wa-a2015025_ha.pdf
PDF 277 KB Posted
- Attached to
- WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
- Solicitation number
- 69056721B000010
About this file
This document contains a horizontal alignment review report and details of a related federal contract opportunity. The horizontal alignment review report provides technical specifications for two road alignments including stationing, northing, easting, element type, tangential direction and length.
The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration seeking proposals for Phase II of a public access enhancement project at the Willapa National Wildlife Refuge. The solicitation documents are attached but no other details are provided regarding required products or services, response dates, or award timing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids Awarded.pdf | ||
| Bid Opening Sign-in sheet.pdf | ||
| BidSum.pdf | ||
| Amendment A002.pdf | ||
| Amendment A002.pdf | ||
| QA_1-25-22.pdf | ||
| QA2_1-21-22.pdf | ||
| QA_1-21-22.pdf | ||
| QA_1-20-22.pdf | ||
| QA_1-14-22.pdf | ||
| Amendment A001.pdf | ||
| QA_1-13-22.pdf | ||
| QA_1-12-22.pdf | ||
| Corridor Reports Approach 1.pdf | ||
| WA Pacific 2015 (2) IFB.pdf | ||
| wa-a2015025_va.pdf | ||
| wa-a2015025_Approach_Overflow_XS.pdf | ||
| wa-a2015025_Approach1_XSReport.pdf | ||
| xml and dxf files.zip | ZIP file | |
| Geotech Report_PBS.pdf | ||
| Corridor Reports Overflow.pdf | ||
| GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf | ||
| wa-a2015025_control_points.xlsx | XLSX spreadsheet | |
| final wa-a2015025_PlanSet.pdf | ||
| Qunatities by Named Boundaries.pdf | ||
| wa-a2015025_Overflow_XSReport.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Horizontal Alignment Review Report
Report Created: Tuesday, July 27, 2021 Time: 3:57:05 PM
Project: Default
Description:
File Name: c:\pw-work\d0460867\wa-a2015025_COR.dgn
Last Revised: 7/27/2021 15:37:43 Note: All units in this report are in feet unless specified otherwise.
Alignment Name: Approach 1
Alignment Description:
Alignment Style: Alignment\Baseline
Station Northing Easting
Element: Linear
START ( ) 5989.034 395398.106 759026.110
END ( ) 6066.396 395451.489 759082.103
Tangential Direction: N46.368°E
Tangential Length: 77.362
Alignment Name: Overflow
Alignment Description:
Alignment Style: Alignment\Baseline - Alt 3
Station Northing Easting
Element: Linear
START ( ) 7966.902 395600.080 759216.047
HPI ( ) 8049.584 395679.675 759238.429
Tangential Direction: N15.706°E
Tangential Length: 82.682
Element: Linear
HPI ( BLAlt3 ) 8049.584 395679.675 759238.429
END ( ) 8139.584 395769.526 759233.249
Tangential Direction: N3.300°W
Tangential Length: 90.000
Page 1 of 1Horizontal Alignment Review Report
7/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTngs0pfn4.html
File details come from the government source that posted it. Updated .