EXHIBIT ABC.doc
DOC document 424 KB Posted
- Solicitation number
- W91364-10-R-2000
About this file
RFP - EXHIBIT ABC
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: WATER DISTRIBUTION SYSTEM LOOP, RFP W91364-10-R-0004
SOURCE SELECTION SENSITIVE WHEN COMPLETED
EXHIBIT A - PERFORMANCE RELEVANCY QUESTIONNAIRE
PART I: Prepare five (5) to ten (10) of these documents.
Provide the following information requested in this format for each of the five - ten projects/contracts being described. Projects may be either commercial or Governmental and may be ongoing. They cannot have been completed any earlier than 5 years from the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.
A. Offeror Name (Company/Division):
B. Project/Contract Title:
C. Contract Specifics:
1. Contract Number
2. Contract $ Value:
a. Original Value
b. Current Value
c. Final Contract $ Value
3. If amounts in 3 above are different, provide a brief description of the reason:
4. Description of Effort as Prime or Subcontractor
5. Completion Date:
a. Original Date:
b. Current Schedule:
c. Estimate/Final Completion Date:
6. Primary cause for Contract Modifications:
D. Provide detailed description of the work performed under contract to include but not limited to similarity of these project tasks, e.g. : Construction of interior walls, installation of lighting fixtures, installation of radiant heating fixtures, installation of fuel source for heating system, window removal and replacement, closure and repair of any roof penetrations, installation of electrical fixtures, service and distribution system, repair of south side building dock, installation of safety rail on exterior dock, removal and replacement of gutters, installation of exterior lighting, replacement of exterior doors, and demolition of interior walls, piping, and misc. electrical components; overall facility size, e.g. buildings approximately 25,000 SF to 40,000 SF in size; project scope e.g. similar types of facility construction such as administrative, classrooms/meeting rooms, supply/storage areas, maintenance areas, etc.; cost magnitude and complexity of work; e.g., $1 Million to $5 Million in overall project scope; complexity compared to that required for the proposed effort.
In addition address the following:
1. Describe the specific elements of the work performed by your firm.
2. If you intend to use any of the same key personnel from the referenced project on this solicitations' project; indicate by name and position those personnel occupied on the referenced contract. (e.g., Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation's contract.
3. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)
4. Indicate what elements of work were performed by your major subcontractors.
5. If you intend to use these subcontractors please list name and principal areas of work they will perform.
6. Address any technical areas about the referenced project you consider uniquely relevant to this project.
The following apply to weighting relevancy considering all the elements listed above:
1.) VERY RELEVANT -Past/present performance efforts may have involved the magnitude of effort and complexities essentially the same as required in this solicitation;
2.) RELEVANT - Past/present performance efforts may have involved a lesser magnitude of effort and complexities, including some of those required by this solicitation;
3.) SEMI-RELEVANT - Past/present performance efforts may have involved much less magnitude of effort and complexities, some of those required by this solicitation;
4.) NOT RELEVANT - Past/present performance efforts may have involved none or significantly less magnitude of effort and complexities, compared to those required by this solicitation; and 5.) NEUTRAL - Offeror’s, who otherwise have satisfactory performance on previous construction projects, may be rated "neutral" if those projects are not considered relevant to the proposed acquisition and relevancy cannot be obtained through key personnel, key subcontractor personnel. Projects that are not current will not be considered in the evaluation. Relevancy may affect an offeror's overall Past Performance rating.
E. List Point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired. (Even though you will be sending Exhibit C letters and questionnaires to theses references, do not include a copy of the Exhibit C’s in your proposal.)
End of Part 1-Questionnaire Requirements -Prepare and send Exhibit C Package to the reference(s) for each of these projects.
PART 2: Provide the following offeror non-project specific information. This information need only be provided once in your submission package.
A. Applicable to all offeror’s - Describe your Compliance with the requirements of FAR clause 52.219-8, Utilization of Small Business Concerns (Oct 2000). (Even if you are a Small or Small Disadvantaged Business this clause in Federal Contracts applies. It is the policy of the United States that Small Business concerns, Veteran-owned Small Business Concerns, Service-disabled Veteran-owned Small Business Concerns, HUB Zone Small Business Concerns, Small Disadvantaged Business Concerns, and Women-owned Small Business Concerns shall have the maximum practicable opportunity to participate in performing contracts awarded by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. (FAR Clause 52-219-8) Describe the methods you have used to comply with this policy on prior federal contracts? Include any evidence, or a point of contact to verify this information, if available.
B. Applicable to large businesses offeror’s only - Discuss Compliance with Small Business Subcontracting Plan requirements (FAR 52.219-9) on previous federal contracts, if applicable. For each contract, state if a Small Business or Disadvantaged Business Plan or goal was required. If so, identify in terms of a percentage the planned versus achieved goal during the contract. Provide contract number, Point of Contact (POC) and current phone number or email address for POC for verifying data.
C. Assessment of liquidated damages on any contracts within the last five years. (frequency, circumstances, severity of problem, etc.)
D. Offeror’s are strongly encouraged to include with their proposals information on problems encountered on relative projects and the specific corrective actions taken to remedy the problems.
E. Other Past Performance Considerations Information, if provided, shall be limited to the period starting 5 years prior to the solicitation release date.
a. Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).
b. Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations. Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).
Note to Offeror’s: This form will only be used when you are providing subcontractor information to satisfy relevancy due to a lack of offeror past performance.
EXHIBIT B -SUBCONTRACTOR INFORMATION AND CONSENT FORM
Subcontractor and/or Teaming Partner Consent for the Release of Past Performance and Reference Information to the Prime Contractor.
Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor's or teaming partner's consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted to the offering contractor for submission with past performance volume.
_________ (Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal No. W91364-10-R-0004 for the "DESIGN/BUILD WATERLINE, RAE” construction project issued by the USPFO FOR OHIO, AGOH-PF-PC, 2811 West Dublin Granville Road, Columbus, Ohio 43235. We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.
(Signature) (Title of Individual with authority to sign for and legally bind the company)
Please provide the following information:
1. Your Company Name:
2. Company address:
3. City / State / Zip code:
4. Point of Contact and phone/fax numbers
4. Reference List required with the following for each project:
a. Contract No. And Title:
b. Describe your role (Prime or Sub) and work performed
c. Reference POC: Name, Phone, and Fax
d. POC Email address:
EXHIBIT C PACKAGE INFORMATION AND FORMS
Instructions to Offeror for sending Reference Questionnaire Forms: Prepare and submit to the owners of the projects listed in your Exhibit A "Performance Relevancy Questionnaires", a Reference Package (Exhibit C). For Government contracts, send to Contracting Officer or Technical Representative. For commercial references send to personnel with duties similar to those for Government contracts. Offeror’s should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner. If you have multiple references at one location (Base etc.), send one cover letter and questionnaires for each contract you want a reference for. Your questionnaire package should contain the following:
Cover Letter (See SAMPLE) (Exhibit C 1)
Respondent Info Rating Sheets (Exhibit C 2); Offeror should put name in spaces indicated and ensure it is on every page for identification purposes.
It is suggested that you include a pre-addressed stamped envelope to return to Government Contracting Officer.
OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE!!!
OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES
EXHIBIT C 1: SAMPLE TRANSMITTAL LETTER AND PAST PERFORMANCE EVALUATION QUESTIONNAIRE
Your Company Letterhead
Date:
Project Title: DESIGN/BUILD RAE WATERLINE
RFP W91364-10-R-0004
We have listed your firm as a reference for the work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the USPFO FOR OHIO, ATTN: AGOH-PF-PC, 2811 West Dublin Granville Road, Columbus, Ohio 43235. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306 (e) (4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.
Please send your completed questionnaire to the following address to arrive NOT LATER THAN 11 FERUARY 2010. Do not return them to our company.
By mail: USPFO FOR OHIO
AGOH-PF-PC
2811 West Dublin Granville Road
Columbus, Ohio 43235
FAX: 614-336-7304 or DSN 5346-7304 – mark cover sheet with RFP
W91364-08-R-0019 Email (preferred method): elaine.farabee@us.army.mil.
If you have questions regarding the attached questionnaire, require assistance or desire an electronic version of the form, please contact Elaine Farabee 614-336-7430 or email (preferred method) to: elaine.farabee@us.army.mil.
Thank you for your assistance, Signature and Title
(Exhibit C 2) RESPONDENT IDENTIFICATION AND RATINGS (Part I Contractor submitting Proposal fill-in) The following definitions are provided for use by the raters to rate the Offeror’s performance on the referenced project
RATING
Exceptional
| (E) |
| DEFINITION |
Indicates the contractor's performance record within the area of evaluation Exceeded that required by the contract.
| Very Good |
| (VG) |
| Indicates the contractor's performance record within the area of evaluation Met All contractual requirements. |
| Satisfactory |
| (S) |
| Indicates the contractor's performance record within the area of evaluation Met Essentially All contractual requirements. |
| Marginal |
| (M) |
| Indicates the contractor's performance record within the area of evaluation Mel Some of the contractual requirements. However, changes to the contractor's existing processes may be necessary in order to achieve contract requirements. |
| Unsatisfactory |
| (U) |
| Indicates the contractor's performance record within the area of evaluation Failed to Meet the minimum Government requirements. |
| Unknown or Not Applicable |
| (N/A) |
| The question does not apply. No performance record identifiable within the area of evaluation. |
SOURCE SELECTION SENSITIVE WHEN COMPLETED - NOT TO BE RELEASED OUTSIDE GOVERNMENT CHANNELS
Reference is provided for: Company or Firm name
Contract Number or Project Title:
Date of Award/Completion Date:
Location:
Contract Dollar Amount:
Brief Description of work and your role in the referenced contract:
Reference is provided by (name):
Company/Agency:
Business Address;
Telephone Number:
E-Mail Address:
Relationship to Contract: If information above (Part I) is not accurate please indicate
(1) How responsive was the contractor's quality program in identifying, correcting, and preventing initial and recurring contract discrepancies?
REMARKS:
(2) How complete were the contractor's quality procedures and how well do employees follow them?
(3) Adequacy of Submittals. Were Submittals well researched and were materials clearly identified to include substitute products salient material characteristics?
(4) Overall, how would you rate the quality of workmanship for this project?
(5) Rate timeliness in meeting requirements and adhering to contract schedules (delivery/performance), taking into account all excusable delays including cooperation and attention to contract completion efforts.
(6) Did the contractor provide timely notices of delays/schedule revisions and timely status to Government via progress schedule/critical path charts, etc.? Was the project completed in a timely manner?
(7) How well did the contractor mange project, in terms of timely material delivery, accurate and timely submission of submittals, timely payment of subcontracts, and general business practices?
REMARKS:
(8) Rate how well subcontractors/tradesmen were managed and work coordinated. Explain in remarks any subcontracting issues (positive or negative) that impacted the performance of your contract.
(9) Rate the adequacy of the contractor's environmental program, oversight, compliance and management.
(10) Did the contractor provide adequate, competent and qualified, management, key personnel and technical personnel capable of meeting contract requirements throughout the performance period of the contract?
(11) How well did the contractor work independent of Government guidance, oversight and assistance?
REMARKS:
(12) How effective did your contractor's key management personnel support the initial contract startup, management of contingency situation, provide a quality plan, and respond to problems and changes?
(13) How effective was the contractor in meeting Cost/Price performance targets and controlling contingencies (i.e. changes, etc.)?
(14) How flexible, cooperative, and reasonable was the contractor in meeting mission requirements, particularly when faced with short-notice mission changes?
(15) Was the Site manager always present on site when work was performed?
(16) How timely and effective were the contractor's responses to and resolution of technical problems? Did the Site manager have sufficient authority to make decisions or take actions during project performance?
(17) Overall, how would you rate this contractor's business practices, customer relationship, and ability to successfully perform? Did the contractor demonstrate a reasonable and cooperative business relationship with the Government's contract management personnel?
(18) How effective was the contractor's safety program to ensure compliance with federal, state and local regulations? Did the contractor implement and follow their safety plan? Did they run a "safe" jobsite?
(19) Applicable to Federal Contracts -How well did the contractor comply with applicable Federal laws and regulations such as Davis Bacon Act-timely payrolls and compliance, Drug Free Workplace, Environmental Regulations and Use of Recovered Materials, Executive Order 13101?
(20) Applicable to Federal Contracts Only -How well did the contractor comply with Utilization of Small Business Concerns requirements? For Large Businesses: Were Small Business goals met in the Small Business Subcontracting Plan?
(21) How innovative was the contractor in performing the technical aspects of this contract and resolving problems? How well did the contractor respond to and act on customer feedback? (Customer Satisfaction)
(22) How would you rate the Contractor's overall performance?
23) What were the contractor's top documented strengths, if any, in performing the contract requirements?
REMARKS:
(24) What were the contractor's top documented weaknesses, if any, in performing the contract requirements?
REMARKS:
(25) Please Provide Any Additional Information You Feel Is Important and Not Covered Elsewhere:
Thank you for your remarks. Please ensure that you return this questionnaire to USPFO FOR OHIO, AGOH-PF-PC, 2811 West Dublin-Granville Road, Columbus, Ohio 43235, Attn: Elaine Farabee FAX: 614-336-7304 or (preferred) Email: elaine.farabee@us.army.mil Do NOT return to the evaluated contractor.
Request for Proposal Supplemental Information Solicitation No: W91364-10-R-0004 Exhibit G --Provide the following information and submit with your proposal-Volume One Offeror Name Complete Address Point of Contact: Email addresses and phone numbers/fax number Cage Code and DUNS Number
Business Size-Include all that are applicable-explanations/definitions of these can be found in the representations and certifications located at http://orca.bpn.gov. The ORCA site contains an ORCA Application Handbook and an ORCA Quick Reference Guide. To access them, simply click on the "Help" link at the top of the ORCA homepage. Ensure your Central Contractor Registration (CCR) information is up-to-date. Complete annual Representations and Certification on line at http://orca.bpn.gov if you have not already done so.
Information provided below will be used to verify your certifications: ( ) Large Business, ( ) Small Business, ( ) Small Business, ( ) Woman Owned Small Business, ( ) HUB Zone (Certified), ( ) Small Disadvantaged Business, ( ) Certified Section 8(a) Contractor, ( ) Small Veteran Owned Business, ( ) Small Disabled Veteran Owned Business, ( ) Emerging Small Business. (Use NAICS dollar level, not # of employees for construction)
File details come from the government source that posted it. Updated .