Qunatities by Named Boundaries.pdf

PDF 296 KB Posted

Attached to
WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
Solicitation number
69056721B000010
Issued by

About this file

This document contains a volumes report and details of a related federal contract opportunity for public access enhancement work. The volumes report provides quantity data for various construction elements including cut and fill volumes, pavement and aggregate layers, curb dimensions, and utility infrastructure. It appears to be technical specifications for a road or site construction project.

The associated federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for Phase II of a public access enhancement project at the Willapa National Wildlife Refuge in Washington. The solicitation documents are attached but no further details are provided regarding response due dates, award timing, pricing terms, or set-asides. The opportunity type is listed as a solicitation but the requirements for products or services are not clearly defined.

View the file

Other files

File Type Posted
Tabulation of Bids Awarded.pdf PDF
Bid Opening Sign-in sheet.pdf PDF
BidSum.pdf PDF
Amendment A002.pdf PDF
Amendment A002.pdf PDF
QA_1-25-22.pdf PDF
QA2_1-21-22.pdf PDF
QA_1-21-22.pdf PDF
QA_1-20-22.pdf PDF
QA_1-14-22.pdf PDF
Amendment A001.pdf PDF
QA_1-13-22.pdf PDF
QA_1-12-22.pdf PDF
Corridor Reports Approach 1.pdf PDF
WA Pacific 2015 (2) IFB.pdf PDF
wa-a2015025_va.pdf PDF
wa-a2015025_Approach_Overflow_XS.pdf PDF
wa-a2015025_ha.pdf PDF
wa-a2015025_Approach1_XSReport.pdf PDF
xml and dxf files.zip ZIP file
Geotech Report_PBS.pdf PDF
Corridor Reports Overflow.pdf PDF
GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf PDF
wa-a2015025_control_points.xlsx XLSX spreadsheet
final wa-a2015025_PlanSet.pdf PDF
wa-a2015025_Overflow_XSReport.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantities Report by Named Boundary

Report Created: Thursday, July 15, 2021 Time: 10:00:13 AM

Named Boundary Group:

Unnamed Plan

Alignment Name:

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

648.637 Plan 1

Volumes_Cut: 51528.380 3801.000

Volumes_Fill: 8969.222 292.967

XS_TL_Curb Back Bot: 118.663

XS_TL_Curb Back Top: 592.989

XS_TL_Curb Face Top: 118.255

XS_TL_Curb FL: 118.180

XS_TL_Edge of Pavt: 1297.126

XS_TL_Curb Face Bot: 118.180

Underground Sanitary Sewer: 210.246

Baseline - Alt 3: 255.364

Baseline: 1019.505

XS_TL_Edge of Pavt 1: 1031.869

XS_TL_Centerline 3: 197.543

XS_TL_Centerline 2: 197.543

XS_TL_Edge of Pavt 2: 1031.869

XS_TL_Centerline 1: 197.543

XS_TL_Cut: 933.786

XS_TL_Subgrade: 1234.713

XS_TL_Edge of Pavt 3: 1033.805

XS_TL_Edge of Shld 2: 518.495

XS_TL_Centerline: 197.543

XS_TL_Slopes: 1377.947

XS_TL_Fill: 366.231

Ditch Centerline: 320.259

AUX_07: 55.600

XS_TC_Curb Top: 114.386 1.095

XS_TC_Underground Water: 234.132 12.756

XS_TC_Pavement Layer 2: 62680.642 388.724

XS_TC_Pavement Layer 3: 37855.081 1207.612

XS_TC_Fill: 3840.059

XS_TC_Cut: 6836.312

XS_TC_Pavement Layer 4: 17090.069 203.546

XS_TC_Shoulder Foreslope: 503.029

XS_TC_Foreslope: 372.894

XS_TC_Parkway: 1186.283

XS_TC_Pavement Layer 1: 9264.453 114.891

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 1 of 2Volumes Report

7/15/2021file:///C:/Users/KRISTI~1.HOS/AppData/Local/Temp/7FFFSWP2.htm kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Sticky Note Overflow Aggregate Approach Agg kristina.smith Sticky Note Parking Pavement kristina.smith Sticky Note Parking Agg kristina.smith Sticky Note Approach Pavement

XS_TL_Edge of Overlay 1: 244.339

XS_TL_Edge of Overlay 3: 1099.952

XS_TL_Edge of Overlay 2: 694.824

XS_TL_Edge of Overlay: 124.320

Baseline - Alt 2: 73.778

XS_TC_Milling: 5052.846 31.364

XS_TC_Leveling: 2232.099 12.494

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 2 of 2Volumes Report

7/15/2021file:///C:/Users/KRISTI~1.HOS/AppData/Local/Temp/7FFFSWP2.htm kristina.smith Highlight

File details come from the government source that posted it. Updated .