Attachment #3
CLS - 408
Pavement & Hardstand Clearance (Snow/Ice/Sand/Debris Removal)
10 Jan 2019
Table of Contents
| 1.0 | General Information | 4 |
| 1.1 | Overview | 4 |
| 1.2 | Snow and Ice Removal Plan | 4 |
| 2.0 | Description of Services | 5 |
| 2.1 | Scope | 5 |
2.1.1 Paved Roads/Access Control Points (ACP)………………………………………………….5
2.1.2 Parking Areas……………………………………………………………………….5
2.1.3 Child Development Center……………………………………………………..…...6
| 2.1.4 | Sidewalks………………………………………………………………………………….6 |
| 2.1.5 | Snow Shoveling and Ice Removal………………………………………………………6 |
| 2.1.6 | Catch Basins……………………………………………………………………………….6 |
| 2.1.7 | Dumpsters………………….…………………………………………………………….6 |
| 2.1.8 | HVAC Clearing………………………………………………………………………….6 |
| 2.1.9 | Sand or Snow Stockpile Removal…………………………………………………………6 |
2.1.10 Earthen Dam……………………………………………………………………………….6
2.1.11 Hydrants……………………………………………………………………………………6
| 2.2 | Removal Priorities…………………………………………………………………………..6 |
| 2.3 | Pre/Post-Treatment and Clearing…………………………………………………………7 |
| 2.3.1 | De-icing (Pre/Post-Treatment) Material/Sand/Salt……………………………………….7 |
| 2.3.2 | Ice Control Abrasives……………………………………………………………………..7 |
| 2.4 | De-icing Supplies……………………………………………………………………………7 |
2.4.1 Sand/salt Barrels……………………………………………………………………………7
| 2.4.2 | On-Call De-icing Materials……………………………………………………………….8 |
| 2.5 | Pavement Sweeping…………………………………………………………………………8 |
| 2.6 | Safety……………………………………………………………………………………….8 |
2.7 Maximum Accumulations……………………………………………………………………8
2.7.1 Completion Criteria……………………………………………………………………..8
1.0 General Information.
1.1 Overview. The Contractor shall provide pavement clearance services, to include street sweeping and snow and ice removal services, on all paved driving/parking areas and side streets, as annotated on Technical Exhibit (TE) SN1. Services shall commence when snow height is two inches or above, or when ice/slippery conditions occurs in accordance with (IAW) the installation’s Snow and Ice Removal Plan from the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). Historically, there have been roughly six (6) snow storm events per year that required activation of the Snow and Ice Removal Plan. Follow-up service shall continue as weather conditions dictate. Storm classification will be determined by the COR/ACOR based on snowfall accumulation projections from the locale weather channel/website (NBC 29) and the National Weather Service.
Snow/ice storms are classified as follows:
· Class A: Spot-Treating/Spot Snow removal on compound, all pavements, walks and steps. Spot treating is per every 250 LF of walks/steps, and per every 1,000 SF of pavement.
· Class B: Pre-Treatment of Compound and all pavements, walks, and steps. Storms causing slippery conditions including accumulations up to two (2) inches. Sidewalks and steps will be cleared of snow and ice as needed. No snow removal of parking lots and/or roads is included in the event.
· Class C: Pre-Treatment of Compound and all pavements, walks, and steps. Storms causing slippery conditions including accumulations up to two (2) inches. Sidewalks and steps will be cleared of snow and ice as needed. No snow removal of parking lots and/or roads is included in the event.
· Class D: Storms with accumulations of two (2) inches up to five (5) inches
· Class E: Storms with accumulations of five (5) inches to eight (8) inches
· Class F: Storms with accumulations of eight (8) inches or more accumulation
1.1.2 Historically, RSVA experiences four (4) to five (5) Class A storms and three (3) Class B storms, and one (1) Class C storms annually. Additionally, within the past eight (8) years RSVA has experienced three (3) snow storm events with accumulation between 12 and 28 inches with the most recent having Virginia being classified in a state of emergency.
1.2 Snow and Ice Removal Plan. The Contractor shall refer to the provided Snow and Ice Removal Priority Map, TE SN1, and develop a Snow and Ice Removal Plan within sixty (60) days of contract award for approval by the COR. The Contractor shall update the Snow and Ice Removal Plan no later than (NLT) 30 September annually. The Contractor's plan shall include the following: an inventory of materials for snow and ice removal; traffic and parking control procedures and communication channels and priorities between road users, the snow control center, and equipment operating crews; designated areas from which snow shall be hauled when accumulation reaches an established level; and procedures for adding additional crews and equipment in the event of a major incapacitating storm.
2.0 Description of Services.
2.1 Scope. Pavement clearance includes, but is not limited to, the following: plowing and or sweeping of sand or snow from roads, access control points (ACP), a Child Development Center (CDC), the Nicholson Building, the Rowe Building, a Remote Delivery Facility, parking areas, sidewalks and steps by pushing, shoveling and piling the snow into adjacent areas, or by collecting and removing sand. It is the full responsibility of the tenant to clear snow up to 50 feet from the building structure. The Contractor shall begin removal of snow and ice from areas identified in TE SN1 when snow accumulations have reached two (2) inch or within two (2) hours of notification by the COR/ACOR. Sand or snow shall be cleared from all walkways, steps, loading docks, doorways and gates to provide full opening and safe access for personnel and equipment. No sand or snow piles shall be left in the plowed/swept areas. A regenerative air sweeper for conducting street sweeping is required to maintain permit compliance. The regenerative air sweeper employs a blast and suction effect to collect street debris in a closed system. The use of blowers for removal of street debris is prohibited. Use of any equipment other than the regenerative air sweeper will result in a violation and the Contractor will be responsible for all penalties assessed by Virginia Department of Environmental Quality for noncompliance. Sand, ice, or snow shall be cleared from all walkways, steps, doorways and gates to provide full opening and safe access for personnel and equipment. No sand or snow piles shall be left in the plowed/swept areas.
2.1.1 Paved Roads/Access Control Points (ACP). The Contractor shall clear roads and ACPs IAW TE SN1. The Contractor shall clear primary roads to support the safe movement of emergency vehicles. Regardless of storm intensity, the Contractor shall ensure the RSVA main gate is operational at all times. The Contractor shall deploy those assets necessary to ensure the RSVA road network is trafficable. Once snow removal operations commence, the Contractor shall continue these operations until snow is removed from the full width of streets, including intersections.
2.1.2 Parking Areas. The Contractor shall clear parking areas IAW TE SN1. Snow shall be removed from the full width of parking areas and pushed to designated locations. No snow shall be plowed into handicapped parking spaces. The Contractor shall apply a mixture of sand and salt to parking lots to reduce the hazards of refreezing. The Contractor shall not apply sand to any parking lots having any type pervious pavements.
2.1.3 Child Development Center. Snow and ice shall be removed from the parking lot, all sidewalks around the building (all sides) and parking lot, and steps. No snow shall be plowed into the CDC parking lot.
2.1.4 Sidewalks. The Contractor shall clear all sidewalks and steps on the RSVA compound. Regardless of the depth, sidewalks and steps shall receive a complete clearing and salting/sanding or de-icing material at the end of each snowstorm if slippery conditions exist or provide a post treatment. The Contractor shall conduct a site visit and verify access and condition of the sidewalks and impacted areas.
2.1.5 Snow Shoveling and Ice Removal. Ice melts (salt) shall be placed on all stairs and sidewalks for each building, as annotated in TE SN1. The Contractor shall not apply any deicing agent containing urea or other forms of nitrogen or phosphorus to stairs or sidewalks.
2.1.6 Catch Basins. Snow shall be removed from all catch basins to allow free drainage. The basins shall be cleared at the end of each snowstorm. The Contractor shall conduct a site visit to verify location of catch basins per TE SN1.
2.1.7 Dumpsters. The Contractor shall remove snow from and around the dumpsters to allow for pedestrian access to dispose of refuse. The Contractor shall clear access to dumpsters at the end of each snowstorm.
2.1.8 HVAC Clearing. The Contractor shall ensure HVAC units are kept clear of snow and ice and all control panels are accessible from all sides. This shall be accomplished by means other than plowing (e.g., snow blowing or hand shoveling).
2.1.9 Sand or Snow Stockpile Removal. When specifically authorized by the COR, the Contractor shall remove snow or sand stockpiles to designated on-post locations identified in TE SN1.
2.1.10 Earthen Dam, Building 2013. The Contractor will ensure access to the concrete riser and emergency drain valve is available at all times. This for emergencies for any unforeseen need to drain down the storm water collection pond at any time.
2.1.11 Hydrants. All snow shall be removed from the hydrants so they may be easily accessible. The cleared area shall be approximately six (6) feet wide around the hydrant. The hydrants shall be cleared at the end of each snowstorm. See TE H1 for locations.
2.2 Removal Priorities. The priority of snow removal shall be IAW TE SN1. The Contractor shall be prepared to perform simultaneous snow removal operations for the main gate entrance, primary road system, and the CDC. The other tenant facilities will be on priority two, unless directed by the COR for a specific event. The Contractor shall continue snow removal operations in order to ensure that during the course of the snowstorm the snow accumulation does not exceed one inch on primary and two inches secondary roads.
2.3 Pre/Post-Treatment and Clearing. The Contractor shall ensure safe walking and driving conditions by immediately removing ice from accumulated areas as identified in TE SN1. The Contractor shall coordinate with the COR to pre-treat areas with de-icing material, salt and/or sand, prior to forecasted storms. The Contractor shall apply a salt/sand or salt-brine solution to roads, parking lots, and sidewalks as pre-treatment before a snow or ice event. The Contractor shall apply the same salt/sand or salt-brine solution to roads, parking lots, and sidewalks as post-treatment after a snow or ice event, as directed by the COR. The Contractor shall remove and dispose of excess accumulations of de-icing material, if applicable, off Government property. These mixtures will be applied per manufacturer’s recommendations for concentration and ambient conditions such as air temperature and relative humidity. All products will be applied at rates recommended by the manufacturer of the brine making equipment and of the manufacturer of any additives.
2.3.1 De-icing (Pre/Post-Treatment) Material/Sand/Salt. The use of sand, salt, or a mixture thereof shall be used IAW local regulations and local policy. The Contractor shall ensure all materials used are in compliance with local procedures and is acceptable to the COR. The allowable amount of material passing a No. 200 sieve as determined by American Association of State Highway and Transportation Officials (AASHTO) -T11, Standard Method of Test for Materials Finer Than 75-μm (No.200) in Mineral Aggregates by Washing, shall not exceed 10% by weight. The maximum particle size for sand borrow shall be M1.04.0 Type A, one-fourth inch (¼”). At the end of the Snow Removal Season, the Contractor shall remove all excess sand from sidewalks and parking lots. No other materials shall be used without the COR/ACOR authorization.
2.3.2 Ice Control Abrasives. The Contractor shall apply abrasives for ice control as directed by the COR. Abrasives shall consist of treated salt which shall be treated with an Environmentally Preferred Product (EPP). Below 20°F the mixture may consist of two (2) parts treated salt to one (1) part sand. In areas of plant root sensitivity (as designated by the COR), chemical abrasives are to be applied at rates and in a manner that will not result in soil/root toxicity and plant decline. Salt/Sand material used at/near the CDC will be human and animal safe.
2.4 De-icing Supplies. The Contractor shall ensure there are sufficient sand/salt mixture available locally to treat each storm event on Rivanna Station (RS). There is no available area or facility on RS to stockpile salt/sand.
2.4.1 Sand/salt Barrels. The Contractor shall provide, maintain, and place sand barrels with weather protective lids. The Contractor shall be responsible for all tools, equipment, and sand/salt required. The COR shall approve the sand barrels prior to placement and will approve the location for each barrel/container to be placed. The Contractor shall keep the barrels ¾ full of sand throughout the winter season. The Contractor shall replace or repair any damaged barrels or lids within 24 hours and notification by the contracting officer representative. The Contractor shall keep the area in and around the sand barrels clean. The Contractor will dispose of all trash and debris found in those areas. Sand barrels shall not be placed prior to the first weather forecast of snow or ice event and shall be removed within five (5) days after COR/ACOR notification to remove. Sand barrels shall contain a tool or scoop for the individual application of sand. These sand/salt barrels are for Contractor staff and RS Government Workforce to use as needed for pre/post-treatment of adjacent walks and steps.
2.4.2 On-Call De-icing Materials. Parking lots and sidewalks shall be de-iced as an on-call requirement. The application shall be a complete coverage of the parking area.
2.5 Pavement Sweeping. No later than three working days after completion of snow and ice removal, the Contractor shall sweep the pavement areas referenced in TE SA2 using a vacuum sweeper. As specified in the MS4 Permit, Chesapeake Bay Total Maximum Daily Load Actions Land, a regenerative air sweeper for conducting street sweeping is required to maintain permit compliance. The regenerative air sweeper employs a blast of air and suction effect to collect street debris in a closed system. The use of blowers for removal of street debris is prohibited. Use of any equipment other than the regenerative air sweeper, will result in a violation of the Fort Belvoir MS4 Permit and the Contractor shall be responsible for all penalties assessed by the Virginia Department of Air Quality for noncompliance with the MS4 permit. Areas to be swept include, but are not limited to: paved streets, parking areas and sidewalks. The Contractor shall give particular attention to porous concrete parking areas. The Contractor shall handle, store, and dispose of debris, trash, and waste in accordance with applicable Federal, State, and Local statutes and regulations.
2.6 Safety. Snow removal equipment that is slow moving or otherwise creates an unsafe condition shall be clearly visible to oncoming traffic and bystanders (e.g., equipped with rotating or flashing amber lights). Contractor personnel performing snow removal working on or adjacent to roadways shall be equipped with reflective vests. Contractor personnel acting as road guides shall be equipped with reflective vests and shall carry an 18-inch square flag of reflectorized material, yellow-orange in color. During hours of darkness, road guides shall also be equipped with a red light capable of being seen by approaching motorists from a distance of at least 200 yards. Guides shall be instructed in the correct method of rendering hand signals.
2.7 Maximum Accumulations. The Contractor shall continue snow removal operations in order to ensure that during the course of the snowstorm the snow accumulation does not exceed one inch on primary and secondary roads, and two inches on all other roads.
| 2.7.1 Completion Times. The Contractor shall cease snow removal activities no earlier than when the snowfall has ended and all areas for which the Contractor is responsible have been cleared and sanded. The Contractor shall ensure that snow removal/ice control services are completed within the following time frames after the storm has ended:CLASS OF STORM |
| COMPLETION TIMES (HOURS) |
| FOR ROADS |
| FOR PARKING AREAS |
| Class A |
| 3 |
| 4 |
| Class B |
| 3 |
| 4 |
| Class C |
| 4 |
| 5 |
| Class D |
| 6 |
| 7 |
| Class E |
| 7 |
| 8 |
| Class F |
| 10 |
| 12 |
2.7.2 Completion Criteria. Snow removal will be considered complete, for streets, parking areas, and sidewalk areas, when the following conditions have been met:
(1) Less than 1/2 inch of snow remains on the entire area, including hard-packed snow or snow and ice.
(2) Snow is removed from the full width of streets, sidewalks, and steps with no intervening snow at street intersections or parking area entrances to all buildings.
(3) Snow has been removed from the full width of parking areas and pushed to designated locations.
(4) Salt has been applied to all roads, parking areas, sidewalks and steps.
(5) The Contractor has cleared melting snow or ice for three days after storm.