

Surface: BL14

Station: 6057.914

Feature Back_Top1_L_L

Offset -39.144

Elevation 69.223

Northing 395473.968

Easting 759048.953

Existing Ground

69.312

Slope

Page 1 of 1Cross Section Gradebook with Northing/Easting Report