TE SW23 cmp_maintenance_guide.pdf

PDF 627 KB Posted

Attached to
Base Operations and Maintenance Support (BASOPS) at Rivanna Station
Solicitation number
W91QV119R0012
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0003.pdf PDF
Sample Consent Letter Attachment.docx DOCX document
AMENDMENT 0003 Performance Work Statement Attachment.docx DOCX document
AMENDMENT 0003 Pricing Worksheet Attachment.xlsx XLSX spreadsheet
SITE VISIT ATTENDEES.pdf PDF
AMENDMENT 0003 W91QV119R0012 RIVANNA STATION BASE OPS Q&A.xlsx XLSX spreadsheet
AMENDMENT 0002 EXTENSION.pdf PDF
W91QV1-19-R-0012-0001.pdf PDF
DAVIS BACON HEAVY.pdf PDF
420 RSVA Facility Maintenance Horizontal Attachment.docx DOCX document
TE GR2 Hydroseeding Specs.doc DOC document
TE SWMO&M, OperationsAndMaintenanceNarrative.pdf PDF
TE 45 Energy and Water Goal Attainment Policy.pdf PDF
TE CODES.docx DOCX document
TE DELV.docx DOCX document
403 RSVA Solid Waste Management Attachment.docx DOCX document
TE BS2-Rivanna Station - Master Inventory and PM Schedule - 11-20-2018.xlsx XLSX spreadsheet
TE8_Building_and_Land_Use.xlsx XLSX spreadsheet
404 RSVA Grounds Maintenance Attachment.docx DOCX document
TE U1 RS facilities and water system.pdf PDF
TE GR5 Seed Mixtures.doc DOC document
Performance Work Statement Attachment.docx DOCX document
400 RSVA Facilities Maintenance Instruction Attachment.docx DOCX document
510 RSVA Pest Managment Services Attachment.docx DOCX document
TE 3394 ENG Form 3394.pdf PDF
TE MAP1.pdf PDF
TE CDCCLNRS.xlsx XLSX spreadsheet
TE BS3 - RIVANNA STATION Building list.docx DOCX document
DAVIS BACON RESIDENTIAL.pdf PDF
DAVIS BACON BUILDING.pdf PDF
TE HT4 Tank Activity Permit.pdf PDF
TE SW18 Fort Belvoir Policy 73 Stormwater Pollution Prevention Plan Requirements.pdf PDF
402 RSVA Custodial Services Attachment.docx DOCX document
408 RSVA Pavement and Hardstand Clearing Attachment.docx DOCX document
TE NLEB.pdf PDF
TE GR4 Sod Specifications.doc DOC document
W91QV119R0012.pdf PDF
TE-SN1, 2017-18 SNAIR Priority Map number 2.pptx PPTX presentation
TE RUNL Visible Emissions Log-NGIC.PDF PDF
TE HT6 Record of Drainage of Secondary Containment.pdf PDF
TE TC1 (AST tank closure VA requirements).docx DOCX document
TE T2 (UST Inspection Form).docx DOCX document
TE CUT.pdf PDF
TE GFE.xlsx XLSX spreadsheet
TE 14.pdf PDF
Staffing Matrix Attachment.xlsx XLSX spreadsheet
TE BMP1 Above Ground Storage Tanks.pdf PDF
TE GR3 Landscaping Reqs.doc DOC document
TE BS1 BASOPS Inventory.xlsx XLSX spreadsheet
TE SW13 ISW.docx DOCX document
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contech® CMP Detention & Infiltration Maintenance Guide

ENGINEERED SOLUTIONS

CMP DETENTION SYSTEMS

2 3

Contech® CMP Detention

Underground stormwater detention/infiltration and retention systems must be properly inspected and maintained at regular intervals for purposes of performance and longevity.

Inspection Inspection is the key to effective maintenance and is easily performed. Contech recommends ongoing quarterly inspections.

The rate at which the system collects pollutants will depend more heavily on site specific activities rather than the size or configuration of the system. Inspections should be performed more often in equipment washdown areas, in climates where sanding and/or salting operations take place, and in various other instances in which higher accumulations of sediment or abrasive / corrosive conditions may exist. Inspection and maintenance records should be maintained for the life of the system.

Maintenance

Systems should be cleaned when inspection reveals that accumulated sediment or trash is clogging the discharge orifice.

Accumulated sediment and trash can typically be evacuated through the manhole over the outlet orifice. If maintenance is not performed as recommended, sediment and trash may accumulate in front of the outlet orifice. Manhole covers should be securely seated following cleaning activities. Contech suggests that all systems be designed with an access/inspection manhole situated at or near the inlet and the outlet orifice. Should it be necessary to get inside the system to perform maintenance activities, all appropriate precautions regarding confined space entry and OSHA regulations should be followed.

If inspectors observe any salt or other corrosive substance concentrations or accumulations in the system, or if salt or other corrosive substance is used or prevalent near the system, it is recommended to rinse the system above the spring line annually between late spring and early summer as part of the maintenance program. This maintenance is required for infiltration systems.

Excessive salting should be avoided and pavement should be sealed to reduce salt infiltration from the surface.

Maintaining an underground detention or retention system is easiest when there is no flow entering the system. For this reason, it is a good idea to schedule the cleanout during dry weather.

The foregoing inspection and maintenance efforts help ensure underground pipe systems used for stormwater storage continue to function as intended by identifying recommended regular inspection and maintenance practices. Inspection and maintenance related to the structural integrity of the pipe or the soundness of pipe joint connections is beyond the scope of this guide.

2 3

Inspection & Maintenance Log Sample Template

__________” Diameter System Location: Anywhere, USA

Date Depth of Sediment

Accumulated Trash

Maintenance Performed

Maintenance Personnel

Comments

12/01/10 2” None Removed Sediment B. Johnson Installed

03/01/11 1” Some Removed Sediment and Trash B. Johnson Swept parking lot

06/01/11 0” None None

09/01/11 0” Heavy Removed Trash S. Riley

12/01/11 1” None Removed Sediment S. Riley

04/01/12 0” None None S. Riley

04/15/01

Some Removed Sediment and Trash ACE Environmental

Services

SAMPLE

Support Drawings and specifications are available at www.ContechES.com.

Site-specific support is available from our engineers.

©2016 Contech Engineered Solutions LLC

Contech Engineered Solutions LLC provides site solutions for the civil engineering industry. Contech’s portfolio includes bridges, drainage, sanitary sewer, stormwater, earth stabilization and wastewater treatment products. For information, visit www.ContechES.com or call 800.338.1122.

NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS A WARRANTY. APPLICATIONS SUGGESTED HEREIN ARE DESCRIBED ONLY TO HELP READERS MAKE THEIR OWN EVALUATIONS AND DECISIONS, AND ARE NEITHER GUARANTEES NOR WARRANTIES OF SUITABILITY FOR ANY APPLICATION. CONTECH MAKES NO WARRANTY WHATSOEVER, EXPRESS OR IMPLIED, RELATED TO THE APPLICATIONS, MATERIALS, COATINGS, OR PRODUCTS DISCUSSED HEREIN. ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY CONTECH. SEE CONTECH’S CONDITIONS OF SALE (AVAILABLE AT WWW.CONTECHES.COM/COS) FOR

MORE INFORMATION.

The product(s) described may be protected by one or more of the following US patents: 5,322,629; 5,624,576; 5,707,527; 5,759,415; 5,788,848; 5,985,157; 6,027,639; 6,350,374; 6,406,218;

6,641,720; 6,511,595; 6,649,048; 6,991,114; 6,998,038; 7,186,058; 7,296,692; 7,297,266; related foreign patents or other patents pending.

800.338.1122 www.ContechES.com

ENGINEERED SOLUTIONS

CMP DETENTION SYSTEMS

CMP Maintenance Guide PDF 6/16