wa-a2015025_ha.pdf

PDF 277 KB Posted

Attached to
WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
Solicitation number
69056721B000010
Issued by

About this file

This document contains a horizontal alignment review report and details of a related federal contract opportunity. The horizontal alignment review report provides technical specifications for two road alignments including stationing, northing, easting, element type, tangential direction and length.

The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration seeking proposals for Phase II of a public access enhancement project at the Willapa National Wildlife Refuge. The solicitation documents are attached but no other details are provided regarding required products or services, response dates, or award timing.

View the file

Other files

File Type Posted
Tabulation of Bids Awarded.pdf PDF
Bid Opening Sign-in sheet.pdf PDF
BidSum.pdf PDF
Amendment A002.pdf PDF
Amendment A002.pdf PDF
QA_1-25-22.pdf PDF
QA2_1-21-22.pdf PDF
QA_1-21-22.pdf PDF
QA_1-20-22.pdf PDF
QA_1-14-22.pdf PDF
Amendment A001.pdf PDF
QA_1-13-22.pdf PDF
QA_1-12-22.pdf PDF
Corridor Reports Approach 1.pdf PDF
WA Pacific 2015 (2) IFB.pdf PDF
wa-a2015025_va.pdf PDF
wa-a2015025_Approach_Overflow_XS.pdf PDF
wa-a2015025_Approach1_XSReport.pdf PDF
xml and dxf files.zip ZIP file
Geotech Report_PBS.pdf PDF
Corridor Reports Overflow.pdf PDF
GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf PDF
wa-a2015025_control_points.xlsx XLSX spreadsheet
final wa-a2015025_PlanSet.pdf PDF
Qunatities by Named Boundaries.pdf PDF
wa-a2015025_Overflow_XSReport.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report

Report Created: Tuesday, July 27, 2021 Time: 3:57:05 PM

Project: Default

Description:

File Name: c:\pw-work\d0460867\wa-a2015025_COR.dgn

Last Revised: 7/27/2021 15:37:43 Note: All units in this report are in feet unless specified otherwise.

Alignment Name: Approach 1

Alignment Description:

Alignment Style: Alignment\Baseline

Station Northing Easting

Element: Linear

START ( ) 5989.034 395398.106 759026.110

END ( ) 6066.396 395451.489 759082.103

Tangential Direction: N46.368°E

Tangential Length: 77.362

Alignment Name: Overflow

Alignment Description:

Alignment Style: Alignment\Baseline - Alt 3

Station Northing Easting

Element: Linear

START ( ) 7966.902 395600.080 759216.047

HPI ( ) 8049.584 395679.675 759238.429

Tangential Direction: N15.706°E

Tangential Length: 82.682

Element: Linear

HPI ( BLAlt3 ) 8049.584 395679.675 759238.429

END ( ) 8139.584 395769.526 759233.249

Tangential Direction: N3.300°W

Tangential Length: 90.000

Page 1 of 1Horizontal Alignment Review Report

7/27/2021file:///C:/Users/kristina.hossley/AppData/Local/Temp/RPTngs0pfn4.html

File details come from the government source that posted it. Updated .