SOW Cooling Tower Monthly Service Revised 19 FEB 26.pdf
PDF 1 MB Posted
- Attached to
- Cooling Tower Maintance Federal contract opportunity
- Solicitation number
- W91RUS26QA021
About this file
This is a Statement of Work (SOW) for monthly on-site water treatment services for four cooling tower systems at the U.S. Army Electronic Proving Ground (EPG) Environmental Test Facility (ETF) in Fort Huachuca, Arizona. The contractor must provide full-service chemical treatments for cooling tower systems consisting of two Baltimore Aircoil Company FXT-211C 300-ton axial fan forced draft towers (600 gallons sump capacity each), one Evapco West LSWE45J12 75-ton centrifugal fan closed glycol circuit tower (150 gallons sump capacity), and one Delta Cooling Towers Inc. T-1501 150-ton induced draft tower (468 gallons sump capacity).
The contractor shall conduct a minimum of one service call per month beginning March 2026 through March 2027, with a base year followed by four optional one-year extension periods and a potential six-month extended option. Services include initial water testing, provision and maintenance of all required chemicals for scale, corrosion, and microbiological fouling control; furnishing and applying biocides; checking, cleaning, and calibrating chemical control equipment; removing empty containers; providing laboratory analysis; cleaning and refilling chemical tanks; cleaning and maintaining chemical pumps and conductivity/pH control equipment; inspecting towers and cleaning strainers; replacing filters; providing online service reporting and data trending; safety training; and one annual cleaning of scale, basins, and distribution nozzles. The contractor must guarantee maintenance of current operating efficiency or provide cleaning at no additional cost. Monthly water treatment reports describing findings and recommendations must be delivered electronically within 24 hours of service completion to USA EPG, 2000 Arizona Street, Fort Huachuca, Arizona 85613. Hours of operation are 0700–1500 Monday through Friday, excluding weekends and federal holidays. The government will provide fully functional chemical feed equipment, personnel for minor daily operations, and equipment replacement or repair based on contractor recommendations. Contractor personnel must meet security requirements and obtain Installation Access Control System (IACS) clearance; the government is not liable for performance delays due to contractor non-compliance with access requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 Site Visit Questions 31 MAR (002).pdf | ||
| Attachment 6 Site Visit Sign in sheet.pdf | ||
| Attachment 1 Page 2 Site Visit Info.pdf | ||
| SF 30 Amendment 2.pdf | ||
| Attachment 1 Page 1 Extension and Site Visit Info.pdf | ||
| SF 30 Amendment 1.pdf | ||
| Attachment 4 Revised SOW 23Mar26.pdf | ||
| Atch 5 Questions and Answers 23 MAR26.pdf | ||
| Amendment 1 Extension and Site Visit Info.pdf | ||
| Attachment 1 Site Visit Info 19Mar.pdf | ||
| Solicitation - W91RUS26QA021 Cooling Tower final.pdf | ||
| Atch 3 FAR 52.204-26 fill in.pdf | ||
| Atch 2 FAR 52.204-24 Need Filled In and Signed-Returned.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) for
Environmental Test Facility (ETF) Cooling Tower
Monthly On-site Water Treatment Service
1.0 Background
1.1 Objectives
1.2 Scope
1.3 Tasks
1.4 Delivery
1.5 Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, GFI)
1.6 Installation Access
1.7 Travel
1.8 Material Requirements
1.9 Place of performance
1.10 Period of performance
Exhibits A thru D Cooling Tower System Figures
1.0. Background. The U.S. Army Electronic Proving Ground (EPG), Environmental
Test Facility (ETF), Fort Huachuca, Arizona utilizes several mechanical draft cooling towers through evaporation of water liberating waste heat extracted from 13 cascade cooling condensers located around the building compound. Each tower is equipped to constantly measure and meter chemicals which maintain critical pH, hardness, alkalinity, and conductivity levels within the systems. Low microbial activity, corrosion, scaling and fouling must be kept within precise parameters.
1.1. Objectives. The EPG ETF, Fort Huachuca, Arizona is soliciting proposal for full-service monthly chemical treatments for four cooling tower systems which are listed in
Table 1. Exhibit(s) A thru E below providing the Contractor data of all Four cooling tower systems that will be covered underneath this contract. Exhibits are annotated separately and are incorporated within statement of work.
Table 1. Cooling Tower Systems Descriptions
Description Manufacturer Model No. Capacity Sump
Capacity
Axial Fan, Forced Draft Cooling Tower (1) Exhibit A.
Baltimore Aircoil Company
FXT-211C 300-ton 600 gallons
Axial Fan, Forced Draft Cooling Tower (2) Exhibit A.
Baltimore Aircoil Company
FXT-211C 300-ton 600 gallons
Centrifugal Fan Closed Glycol Circuit Tower Exhibit B.
Evapco West LSWE45J12 75-ton 150 gallons
Induced Draft Tower Exhibit C.
Delta Cooling Towers, Inc.
T-1501 150-ton 468 gallons
Axial Fan, Forced Draft Cooling Tower (1) Exhibit D.
Exhibit Displays - Cooling Tower 1, Water Treatment Chemical Containers Placement.
Axial Fan, Forced Draft Cooling Tower (2) Exhibit E.
Exhibit Displays - Cooling Tower 2, Water Treatment Chemical Containers Placement.
1.2. Scope. The contractor must meet the following requirements for each of the cooling tower systems listed in above Table 1:
• Conduct initial onsite water testing to determine what treatment is necessary.
• Provide and maintain all chemicals required for general control of scale, corrosion, and microbiological fouling.
• Conduct a minimum of one service call per month beginning TBD March 2026 to TBD March 2027.
• Furnish and apply products to retard scale and corrosion in condensing water system.
• Remove empty chemical containers.
• Furnish and apply biocides as required.
• Check, clean, and calibrate chemical control and feed equipment.
• Check water treatment control equipment.
• Furnish and apply corrosion inhibitor to closed loop(s) (should water loss occur from system(s). Contractor will provide supplemental inhibitor to trat a maximum water loss of 10-percent system capacity).
• Submit written reports describing findings, along with recommendations for any changes required.
• Provide all laboratory analysis of water and necessary technical expertise.
• Clean all and refill chemical tanks.
• Clean and maintain chemical pumps.
• Clean and maintain conductivity and pH control equipment.
• Inspect cooling tower and clean Y strainers.
• Replace any and all filters used in the water treatment systems.
• Provide access to online service reporting, data trending, and operator logs.
• Control of inventory. Storage of chemicals is to be determined.
• Safety training of on-site personnel.
• Guarantee that the present degree of “operating efficiency” of the cooling tower systems listed in table 1 will be maintained while under the contractor program or it will be cleaned at no additional cost to the government.
• One time, annually clean the scale off the cooling towers, clean the basins and distribution nozzles.
1.3. Tasks. The contractor will provide service to the cooling towers in accordance with the statement of work (SOW) located at the Environmental Test Facility (ETF)
Compound.
1.4. Delivery.
• Deliverables: Monthly water treatment reports describing findings, along with recommendations for any changes required. The report can be delivered electronically via email. Report should be delivered within 24-hours of service completion.
• Delivery time: Each month following the monthly service call.
• Delivery location:
Hard copy:
USA EPG
2000 Arizona St Fort Huachuca, AZ 85613
Point-of-Contact will be determined at the time of award. All Government personnel information will be listed, and emails will be provided at time of award.
1.4.1. Deliverable Schedule.
Deliverable Description Quantity/Media Date Completed
1 Water treatment report 1 electronic copy After monthly service
1.5. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, GFI)
The government will provide:
1. Fully functional chemical feed or control equipment.
2. Replace or repair equipment based on contractor recommendations.
3. Personnel to assist in daily minor operations.
1.6. Installation Access. Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements. The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.7. Travel. Not applicable
1.8 Material Requirements Not applicable.
1.9 Place of performance and Hours of Operation: The primary place of performance is Environmental Test Facility Compound, 1337 Arizona Street, Sierra Vista, AZ 85613, areas identified in this SOW. Hours of operations are 0700 – 1500 (7:00AM – 3:00PM), Monday through Friday, except weekends and Federal Holidays.
1.10 Period of performance: Approximate start and end dates will be determined (TBD) March 2026 to March 2027, to include Base and Four Option Years. Period of Performance will include a Base Year and the below stated out-years as options periods. Shall the Government determine additional performance is needed due to fiscal year forecasting requirements or unforeseen events of exercising the option, an extension of service maybe granted. The contractor’s quotation will be evaluated shall services for additional 6-month period be required. Extended option will not extend 6-month period, if applicable:
Base Year Beginning March 2026 until March 2027 (TBD)
Option Year 1 Beginning March 2027 until March 2028 (TBD)
Option Year 2 Beginning March 2028 until March 2029 (TBD)
Option Year 3 Beginning March 2029 until March 2030 (TBD)
Option Year 4 Beginning March 2030 until March 2031 (TBD)
Extended Option Year (if applicable NOT to exceed 6-months; TBD)
2.0. Exhibit(s) A through E. Cooling Towers Monthly Chemical Treatments
Exhibit A. Axial Fan, Forced Draft Cooling Tower Systems:
See Table 1. Axial Fan, Forced Draft Cooling Towers 1 and Cooling Tower 2.
Exhibits B. Centrifugal Fan Closed Glycol Circuit Tower System:
See Table 1. Centrifugal Fan Closed Glycol Circuit Tower and Water Treatment
Chemical Containers Placement
Exhibit C. Induced Draft Tower System:
See Table 1. Induced Draft Tower and Water Treatment Chemical Containers
Placement
Exhibit D. Water Treatment Chemical Placement (Tower 1):
See Table 1. Cooling Tower 1, Water Treatment Chemical Containers Placement
Exhibit E. Water Treatment Chemical Placement (Tower 2):
See Table 1. Cooling Tower 2, Water Treatment Chemical Containers Placement