CHAPTER 6 FIREPROTECTION TABLES TABLE 6.6.pdf

PDF 11 KB Posted

Attached to
RECOVERY DESIGN/BUILD WATERLINE, RICKENBACKER ARMY ENCLAVE, COLUMBUS, OHIO
Solicitation number
W91364-10-R-2000
Issued by

About this file

capacity study documents - TABLES

View the file

Other files

File Type Posted
Army CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
Army Fig. 3.1.pdf PDF
Report Cover.pdf PDF
Fig. 6.1.pdf PDF
Fig. 6.2.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-TABLE 6.1.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-BB.xls XLS spreadsheet
Fig. 7.1.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.5.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.7.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Exhibit D.doc DOC document
CHAPTER 4 POPULATION TABLES.xls XLS spreadsheet
Report Cover.doc DOC document
MATOC DB Offering Instruction and Evaluation.doc DOC document
CHAPTER 7 SANITARY TABLES TABLE 7.4.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
Table of Contents.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.3.pdf PDF
20-yr LIFE CYCLE.xls XLS spreadsheet
Fig. 3.1.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.5.pdf PDF
Army Fig. 6.2.pdf PDF
Appendix A-Army.pdf PDF
ANG Report-final.pdf PDF
Army report_final.pdf PDF
utility site drawing.TIF TIF image
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.10.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES.xls XLS spreadsheet
utilities.pdf PDF
Army Fig. 7.1.pdf PDF
rae_water_sow.doc DOC document
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.4.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.9.pdf PDF
Responses to draft report Review Comments .pdf PDF
Army 20-yr LIFE CYCLE.xls XLS spreadsheet
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.4.pdf PDF
Army CHAPTER 6 FIREPROTECTION TABLES-BB.xls XLS spreadsheet
EXHIBIT E.doc DOC document
Army CHAPTER 7 SANITARY TABLES-BB.xls XLS spreadsheet
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.3.pdf PDF
Divider Sheets.doc DOC document
CHAPTER 7 SANITARY TABLES.xls XLS spreadsheet
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.1.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.8pdf.pdf PDF
Army Fig. 6.1.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Appendix A - ANG.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE 6.6 PRESENT (2006) FIRE FLOW DEMAND

BUILDING

NUMBER BUILDING DESCRIPTION

NUMBER

OF FLOOR

LEVELS

TYPE OF

BUILDING

MATERIAL

TOTAL FIRE

AREA

TYPE OF

BUILDING

REQUIRED

FIRE FLOW

1 HR

SPRINKLERS

FIRE FLOW UP

TO 75%

REDUCTION

DUE TO

SPRINKLER

SYSTEM

TOTAL

REQUIRED

FIRE FLOW

SQ. FT. GPM GPM GPM

820 FIRE STATION ONE BRICK 19,631 FIRESTATION 1,500 1,500

846 VEHICLE MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 1,500 1,500

849 REFUELER MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 3,000 3,000

CONTRACTING /SUPPLY /TMO OFFICE 1,500 1,500

CONTRACTING /SUPPLY /TMO WAREHOUSE 1,500 1,500

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES ONE STUCCO 40,720 OFFICE 2,250 YES 1,500 1,500

879 DELUGE PUMPS N/A N/A 1,479 N/A 0 0

880 DELUGE TANKS N/A N/A 1,479 N/A 0 0

883 AIRPLANE HANGAR ONE METAL 32,247 HANGAR 3,000 3,000

885 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ TWO MASONRY 36,448 OFFICE 1,500 1,500

888 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

903 POL OPERATIONS ONE BRICK 1,931 OFFICE 1,500 1,500

911 RECRUITING / BASE OPS ONE MASONRY 4,869 OFFICE 1,500 1,500

913 WEATHER FLIGHT / QUALITY ONE BRICK 5,423 OFFICE 1,500 1,500

2000 WING HQ / OPS TWO BRICK 50,188 OFFICE 2,500 YES 1,500 1,500

28,750 27,000

37,952872

TOTAL

MASONRYONE

File details come from the government source that posted it. Updated .