This document is a Work Breakdown Structure (WBS) attachment for the TEIS IV Program, providing the Government's estimated allocation of work across functional areas for informational and planning purposes only. The contract number is W91RUS27RA001.

The work breakdown encompasses 17 base contract tasks with the following primary allocations: Information Systems Integration/Installation represents the largest share at 24.6%, followed by Information Systems Engineering at 15.8%, Project Services at 11.4%, and Engineering and Site Surveys at 12%. Additional significant work areas include Cybersecurity (10.1%), Test and Evaluation (7.7%), and Project Management (6.2%). Smaller allocations are distributed across Transitional Operations and Maintenance Service (3.6%), Information Technology Technical Services (1.5%), Information Systems Documentation (2.7%), Drafting and Illustration Support (2.1%), Technical Instruction (0.5%), Approved Products List Certification (0.1%), Software (0.7%), Systems/Network Administration (0.5%), Systems Analysis (0.2%), and Technology Demonstration and Rapid Prototype Support (0.3%). The Government explicitly notes this breakdown is for informational purposes only and represents its best estimate for contractor planning purposes.

View the file

Other files

File Type Posted
ATT0065 CONUS High CONUS OCONUS Labor Rates - 11042026.xlsx XLSX spreadsheet
B08 Questions Spreadsheet - 11042026.xlsx XLSX spreadsheet
Solicitation Amendment - W91RUS27RA0010002 Conformed Copy.pdf PDF
B08 Questions Spreadsheet - 10282026.xlsx XLSX spreadsheet
Solicitation Amendment W91RUS27RA0010002 SF 30.pdf PDF
ATT0020 TEIS IV - Draft Labor Category Descriptions - 10282026.docx DOCX document
ATT0021 item a TEIS IV - DD254 20261026.pdf PDF
ATT0065 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0060 Sample Task-Technologies.docx DOCX document
ATT0067 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0072 DD254 Appendix B- ICD-503.pdf PDF
ATT0070 Baltimore MD 2015-4265 rev 35.pdf PDF
ATT0077 DCSA FCL Orientation Handbook.pdf PDF
ATT0019 TEIS IV QASP.pdf PDF
Solicitation Amendment W91RUS27RA0010001 SF 30.pdf PDF
ATT0021 item c TEIS IV - D254 - Contract AT-OPSEC Security Review Cover Sheet.pdf PDF
ATT0063 Past Performance Reference List (PART A).pdf PDF
ATT0066 Small Business Participation Commitment Document (SBPCD).docx DOCX document
Section J Attachments.xlsx XLSX spreadsheet
ATT0071 Fairfax VA WD 2015-4281 rev 37.pdf PDF
ATT0052 Sample Task-Satellite Communications.docx DOCX document
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0020 TEIS IV - Draft Labor Category Descriptions.docx DOCX document
ATT0074 DD254 Appendix B- IC Tech Spec-for ICD_ICS 705.pdf PDF
ATT0022 Sample Task Cybersecurity Pkg Update.docx DOCX document
ATT0075 DD254 Appendix B- DoDM 5105 Vol 1.pdf PDF
ATT0064 Past Performance Questionnaire.pdf PDF
ATT0073 DD254 Appendix B- ICD-704.pdf PDF
Solicitation Amendment - W91RUS27RA0010001 Conformed Copy.pdf PDF
Questions Spreadsheet.xlsx XLSX spreadsheet
ATT0064 Past Performance Questionnaire.docx DOCX document
ATT0021 item b TEIS IV - DD254 Item 13 Continuation Page.pdf PDF
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0076 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
ATT0024 1.6.1B_ESS Network Diagram.pdf PDF
ATT0062 Past Performance Information Summary (PART B).docx DOCX document
ATT0048 CDRL SE019 Executive Summary.pdf PDF
ATT0026 1.6.2A_ITV HW-SW List.xlsx XLSX spreadsheet
ATT0074 DD254 Appendix B- DoDM 5105 Vol 1.pdf PDF
ATT0010 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1.pdf PDF
ATT0025 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0021 item a TEIS IV - DD254.pdf PDF
ATT0038 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0017 CDRL A007.pdf PDF
ATT0015 CDRL A005.pdf PDF
ATT0008 2.5 item j I3A Technical Criteria (for OSP Only) November 2017 - Copy.pdf PDF
ATT0039 CDRL SE009 DCAFS.pdf PDF
ATT0053 CDRL TS24 Site Survey Report.pdf PDF
ATT0050 CDRL SE022 SCAR.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J, Attachment 068 W91RUS27RA001

ISEC Estimation of Work Break-Out by Functional Area For Informational Purposes Only

The Government estimates the following breakout of work on the TEIS IV Program according to the functional areas of the TEIS IV Performance Work Statement. This is for informational purposes and represents the Government’s best estimate. This information is provided for planning purposes only.

Work Breakdown Structure

Base Contract Tasks

TEIS IV

Work

Percentage

3.2 Engineering and Site Surveys

3.3 Information Systems Engineering

3.4 Cybersecurity

3.5 Approved Products List Certification

3.6 Information Systems Integration/Installation

3.7 Test and Evaluation

3.8 Software

3.9 Transitional Operations and Maintenance Service

3.10 Information Technology Technical Services

3.11 Information Systems Documentation

3.12 Technical Instruction

3.13 Drafting and Illustration Support

3.14 Project Services

3.15 Project Management

3.16 Systems / Network Administration

3.17 Systems Analysis

3.18 Technology Demonstration and Rapid Prototype Support

12%

15.8%

10.1%

0.1%

24.6%

7.7%

0.7%

3.6%

1.5%

2.7%

0.5%

2.1%

11.4%

6.2%

0.5%

0.2%

0.3%

File details come from the government source that posted it. Updated .