Qunatities by Named Boundaries.pdf
PDF 296 KB Posted
- Attached to
- WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
- Solicitation number
- 69056721B000010
About this file
This document contains a volumes report and details of a related federal contract opportunity for public access enhancement work. The volumes report provides quantity data for various construction elements including cut and fill volumes, pavement and aggregate layers, curb dimensions, and utility infrastructure. It appears to be technical specifications for a road or site construction project.
The associated federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for Phase II of a public access enhancement project at the Willapa National Wildlife Refuge in Washington. The solicitation documents are attached but no further details are provided regarding response due dates, award timing, pricing terms, or set-asides. The opportunity type is listed as a solicitation but the requirements for products or services are not clearly defined.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids Awarded.pdf | ||
| Bid Opening Sign-in sheet.pdf | ||
| BidSum.pdf | ||
| Amendment A002.pdf | ||
| Amendment A002.pdf | ||
| QA_1-25-22.pdf | ||
| QA2_1-21-22.pdf | ||
| QA_1-21-22.pdf | ||
| QA_1-20-22.pdf | ||
| QA_1-14-22.pdf | ||
| Amendment A001.pdf | ||
| QA_1-13-22.pdf | ||
| QA_1-12-22.pdf | ||
| Corridor Reports Approach 1.pdf | ||
| WA Pacific 2015 (2) IFB.pdf | ||
| wa-a2015025_va.pdf | ||
| wa-a2015025_Approach_Overflow_XS.pdf | ||
| wa-a2015025_ha.pdf | ||
| wa-a2015025_Approach1_XSReport.pdf | ||
| xml and dxf files.zip | ZIP file | |
| Geotech Report_PBS.pdf | ||
| Corridor Reports Overflow.pdf | ||
| GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf | ||
| wa-a2015025_control_points.xlsx | XLSX spreadsheet | |
| final wa-a2015025_PlanSet.pdf | ||
| wa-a2015025_Overflow_XSReport.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantities Report by Named Boundary
Report Created: Thursday, July 15, 2021 Time: 10:00:13 AM
Named Boundary Group:
Unnamed Plan
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
648.637 Plan 1
Volumes_Cut: 51528.380 3801.000
Volumes_Fill: 8969.222 292.967
XS_TL_Curb Back Bot: 118.663
XS_TL_Curb Back Top: 592.989
XS_TL_Curb Face Top: 118.255
XS_TL_Curb FL: 118.180
XS_TL_Edge of Pavt: 1297.126
XS_TL_Curb Face Bot: 118.180
Underground Sanitary Sewer: 210.246
Baseline - Alt 3: 255.364
Baseline: 1019.505
XS_TL_Edge of Pavt 1: 1031.869
XS_TL_Centerline 3: 197.543
XS_TL_Centerline 2: 197.543
XS_TL_Edge of Pavt 2: 1031.869
XS_TL_Centerline 1: 197.543
XS_TL_Cut: 933.786
XS_TL_Subgrade: 1234.713
XS_TL_Edge of Pavt 3: 1033.805
XS_TL_Edge of Shld 2: 518.495
XS_TL_Centerline: 197.543
XS_TL_Slopes: 1377.947
XS_TL_Fill: 366.231
Ditch Centerline: 320.259
AUX_07: 55.600
XS_TC_Curb Top: 114.386 1.095
XS_TC_Underground Water: 234.132 12.756
XS_TC_Pavement Layer 2: 62680.642 388.724
XS_TC_Pavement Layer 3: 37855.081 1207.612
XS_TC_Fill: 3840.059
XS_TC_Cut: 6836.312
XS_TC_Pavement Layer 4: 17090.069 203.546
XS_TC_Shoulder Foreslope: 503.029
XS_TC_Foreslope: 372.894
XS_TC_Parkway: 1186.283
XS_TC_Pavement Layer 1: 9264.453 114.891
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 1 of 2Volumes Report
7/15/2021file:///C:/Users/KRISTI~1.HOS/AppData/Local/Temp/7FFFSWP2.htm kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Highlight kristina.smith Sticky Note Overflow Aggregate Approach Agg kristina.smith Sticky Note Parking Pavement kristina.smith Sticky Note Parking Agg kristina.smith Sticky Note Approach Pavement
XS_TL_Edge of Overlay 1: 244.339
XS_TL_Edge of Overlay 3: 1099.952
XS_TL_Edge of Overlay 2: 694.824
XS_TL_Edge of Overlay: 124.320
Baseline - Alt 2: 73.778
XS_TC_Milling: 5052.846 31.364
XS_TC_Leveling: 2232.099 12.494
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 2 of 2Volumes Report
7/15/2021file:///C:/Users/KRISTI~1.HOS/AppData/Local/Temp/7FFFSWP2.htm kristina.smith Highlight
File details come from the government source that posted it. Updated .