Amendment A002.pdf
PDF 849 KB Posted
- Attached to
- WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II
- Solicitation number
- 69056721B000010
About this file
This document is an amendment to a solicitation for the WA PACIFIC 2015(2) Public Access Enhancement to Willapa National Wildlife Refuge Phase II project. The amendment revises the bid opening date from January 27, 2022 to February 1, 2022. It also makes revisions to line items, plans, and specifications including changing woven geotextile to non-woven geotextile. Bidders are instructed to submit revised pages with their bids. The solicitation is issued by the Department of Transportation Federal Highway Administration for roadway construction work including excavation, paving, utilities, erosion control, and traffic control.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids Awarded.pdf | ||
| Bid Opening Sign-in sheet.pdf | ||
| BidSum.pdf | ||
| Amendment A002.pdf | ||
| QA_1-25-22.pdf | ||
| QA2_1-21-22.pdf | ||
| QA_1-21-22.pdf | ||
| QA_1-20-22.pdf | ||
| QA_1-14-22.pdf | ||
| Amendment A001.pdf | ||
| QA_1-13-22.pdf | ||
| QA_1-12-22.pdf | ||
| Corridor Reports Approach 1.pdf | ||
| WA Pacific 2015 (2) IFB.pdf | ||
| wa-a2015025_va.pdf | ||
| wa-a2015025_Approach_Overflow_XS.pdf | ||
| wa-a2015025_ha.pdf | ||
| wa-a2015025_Approach1_XSReport.pdf | ||
| xml and dxf files.zip | ZIP file | |
| Geotech Report_PBS.pdf | ||
| Corridor Reports Overflow.pdf | ||
| GM 12 19 Final Geotechnical and Construction Recommendaitons.pdf | ||
| wa-a2015025_control_points.xlsx | XLSX spreadsheet | |
| final wa-a2015025_PlanSet.pdf | ||
| Qunatities by Named Boundaries.pdf | ||
| wa-a2015025_Overflow_XSReport.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 01/25/2022 N/A See Block 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056721B000010
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_x_ ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA PACIFIC 2015(2), Public Access Enhancement to Willapa National Wildlife Refuge Phase II
See page 2
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 01-25-2022 Project No: WA PACIFIC 2015(2) Solicitation No. 69056721B000010 Project Name: Public Access Enhancement to
Willapa National Wildlife Refuge Phase II
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change) Page A-3, Block 13A. Revises bid opening date from 01/27/2022 to 02/01/2022.
BID SCHEDULE
Page A-8. Revises Line Item number A0220, Pay Item Number 20701-0500 Separation
Stabilization Geotextile, Class 1, type E (woven) to 20701-0500 Separation- Stabilization Geotextile, Class 1, type E (non-woven).
CONTRACT CLAUSES
PLANS
Plan sheet B.1 thru B.2 Revises Line Item number A0220, Pay Item Number 20701-0500 Separation-Stabilization Geotextile, Class 1, type E (woven) to 20701-0500 Separation-Stabilization Geotextile, Class 1, type E (non-woven).
Plan sheet C.1 Revises Separation-Stabilization geotextile filter, class 1, type E fabric (woven) to Separation-Stabilization Geotextile, Class 1, type E (non-woven).
Plan sheet C.2 Revises Separation-Stabilization geotextile filter, class 1, type E fabric (woven) to Separation-Stabilization Geotextile, Class 1, type E (non-woven).
Plan sheet D.1 Revises Item No. 20701-0500 Separation-Stabilization Geotextile, Class 1, type E (woven) to Separation-Stabilization Geotextile, Class 1, type E (Non-Woven)
ENCLOSURES
Pages:
A-7 through A-10
Notice to Bidders: Please submit revised pages A-7 through A-10 with your bid.
New bid opening date: 02-01-2022
Amendment No. A002, dated 01-25-2022 Project No: WA PACIFIC 2015(2) Solicitation No. 69056721B000010 Project Name: Public Access Enhancement to
Willapa National Wildlife Refuge Phase II
Plan Sheets:
B.1 through B.2 C.1 C.2 D.1
Page(s) not included due to Pen and Ink change(s):
A-3
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:WA PACIFIC 2015(2)
Project Name:PUBLIC ACCESS ENHANCEMENT TO WILLAPA NATIONAL WILDLIFE REFUGE PHASE II Revised by Amendment A002
A - 8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
1,020 LNFT $____________ $____________
A0140 15706-0200 SOIL EROSION CONTROL, CHECK DAM
15 EACH $____________ $____________
A0160 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
50 SQYD $____________ $____________
A0180 20401-0000 ROADWAY EXCAVATION
4,180 CUYD $____________ $____________
A0200 20410-0000 SELECT BORROW
310 CUYD $____________ $____________
A002 A0220 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E (non-woven)
3,920 SQYD $____________ $____________
A0240 30201-2000 ROADWAY AGGREGATE, METHOD 2
1,270 CUYD $____________ $____________
A0260 30302-5000 AGGREGATE SURFACE RECONDITIONING
311 LNFT $____________ $____________
A0280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
1,030 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:PUBLIC ACCESS ENHANCEMENT TO WILLAPA NATIONAL WILDLIFE REFUGE PHASE II Revised by Amendment A002
A - 9
A0300 41201-0000 TACK COAT
3 TON $____________ $____________
A0320 60915-1000 WHEELSTOP, CONCRETE
26 EACH $____________ $____________
A0340 61102-1545 2-INCH WATERLINE
155 LNFT $____________ $____________
A0360 61202-0100 4-INCH SEWER LINE, PLASTIC
120 LNFT $____________ $____________
A0380 61207-0000 CLEANOUT
1 EACH $____________ $____________
A0400 61501-0200 SIDEWALK, COLORED CONCRETE (STAMPED)
170 SQYD $____________ $____________
A0420 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
30-INCH WIDTH
40 HOUR $____________ $____________
A0440 62201-3000 HYDRAULIC EXCAVATOR
40 HOUR $____________ $____________
A0460 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
A0480 62501-0000 TURF ESTABLISHMENT
1.0 ACRE $____________ $____________
A0500 63302-0000 SIGN SYSTEM
20 SQFT $____________ $____________
A0520 63309-0900 DELINEATOR, TYPE FLEXIBLE , GROUND MOUNTED
3 EACH $____________ $____________
A0540 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
5,344 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:PUBLIC ACCESS ENHANCEMENT TO WILLAPA NATIONAL WILDLIFE REFUGE PHASE II Revised by Amendment A002
A - 10
A0560 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
8 EACH $____________ $____________
A0580 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
4 EACH $____________ $____________
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
A0620 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
45 SQFT $____________ $____________
A001 A0640 63622-0000 UTILITY TRENCH
120 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:WA PACIFIC 2015(2)
Project Name:PUBLIC ACCESS ENHANCEMENT TO WILLAPA NATIONAL WILDLIFE REFUGE PHASE II
A001: Revised by Amendment A001
Revised by Amendment A002
Sheet and Description
SECTION D SECTION F SECTION G SECTION H SECTION I -
PLAN & PROFILE UTILITIES EROSION CONTROL TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,000 20 1,020
A0140 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 9 6 15
A0160 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 50 50
A0180 20401-0000 ROADWAY EXCAVATION CUYD 3,800 380 4,180
A0200 20410-0000 SELECT BORROW CUYD 295 15 310
A002 A0220 20701-0500 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE E
(non-woven) SQYD 3,565 355 3,920
A0240 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 1,210 60 1,270
A0260 30302-5000 AGGREGATE SURFACE RECONDITIONING LNFT 286 25 311
A0280 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 980 50 1,030
A0300 41201-0000 TACK COAT TON 3 3
A0320 60915-1000 WHEELSTOP, CONCRETE EACH 26 26
A0340 61102-1545 2-INCH WATERLINE LNFT 130 25 155
A0360 61202-0100 4-INCH SEWER LINE, PLASTIC LNFT 120 120
A0380 61207-0000 CLEANOUT EACH 1 1
A0400 61501-0200 SIDEWALK, COLORED CONCRETE (STAMPED) SQYD 170 170
A0420 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
30-INCH WIDTH HOUR 40 40
A0440 62201-3000 HYDRAULIC EXCAVATOR HOUR 40 40
A0460 62301-0000 GENERAL LABOR HOUR 20 20
A0480 62501-0000 TURF ESTABLISHMENT ACRE 1.0 1.0
A0500 63302-0000 SIGN SYSTEM SQFT 20 20
A0520 63309-0900 DELINEATOR, TYPE FLEXIBLE, GROUND
MOUNTED EACH 3 3
A0540 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
(WHITE) LNFT 5,144 200 5,344
A0560 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT
ARROW EACH 8 8
MileStone: Amendment A002 Amendment Review Date: 01/25/22 Report Date: 01/25/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J an
-2
:2
A M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1PACIFIC 2015(2)WA
SHEET
NUMBER
A002: Revised by Amendment A002
Sheet and Description
SECTION D SECTION F SECTION G SECTION H SECTION I -
PLAN & PROFILE UTILITIES EROSION CONTROL TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL ALLOWANCE Bid Schedule
A0580 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 4 4
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 2
A0620 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 35 10 45
A001 A0640 63622-0000 UTILITY TRENCH LNFT 120 120
-J an -2
:2
A M
MileStone: Amendment A002 Amendment Review Date: 01/25/22 Report Date: 01/25/22 c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2PACIFIC 2015(2)WA
SHEET
NUMBER
A001: Revised by Amendment A001
NO SCALE
60+00 TO 60+77.36
APPROACH ROAD 1
Varies
Select borrow
12" compacted depth
Roadway aggregate, method 2, C o n s tr u c ti o n l im it s
SAFETY EDGE DETAIL
to cover safety edge
Pull aggregate base
Roadway aggregate, Method 2
First lift of asphalt
Second lift of asphalt
C o n s tr u c ti o n l im it s
Traveled Way Traveled Way
Profile grade
Existing ground limits establishment
Turf limits
Turf establishment
CL
Traveled Way Traveled Way
44+15.25 to 45+24
MAINLINE 67TH PLACE
Select borrow method 2, 12" compacted depth
Roadway aggregate, 3" compacted depth type 1, placed in two equal lifts, Asphalt concrete pavement, Tack coat (between lifts)
2%
C o n s tr u c ti o n l im it s
Profile grade
Existing ground
Existing Riprap Ditch limits establishment
Turf
[1]
CL
2% li m it s
C o n s tr u c ti o n
Width varies riprap ditch
Tie into top of existing
Traveled Way Traveled Way
45+24 to 46+20
43+34 to 44+15.25
MAINLINE 67TH PLACE
reconditioning
Aggregate surface
3" compacted depth type 1, placed in two equal lifts, Asphalt concrete pavement, Tack coat (between lifts)
2%
C o n s tr u c ti o n l im it s
Profile grade
Existing ground Existing Riprap Ditch
CL
2% li m it s
C o n s tr u c ti o n
3" compacted depth type 1, placed in two equal lifts, Asphalt concrete pavement, [1] [1] geotextile filter, class 1, type E (woven)
Separation-stabilization
[2]
[1] Construct slopes per the 3D model.
behind finished slopes
Terminate separation-stabilization geotextile one foot
FOOTNOTE:
[2] 2
(non-woven)
Revised by Amendment A002
1:3
1:3
1:3 1:3
1:31:3
1:3
Varies 19' - 23'Varies 16' -35'
5' 5'
1' 1'10'10'
5'
0' - 4' Varies
1' 1'10'10'
:1
A
M
J a n u a r y w a a c a .d g n c p w w o r k \d
\w a a c a .d g n
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
WA PACIFIC 2015(2) C.1
NO SCALE
A-A
HEADQUARTERS PARKING LOT
2% typ.
Turf establishment limits
C le a r in g l im it s
C o n s tr u c ti o n l im it s
ROUNDING DETAIL
FILL SLOPE
ROUNDING DETAIL
[2]CUT SLOPE
[2]
Va ria ble
S lo p e s ta k e
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
0.25 D
0.25 D
Existing ground
Slope stake
Existing ground
Select borrow placed in two equal lifts, 3" compacted depth
Asphalt concrete pavement, type 1, 12" compacted depth
Roadway aggregate, method 2, Tack coat (between lifts)
[2]
[1] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than "B" reduce "B" to the cut height
Construct slopes per the 3D model.
Place aggregate per section 302.
behind finished slopes
Terminate separation-stabilization geotextile one foot
FOOTNOTE:
Existing ground
Existing concrete curb
[1]
A A
LINE
CROSS SECTION
[3] geotextile filter, class 1, type E (woven)
Separation-stabilization [3]
B
B
Traveled way Traveled way
Existing ground
CL
3% limits establishment
Turf
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
3%
80+00 to 81+40
B-B
OVERFLOW APPROACH
6" compacted depth
Conserved aggregate from existing parking lot, [4]
[4]
(non-woven)
2 Revised by Amendment A002
1:3
(1:2 max.)
Varies
1:
1:3
5'
10'-0'
B = 5'5'
D
D
5'5'
Varies
10' (typ.)10' (typ.) limits establishment
Turf
:3
J a n u a r y w a a c b .d g n p w w o r k
\d
\w a a c b
.d g n
TYPICAL SECTIONS
STATE PROJECT
NUMBER
WA PACIFIC 2015(2) C.2
(non-woven)
2 Revised by Amendment A002
:5
A u g u s t
T
A B
U L
A T
IO
N
O F
P L
A N
A N
D P
R O
F
IL
E Q
U A
N T
IT
IE
S p w w o r k \d
\w a a d a .d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
WA PACIFIC 2015 (2) D.1
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
| sheets B.1 through B.2.pdf |
| C1 |
| C2 |
| D1 |