This is a Statement of Work (SOW) for monthly on-site water treatment services for four cooling tower systems at the U.S. Army Electronic Proving Ground (EPG) Environmental Test Facility (ETF) located at Fort Huachuca, Arizona. The contract covers full-service chemical treatment for two Baltimore Aircoil Company FXT-211C axial fan forced draft cooling towers (300-ton capacity each with 600-gallon sumps), one Evapco West LSWE45J12 centrifugal fan closed glycol circuit tower (75-ton capacity with 150-gallon sump), and one Delta Cooling Towers, Inc. T-1501 induced draft tower (150-ton capacity with 468-gallon sump). The contractor must conduct a minimum of one service call per month from March 2026 through March 2027 (base year), with four option years extending through March 2031 and a potential six-month extended option.
The contractor's responsibilities include initial onsite water testing, provision and maintenance of all chemicals for scale, corrosion, and microbiological fouling control, furnishing and applying biocides, checking and calibrating chemical control equipment, cleaning and maintaining chemical pumps and conductivity/pH equipment, inspecting cooling towers and cleaning Y strainers, replacing filters, providing laboratory water analysis, and conducting annual scale cleaning of the towers and basins. The contractor must submit written monthly water treatment reports electronically within 24 hours of service completion and provide online access to service reporting, data trending, and operator logs. The Government will provide fully functional chemical feed or control equipment and personnel to assist in daily minor operations. Place of performance is the Environmental Test Facility Compound at 1337 Arizona Street, Sierra Vista, Arizona 85613, with hours of operation from 7:00 AM to 3:00 PM Monday through Friday, excluding weekends and federal holidays. Contractor personnel must comply with Fort Huachuca Installation Access Control System (IACS) requirements and pass background checks.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 Site Visit Questions 31 MAR (002).pdf | ||
| Attachment 6 Site Visit Sign in sheet.pdf | ||
| Attachment 1 Page 2 Site Visit Info.pdf | ||
| SF 30 Amendment 2.pdf | ||
| Attachment 1 Page 1 Extension and Site Visit Info.pdf | ||
| SF 30 Amendment 1.pdf | ||
| Atch 5 Questions and Answers 23 MAR26.pdf | ||
| Amendment 1 Extension and Site Visit Info.pdf | ||
| Attachment 1 Site Visit Info 19Mar.pdf | ||
| SOW Cooling Tower Monthly Service Revised 19 FEB 26.pdf | ||
| Solicitation - W91RUS26QA021 Cooling Tower final.pdf | ||
| Atch 3 FAR 52.204-26 fill in.pdf | ||
| Atch 2 FAR 52.204-24 Need Filled In and Signed-Returned.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) for
Environmental Test Facility (ETF) Cooling Tower Monthly On-site Water Treatment Service
Revised 23 March 2026
1.0 Background
1.1 Objectives
1.2 Scope
1.3 Tasks
1.4 Delivery
1.5 Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, GFI)
1.6 Installation Access
1.7 Travel
1.8 Material Requirements
1.9 Place of performance
1.10 Period of performance
Exhibits A thru D Cooling Tower System Figures
1.0. Background. The U.S. Army Electronic Proving Ground (EPG), Environmental
Test Facility (ETF), Fort Huachuca, Arizona utilizes several mechanical draft cooling towers through evaporation of water liberating waste heat extracted from 13 cascade cooling condensers located around the building compound. Each tower is equipped to constantly measure and meter chemicals which maintain critical pH, hardness, alkalinity, and conductivity levels within the systems. Low microbial activity, corrosion, scaling and fouling must be kept within precise parameters.
1.1. Objectives. The EPG ETF, Fort Huachuca, Arizona is soliciting proposal for full-service monthly chemical treatments for four cooling tower systems which are listed in
Table 1. Exhibit(s) A thru E below providing the Contractor data of all Four cooling tower systems that will be covered underneath this contract. Exhibits are annotated separately and are incorporated within statement of work.
Table 1. Cooling Tower Systems Descriptions
Description Manufacturer Model No. Capacity Sump
Capacity
Axial Fan, Forced Draft Cooling Tower (1) Exhibit A.
Baltimore Aircoil Company
FXT-211C 300-ton 600 gallons
Axial Fan, Forced Draft Cooling Tower (2) Exhibit A.
Baltimore Aircoil Company
FXT-211C 300-ton 600 gallons
Centrifugal Fan Closed Glycol Circuit Tower Exhibit B.
Evapco West LSWE45J12 75-ton 150 gallons
Induced Draft Tower Exhibit C.
Delta Cooling Towers, Inc.
T-1501 150-ton 468 gallons
Axial Fan, Forced Draft Cooling Tower (1) Exhibit D.
Exhibit Displays - Cooling Tower 1, Water Treatment Chemical Containers Placement.
Axial Fan, Forced Draft Cooling Tower (2) Exhibit E.
Exhibit Displays - Cooling Tower 2, Water Treatment Chemical Containers Placement.
1.2. Scope. The contractor must meet the following requirements for each of the cooling tower systems listed in above Table 1:
• Conduct initial onsite water testing to determine what treatment is necessary.
• Provide and maintain all chemicals required for general control of scale, corrosion, and microbiological fouling.
• Conduct a minimum of one service call per month beginning TBD March 2026 to TBD March 2027.
• Furnish and apply products to retard scale and corrosion in condensing water system.
• Remove empty chemical containers.
• Furnish and apply biocides as required.
• Check, clean, and calibrate chemical control and feed equipment.
• Check water treatment control equipment.
• Furnish and apply corrosion inhibitor to closed loop(s) (should water loss occur from system(s). Contractor will provide supplemental inhibitor to trat a maximum water loss of 10-percent system capacity).
• Submit written reports describing findings, along with recommendations for any changes required.
• Provide all laboratory analysis of water and necessary technical expertise.
• Clean all and refill chemical tanks.
• Clean and maintain chemical pumps.
• Clean and maintain conductivity and pH control equipment.
• Inspect cooling tower and clean Y strainers.
• Replace any and all filters used in the water treatment systems.
• Provide access to online service reporting, data trending, and operator logs.
• Control of inventory. Storage of chemicals is to be determined.
• Safety training of on-site personnel.
• Guarantee that the present degree of “operating efficiency” of the cooling tower systems listed in table 1 will be maintained while under the contractor program or it will be cleaned at no additional cost to the government.
• One time, annually clean the scale off the cooling towers, clean the basins and distribution nozzles.
1.3. Tasks. The contractor will provide service to the cooling towers in accordance with the statement of work (SOW) located at the Environmental Test Facility (ETF)
Compound.
1.4. Delivery.
• Deliverables: Monthly water treatment reports describing findings, along with recommendations for any changes required. The report can be delivered electronically via email. Report should be delivered within 24-hours of service completion.
• Delivery time: Each month following the monthly service call.
• Delivery location:
Hard copy:
USA EPG
2000 Arizona St Fort Huachuca, AZ 85613
Point-of-Contact will be determined at the time of award. All Government personnel information will be listed, and emails will be provided at time of award.
1.4.1. Deliverable Schedule.
Deliverable Description Quantity/Media Date Completed
1 Water treatment report 1 electronic copy After monthly service
1.5. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, GFI)
The government will provide:
1. Fully functional chemical feed or control equipment.
2. Replace or repair equipment based on contractor recommendations.
3. Personnel to assist in daily minor operations.
1.6. Installation Access. Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements. The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
Site Visit Information: See Amendment 1 of the solicitation to include U.S. Army Electronic Proving Ground (EPG), Environmental Test Facility (ETF), two step process to request access to the Fort Huachuca Installation and EPG location.
The information below is for the scheduled site visit and post award once a selection is made. NO other site visit will be conducted once the solicitation is closed and/or at the time of the award is made.
Mission Partner will process individuals for access to the installation and background adjudication requirements. Contracting Office does not conduct nor is the approving any access official, the vetting process is solely Mission Partner and with their own security staff.
• Complete Step 2, of “EPG VAR Information” and Base Access for Fort
Huachuca 2025.pdf to a visitor authorization request to the Electronic
Proving Ground (EPG). This process must be completed two (2) business days prior to the scheduled site visit. Additionally, please coordinate prior to scheduled site visit as each persons attending and information as stated within Amendment 1 of the solicitation and IAW requirements Statement of
Work (SOW).
• Installation access for day of the site visit, bring a valid driver’s license or government issued photo identification to the Van Deman Visitor Control
Center (VCC). For access onto the installation, an access badge must be issued and the vendor POC will need to pass a background check. All U.S.
visitors, contractors, and vendors, 18 years and older, who do not have a
DoD identification card will be subject to a background check.
• Mission Partner Point of Contact (POC) will meet all parties Vendor POC(s) at the EPG, Environmental Test Facility (ETF) and issue an EPG, visitor.
Please use the following address to obtain directions to the ETF, located at
1337 Arizona Street, Fort Huachuca, AZ 85613.
1.7. Travel. Not applicable
1.8 Material Requirements Not applicable.
1.9 Place of performance and Hours of Operation: The primary place of performance is Environmental Test Facility Compound, 1337 Arizona Street, Sierra Vista, AZ 85613, areas identified in this SOW. Hours of operations are 0700 – 1500 (7:00AM – 3:00PM), Monday through Friday, except weekends and Federal Holidays.
1.10 Period of performance: Approximate start and end dates will be determined (TBD) March 2026 to March 2027, to include Base and Four Option Years. Period of Performance will include a Base Year and the below stated out-years as options periods. Shall the Government determine additional performance is needed due to fiscal year forecasting requirements or unforeseen events of exercising the option, an extension of service maybe granted. The contractor’s quotation will be evaluated shall services for additional 6-month period be required. Extended option will not extend 6-month period, if applicable:
Base Year Beginning March 2026 until March 2027 (TBD)
Option Year 1 Beginning March 2027 until March 2028 (TBD)
Option Year 2 Beginning March 2028 until March 2029 (TBD)
Option Year 3 Beginning March 2029 until March 2030 (TBD)
Option Year 4 Beginning March 2030 until March 2031 (TBD)
Extended Option Year (if applicable NOT to exceed 6-months; TBD)
2.0. Exhibit(s) A through E. Cooling Towers Monthly Chemical Treatments
Exhibit A. Axial Fan, Forced Draft Cooling Tower Systems:
See Table 1. Axial Fan, Forced Draft Cooling Towers 1 and Cooling Tower 2.
Exhibits B. Centrifugal Fan Closed Glycol Circuit Tower System:
See Table 1. Centrifugal Fan Closed Glycol Circuit Tower and Water Treatment
Chemical Containers Placement
Exhibit C. Induced Draft Tower System:
See Table 1. Induced Draft Tower and Water Treatment Chemical Containers
Placement
Exhibit D. Water Treatment Chemical Placement (Tower 1):
See Table 1. Cooling Tower 1, Water Treatment Chemical Containers Placement
Exhibit E. Water Treatment Chemical Placement (Tower 2):
See Table 1. Cooling Tower 2, Water Treatment Chemical Containers Placement
File details come from the government source that posted it. Updated .