TE GR4 Sod Specifications.doc

DOC document 35 KB Posted

Attached to
Base Operations and Maintenance Support (BASOPS) at Rivanna Station
Solicitation number
W91QV119R0012
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0003.pdf PDF
Sample Consent Letter Attachment.docx DOCX document
AMENDMENT 0003 Performance Work Statement Attachment.docx DOCX document
AMENDMENT 0003 Pricing Worksheet Attachment.xlsx XLSX spreadsheet
SITE VISIT ATTENDEES.pdf PDF
AMENDMENT 0003 W91QV119R0012 RIVANNA STATION BASE OPS Q&A.xlsx XLSX spreadsheet
AMENDMENT 0002 EXTENSION.pdf PDF
W91QV1-19-R-0012-0001.pdf PDF
DAVIS BACON HEAVY.pdf PDF
420 RSVA Facility Maintenance Horizontal Attachment.docx DOCX document
TE GR2 Hydroseeding Specs.doc DOC document
TE SWMO&M, OperationsAndMaintenanceNarrative.pdf PDF
TE 45 Energy and Water Goal Attainment Policy.pdf PDF
TE CODES.docx DOCX document
TE DELV.docx DOCX document
403 RSVA Solid Waste Management Attachment.docx DOCX document
TE BS2-Rivanna Station - Master Inventory and PM Schedule - 11-20-2018.xlsx XLSX spreadsheet
TE8_Building_and_Land_Use.xlsx XLSX spreadsheet
404 RSVA Grounds Maintenance Attachment.docx DOCX document
TE U1 RS facilities and water system.pdf PDF
TE GR5 Seed Mixtures.doc DOC document
Performance Work Statement Attachment.docx DOCX document
400 RSVA Facilities Maintenance Instruction Attachment.docx DOCX document
510 RSVA Pest Managment Services Attachment.docx DOCX document
TE 3394 ENG Form 3394.pdf PDF
TE MAP1.pdf PDF
TE CDCCLNRS.xlsx XLSX spreadsheet
TE BS3 - RIVANNA STATION Building list.docx DOCX document
DAVIS BACON RESIDENTIAL.pdf PDF
DAVIS BACON BUILDING.pdf PDF
TE HT4 Tank Activity Permit.pdf PDF
TE SW18 Fort Belvoir Policy 73 Stormwater Pollution Prevention Plan Requirements.pdf PDF
402 RSVA Custodial Services Attachment.docx DOCX document
TE SW23 cmp_maintenance_guide.pdf PDF
408 RSVA Pavement and Hardstand Clearing Attachment.docx DOCX document
TE NLEB.pdf PDF
W91QV119R0012.pdf PDF
TE-SN1, 2017-18 SNAIR Priority Map number 2.pptx PPTX presentation
TE RUNL Visible Emissions Log-NGIC.PDF PDF
TE HT6 Record of Drainage of Secondary Containment.pdf PDF
TE TC1 (AST tank closure VA requirements).docx DOCX document
TE T2 (UST Inspection Form).docx DOCX document
TE CUT.pdf PDF
TE GFE.xlsx XLSX spreadsheet
TE 14.pdf PDF
Staffing Matrix Attachment.xlsx XLSX spreadsheet
TE BMP1 Above Ground Storage Tanks.pdf PDF
TE GR3 Landscaping Reqs.doc DOC document
TE BS1 BASOPS Inventory.xlsx XLSX spreadsheet
TE SW13 ISW.docx DOCX document
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT GR4PRIVATE

SPECIFICATIONS FOR SOD MATERIALS AND INSTALLATION

1.

GENERAL. The Contractor shall conform to the following specifications when performing sod replacement.

2.

SOD SPECIFICATIONS.

2.1

Class of Sod. Sod shall be Commonwealth of Virginia certified turf. Grass species shall be proportional as specified in Technical Exhibit GR3. Sod that has become yellow or moldy from heating will be rejected.

2.2

Thickness of Cut. Sod shall be machine cut to a uniform soil thickness of 3/4 –1 ¼ inch, plus or minus 1/4 inch, at the time of cutting. Measurement for thickness shall exclude top growth and thatch.

2.3

Pad Size. Individual pieces of sod shall be one square yard (18" x 6') in size. Maximum allowable deviation from specified widths and lengths shall be five percent. Broken pads and torn or uneven ends will not be acceptable.

2.4

Strength of Sod Sections. Standard size sections of sod shall be strong enough to support their own weight and retain their size and shape when suspended vertically from a firm grasp on the upper ten percent of the section.

2.5

Time Specifications. Sod shall be harvested, delivered and installed within a period of 36 hours. Sod not transplanted within this period shall be inspected and approved by the COR or designated representative prior to installation.

3.

INSTALLATION OF SOD.

3.1

Moistening the Soil. The soil shall be lightly irrigated immediately prior to laying the sod.

3.2

Starter Strip. The first row of sod shall be laid in a straight line with subsequent rows placed parallel to and tightly against each other. Lateral joints shall be staggered to promote more uniform growth and strength. Care shall be exercised to ensure that the sod is not stretched or overlapped and that all joints are butted tight in order to prevent voids which would cause air drying of the roots.

3.3

Sloping Surfaces. On sloping areas where erosion may be a problem, sod shall be laid with staggered joints and secured by tamping, pegging or other approved methods. Sod shall be installed with the length perpendicular to the slope.

3.4

Watering and Rolling. The Contractor shall water sod immediately after installation to prevent excessive drying during progress of the work. As sodding is completed in any one section, the entire area shall be rolled. It shall then be thoroughly irrigated to a depth sufficient that the underside of the new sod pad and soil immediately below the sod are thoroughly wet. Water is available at the site. The Contractor shall be responsible for providing hoses and other watering devices.

GR4
Page 1 of 1