ANG Report-final.pdf

PDF 3 MB Posted

Attached to
RECOVERY DESIGN/BUILD WATERLINE, RICKENBACKER ARMY ENCLAVE, COLUMBUS, OHIO
Solicitation number
W91364-10-R-2000
Issued by

About this file

capacity study documents - ANG

View the file

Other files

File Type Posted
Army CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
Army Fig. 3.1.pdf PDF
Report Cover.pdf PDF
Fig. 6.1.pdf PDF
Fig. 6.2.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-TABLE 6.1.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-BB.xls XLS spreadsheet
Fig. 7.1.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.5.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.7.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Exhibit D.doc DOC document
CHAPTER 4 POPULATION TABLES.xls XLS spreadsheet
Report Cover.doc DOC document
MATOC DB Offering Instruction and Evaluation.doc DOC document
CHAPTER 7 SANITARY TABLES TABLE 7.4.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
Table of Contents.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.3.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.6.pdf PDF
20-yr LIFE CYCLE.xls XLS spreadsheet
Fig. 3.1.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.5.pdf PDF
Army Fig. 6.2.pdf PDF
Appendix A-Army.pdf PDF
Army report_final.pdf PDF
utility site drawing.TIF TIF image
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.10.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES.xls XLS spreadsheet
utilities.pdf PDF
Army Fig. 7.1.pdf PDF
rae_water_sow.doc DOC document
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.4.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.9.pdf PDF
Responses to draft report Review Comments .pdf PDF
Army 20-yr LIFE CYCLE.xls XLS spreadsheet
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.4.pdf PDF
Army CHAPTER 6 FIREPROTECTION TABLES-BB.xls XLS spreadsheet
EXHIBIT E.doc DOC document
Army CHAPTER 7 SANITARY TABLES-BB.xls XLS spreadsheet
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.3.pdf PDF
Divider Sheets.doc DOC document
CHAPTER 7 SANITARY TABLES.xls XLS spreadsheet
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.1.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.8pdf.pdf PDF
Army Fig. 6.1.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Appendix A - ANG.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ohio Air National Guard Base Project NLGZ062005

Page i

WATER AND SEWER CAPACITY STUDY

TABLE OF CONTENTS

Title Page No

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION 3

2.1 Purpose 3

2.2 Scope of Work 3

3.0 EXISTING CONDITIONS 5

3.1 Historical Background 5

3.2 Existing Water Distribution System 5

3.2.1 Description 5

3.2.2 Present Water Use and Cost 5

3.2.3 Problems With Existing Water Distribution System 5

3.3 Existing Sanitary Sewer System 5

3.3.1 Description 5

3.3.2 Problems With Existing Sanitary Sewer System 6

3.4 Recent Studies of Sanitary Sewer System 6

3.4.1 Sewer System Evaluation (Zande) 6

3.4.2 CCTV Work by AETC Environmental, Inc. 7

3.4.3 I/I Study by URS Corporation 7

3.4.4 Studies by M. S. Consultants, Inc. 7

3.4.5 PRIME Base Master Plan 7

3.5 Previous Sanitary Sewer Projects 7

3.6 Jurisdiction for Water Supply and Sewerage 8

4.0 DESIGN POPULATION 9

4.1 Design Period 9

4.2 Existing Facilities and Population 9

4.2.1 Base Population During Regular Working Days 9

and During UTA Weekend

4.3 Current Phase (2005-2010) 10

4.4 Short Range Phase (2010-2015) 11

4.5 Intermediate Range Phase (2015-2020) 12

4.6 Long Range Phase (2020-2025) 13

4.7 Summary Total Base Population Projections 14

5.0 FIXTURE UNIT COUNT 15

5.1 Flow Determination 15

6.0 WATER SYSTEM 16

6.1 Domestic Water Use 16

6.1.1 Design Criteria 16

6.1.2 Effective Population 16

6.1.3 Capacity Factor 16

6.1.4 Design Population 17

6.1.5 Daily Demand 17

Page ii

TABLE OF CONTENTS

(Continued)

6.2 Fire Flow Protection Requirements 17

6.2.1 Fire Flow Requirements for Buildings 18

6.2.2 Fire Fighting Duration 18

6.2.3 Fire Flow Demand 18

6.2.4 Total Water Demand 19

6.3 Peak Domestic Demand 19

6.4 Summary of Water Demands for 2005-2025 19

6.5 Design Water Demand Versus Actual Water Use 20

6.6 Proposed Water Distribution System Improvement 21

6.5.1 Existing Water System Improvements 21

6.5.2 Future Water System Connections 22

6.7 Iron in the Water Supply 23

6.8 Modeling a New Water Distribution Loop 23

6.9 Estimated Costs 24

7.0 SANITARY SEWER SYSTEM 25

7.1 Quantity of Wastewater 25

7.2 General Design Criteria 25

7.3 City of Columbus, Division of Sewerage and Drainage

Design Criteria 25

7.3.1 Average Sanitary Wastewater Flow 25

7.3.2 Peak Sanitary Wastewater Flow 25

7.3.3 Infiltration and Inflow 26

7.3.4 Design Flow 26

7.3.5 Design Capacity 26

7.4 Pipe Size 26

7.5 Existing Sanitary Sewer Repairs/Replacement 27

7.6 Proposed Sanitary Sewer Facility Connections 27

7.7 Estimated Costs 29

8.0 CONSTRUCTION PHASING PLAN 30

9.0 ESTIMATED COSTS 31

10.0 20-YEAR LIFE CYCLE COSTS 34

10.1 Evaluation Period 34

10.2 Water System 34

10.2.1 Estimated Construction Costs 34

10.2.2 Estimated Annual Operations and 34

Maintenance (O&M) Costs

10.3 Sanitary Sewer System 37

10.3.1 Estimated Construction Costs 37

10.3.2 Estimated Annual Operations and 37

Maintenance (O&M) Costs

Page iii

LIST OF FIGURES

Figure 3.1 Development Plan for Air National Guard Figure 4.1 Total Base Population Projections Figure 6.1 Proposed Waterline Improvement Plan Figure 6.2 Water System Loop Concept Design Figure 6.3 Calculated Peak Domestic Demand Figure 7.1 Proposed Sanitary Sewer Improvement Plan Figure 10.1 Water System Costs Over 20 Years Figure 10.2 Water System Maintenance Costs Over 20 Years Figure 10.3 Sanitary Sewer Charges Over 20 Years Figure 10.4 Sanitary Sewer Maintenance Costs Over 20 Years

LIST OF TABLES

Table 3.1 Order of Accomplishment of Projects Table 4.1 Present (2006) Base Population Table 4.2 Current (2005-2010) Base Population Table 4.3 Short Range Phase (2010-2015) Base Population Table 4.4 Intermediate Range Phase (2015-2020) Base Population Table 4.5 Long Range Phase (2020-2025) Base Population Table 4.6 Total Base Population Projections Table 5.1 Building Fixture Unit Counts Table 6.1 Present (2006) Total Water Demand Table 6.2 Current (2005-2010) Water Demand Table 6.3 Short Range Phase (2010-2015) Water Demand Table 6.4 Intermediate Range Phase (2015-2020) Water Demand Table 6.5 Long Range Phase (2020-2025) Water Demand Table 6.6 Present (2006) Fire Flow Demand Table 6.7 Current (2005-2010) Fire Flow Demand Table 6.8 Short Range Phase (2010-2015) Fire Flow Demand Table 6.9 Intermediate Range Phase (2015-2020) Fire Flow Demand Table 6.10 Long Range Phase (2020-2025) Fire Flow Demand Table 6.11 Summary of the Total Water Demands for the Design Period Table 6.12 Actual Water Use Table 6.13 Summary of Water System Facility Connections Table 6.14 TRANSITE Waterline Replacement Costs Table 7.1 Present (2006) Sanitary Flow Table 7.2 Current (2005-2010) Sanitary Flow Table 7.3 Short Range Phase (2010-2015) Sanitary Flow Table 7.4 Intermediate Range Phase (2015-2020) Sanitary Flow Table 7.5 Long Range Phase (2020-2025) Sanitary Flow Table 7.6 Summary of Sanitary Sewers Requiring Replacement Table 7.7 Summary of Sanitary Facility Connections Table 7.8 Summary of Estimated Sanitary Sewer Improvement Costs Table 9.1 Summary of Estimated Improvement Costs Table 9.2 Summary of Estimated Fees and Charges Table 10.1 Water Use Costs Over 20 Years Table 10.2 Water System Maintenance Costs Over 20 Years Table 10.3 Sanitary Sewer Charges Over 20 Years Table 10.4 Sanitary Sewer Maintenance Costs Over 20 Years

Page iv

APPENDICES

Appendix A A-E Statement of Work Appendix B Meeting Minutes Appendix C Summary of Water & Sewer Billings

Water and Sewer Capacity Study Type “A” Concept Design Ohio Air National Guard Project No. NLZG062005

1.0 EXECUTIVE SUMMARY

The Rickenbacker Air National Guard Base (RANGB) has contracted with Prime Engineering &

Architecture, Inc. (PRIME) to perform a water and sewer system capacity study for the purposes of analyzing the existing systems and ascertain their capacity to accept increased water consumption and sanitary flows during RANGB’s proposed expansion over the next 20 years. In the process of planning for future growth and expansion, the Base found it necessary to understand the effect that such growth would have on the existing 60-year old water and sanitary sewer systems.

PRIME’s goal in performing this study was to define current system limitations and evaluate it for future expansion. The methodology included a review of previous Rickenbacker International Airport studies and reports, of which RANGB’s systems are part. The studies’ results yielded valuable information concerning current flow and supply capacities; an understanding of problems with system operation; and knowledge of current system structural integrity.

In this report, PRIME studied and analyzed existing populations for water capacity and demand. This information was compared to the population growth forecast to determine if the existing systems could accommodate the growth. PRIME has determined that, with some system improvements and modifications, RANGB’s existing water distribution and sanitary sewer should be adequate to handle the proposed new construction and future population growth.

PRIME recommends the following repairs and improvements to the water and sanitary sewer systems:

• Replace approximately 2,600 feet of asbestos cement (TRANSITE) water pipe;

• Replace two segments of 15-inch sanitary sewer pipe;

• Rehabilitate the remaining sanitary sewer pipes with cured-in-place pipe (CIPP) lining;

• Initiate a study of the iron problem in the water distribution system and investigate methods to eliminate high iron concentrations in the system.

The total estimated construction cost for performing all the recommended improvements and connecting any new facilities to the water distribution and sanitary sewer systems is $625,000. The required water tap and sewer charges imposed by the local regulatory agencies are summarized in Chapter 9.

Ohio Air National Guard Project No. NLZG062005

Construction phasing for both the water distribution system and sanitary sewer system should proceed as follows:

1. Replace the TRANSITE water distribution system piping with ductile iron pipe (DIP).

2. Replace the two 15-inch sanitary sewer system pipe segments that do not meet Columbus standards.

3. Rehabilitate 2,260 linear feet of 15-inch and 1,430 linear feet of 8-inch sanitary sewer with cured-in-place pipe (CIPP) lining.

4. Install the sanitary laterals as part of the site development phase for each new facility/building.

5. Install the water service taps as part of the site development phase for each new facility/building.

Ohio Air National Guard Project No. NLZG062005

2.0 INTRODUCTION

2.1 PURPOSE

The purpose of this study is to present a water and sewer capacity analysis and investigate improvement of the current systems.

The Rickenbacker Air National Guard Base (RANGB) is in the process of implementing the Master Plan, dated September 2005, prepared by Prime Engineering and Architecture, Inc. The Master Plan is a planning document, which allows for planned growth of the RANGB for the next twenty years. The proposed population growth for RANGB will require new facilities to accommodate this growth. As a result of this expansion and population growth, increased demands for domestic and industrial water needs, fire protection, and consequently, the need for modifications to the existing water distribution system or design of a new water distribution system are anticipated. The same anticipations are true for the sanitary sewer system.

2.2 SCOPE OF WORK

By Delivery Order No. 0054 dated May 11, 2006, The Ohio Air National Guard authorized Prime

Engineering and Architecture, Inc. (PRIME) to provide investigative services for the capacity analysis and infrastructure improvement of the water distribution and sanitary sewer system located on the Ohio

Air National Guard (ANG) cantonment area at Rickenbacker International Airport, Columbus, Ohio.

The Design Statement of Work requires PRIME to provide a report on options for upgrading the systems in accordance with base population, facility changes/improvement and mission profile for the following phase time lines:

1. Current: 0-5 years

2. Short Range: 5-10 years

3. Intermediate Range: 10-15 years

4. Long Range: 15-20 years

The study results will be based on the September 2005 Base Master Plan forecast and include the following:

• Population study for the Base and each Facility

• Current and proposed Fixture Unit Count for each Facility

• Domestic and Fire Protection Requirements for each Facility

• Schematic Drawings for main, secondary, and lateral distribution systems

Ohio Air National Guard Project No. NLZG062005

• Construction phasing plan with cost estimates

• Tap fees, capacity and other charges will be only required for Phase I (Current: 0-5 years)

PRIME is responsible for collecting, analyzing, and documenting information gathered from Federal, State, Local (city, county & municipal) authorities, Columbus Regional Airport Authority (CRAA) and other agencies as required to determine future growth in the area.

The Ohio Air National Guard (OHANG) will provide drawings of the current water and sewer distribution systems, buildings, and any proposed future facilities. Current service is provided by Franklin

County Sanitary Engineer through the City of Columbus Department of Public Utilities, Division of

Water, Sewers & Drains.

Ohio Air National Guard Project No. NLZG062005

3.0 EXISTING CONDITIONS

3.1 HISTORICAL BACKGROUND

The Rickenbacker Air National Guard Base (RANGB) was opened in 1942 initially as the Lockbourne

Army Air Base, and later as Rickenbacker Air Force Base. In 1980, the Air Force closed the base, and subsequently the military operations were downsized considerably. Currently, a large portion of the land area of the former air force base is owned by Columbus Regional Airport Authority (CRAA); RANGB owns 162.98 acres of land; and Army National Guard owns 159.84 acres of land.

3.2 EXISTING WATER DISTRIBUTION SYSTEM

3.2.1 DESCRIPTION

The existing water distribution system comprises a network of 8-inch, 10-inch, 12-inch, and 16-inch pipes made of ductile iron and TRANSITE (asbestos cement) materials. Many appurtenances such as valves are not working properly and leak due to age. Based on the information gathered from the Franklin County

Sanitary Engineer and the City of Columbus Water Department, waterline delivery pressure to the

RANGB water system is 72 psi, according to the latest pressure tests.

3.2.2 PRESENT WATER USE AND COST

Present water demand and usage costs were derived from an IEMS-Water Summary Report covering the period 1 January 2004 to 1 January 2006. Total water usage for this period was found to be 5,728,500 gallons, or 7,638 ccf. The total usage cost for this period was $16,606.96, or $2.17 per ccf.

3.2.3 PROBLEMS WITH EXISTING WATER DISTRIBUTION SYSTEM

• TRANSITE pipes. City of Columbus Division of Water discourages the use of asbestos cement pipes due to environmental considerations and other factors.

• Aged appurtenances.

• Temporary/permanent repairs made in the past to the water line system that may not have been properly implemented could be causing pressure reduction in the system.

• Iron concentrations in the existing water system.

3.3 EXISTING SANITARY SEWER SYSTEM

3.3.1 DESCRIPTION

The existing sanitary sewer system consists of 8-inch and 15-inch vitrified clay sewers. Two sections of

15-inch sewer pipe are made of reinforced concrete. Most of the sewers are laid at minimum grade

Ohio Air National Guard Project No. NLZG062005 according to the Detailed Sectional Map Composite Utilities drawings provided by RANGB. The major part of the system was constructed in the 1940’s. The system is beset with infiltration/inflow (I/I) problems. Age of the system is one of the major causes for many entry points for I/I. Approximately 25% of the total sanitary flow is collected at a sanitary lift station located north of the Army National Guard cantonment area. From there, these flows are directed to the 15-inch trunk line along Zistel Street and gravity fed to the CRAA sanitary system. The other 75% of the total sanitary flow gravity feeds to the

CRAA sanitary sewer system. PRIME investigated the option of installing a new 15-inch sewer from the

OHANG area to a new trunk line that was proposed in an MS Consultants Master Plan for Rickenbacker

International Airport. However, from discussions with MS Consultants, it was learned that the OHANG area was not included in the tributary area calculations when this trunk line was sized. Therefore, PRIME did not pursue this investigation further.

3.3.2 PROBLEMS WITH EXISTING SANITARY SEWER SYSTEM

• Improper sewer slopes and height of cover

• Cracked, broken, or aging pipes

• Infiltration and Inflow

3.4 RECENT STUDIES OF SANITARY SEWER SYSTEM

3.4.1 SEWER SYSTEM EVALUATION BY R.D. ZANDE AND ASSOCIATES, INC.

A sewer system evaluation was conducted by R.D. Zande and Associates (Zande) from May 1993 through September 1993 for a study area that included the entire former Rickenbacker Air Force Base and the Village of Lockbourne. The results were documented in a 1994 report to the Franklin County Sanitary

Engineer.

The Zande report indicated that the sanitary sewers in the study area exhibited excessive rain derived I/I amounting to at least twice the average daily dry weather sanitary sewer flow. This was due to numerous system defects identified in previous reports including possible cross connections to the storm sewer system. The Zande report recommended elimination of the existing excessive inflow and infiltration. The report also cited improper sewer slope is causing slow movement of solids. The report recommended modifications to the sewer system to transport only the allowable I/I by the City of Columbus design criteria.

Ohio Air National Guard Project No. NLZG062005

3.4.2 CCTV WORK PERFORMED BY AETC ENVIRONMENTAL, INC.

AETC Environmental, Inc. performed closed-circuit televising (CCTV) of the existing sanitary sewer system throughout the RANGB area in 1997. The CCTV results indicate deteriorated segments, broken pipes, and I/I in the sanitary sewer system.

3.4.3 I/I STUDY BY URS CORPORATION

In March, 2002, URS Corporation performed an I/I analysis of sanitary sewer CCTV tapes from the

Rickenbacker Airport area for the Franklin County Sanitary Engineer. The OHANG cantonment was included in this analysis. The analysis results showed deteriorated pipe joints, numerous areas of probable infiltration, offset joints, and medium to heavy deposits in the pipe segments.

3.4.4 STUDIES BY MS CONSULTANTS, INC.

A Water and Sanitary Sewer System Development Master Plan is being currently developed by MS

Consultants, Inc. This Plan addresses the future development of the Rickenbacker International Airport area (RIAA), of which the RANGB is a part. The study addresses future development for commercial, industrial, and warehouse type facilities.

The study recommends eliminating as many of the lift stations and sanitary force mains as possible in the

RIAA and replacing them with new gravity flow sewers. The study also recommends installing new water distribution pipes.

3.4.5 PRIME BASE MASTER PLAN

A Base Master Plan was prepared by Prime Engineering & Architecture, Inc. (PRIME) in March 2005.

The Short Range and Long Range Development plan recommends the following items:

• Land acquisition;

• Facilities demolition and construction.

• Auto and pedestrian circulation improvements

• Addition of new parking lots.

Table 3.1 presents the proposed projects to be constructed in the Short Range Plan, Intermediate Range plans, and the Long Range Plan. Figure 3.1 presents the facilities to be constructed in the Short Range, Intermediate Range, and the Long Range Plan.

Ohio Air National Guard Project No. NLZG062005

3.5 PREVIOUS SANITARY SEWER PROJECTS

The 121st Air Refueling Wing/Base Civil Engineering completed rehabilitation work on the existing sanitary system as detailed in a report dated March, 2003. This work included cured-in-place pipe (CIPP) lining of approximately 1,040 linear feet of sanitary sewer and rehabilitating 17 manholes with cementitious lining.

3.6 JURISDICTION FOR WATER SUPPLY AND SEWERAGE

Currently, the Franklin County Engineer’s Office is responsible for maintenance of the respective sewers and water lines. The City of Columbus is likely to assume the responsibility for maintenance of both the sewers and water lines of the cantonment in the future.

Table 3.1 ORDER OF ACCOMPLISHMENT OF PROJECTS

Year Project

1 Joint Vehicle Maintenance 2 New Front Entrance Gate 3 Security Forces 4 CE Storage Barn 5 Gas Station 6 Potential E+I Squadron 7 Land Acquisition 14 acres

2005-2010 Current

1 Addition to POL Operations 2 Mobility Processing / Add-Alter Logistics Facility

2010-2015 Short Range

1 New Operations and Training / Medical Facility

2015-2020 Intermediate

Range

1 Hangar 2 Alert Facility

2020-2025 Long Range

Ohio Air National Guard Project No. NLZG062005

4.0 DESIGN POPULATION

4.1 DESIGN PERIOD

The design period for this study is twenty years comprising the years 2005 through 2025 in accordance with the PRIME Base Master Plan.

4.2 EXISTING FACILITIES AND POPULATION

4.2.1 BASE POPULATION DURING REGULAR WORKING HOURS AND DURING UTA

EVENTS

In accordance with information obtained from the Base Civil Engineer-RANGB in June of 2006, there are

386 nonresident personnel and civilian employees working 8-hour shifts currently at the RANGB. There are no resident military or civilian personnel or family housing. Once a month, during UTA one-day weekend event, base population peaks to 1350 people. Table 4.1 presents a breakdown of the present population by each building.

TABLE 4.1 PRESENT (2006) BASE POPULATION

BUILDING

NUMBER BUILDING DESCRIPTION DAILY

POPULATION

UTA

MAXIMUM

POPULATION

820 FIRE STATION 15 40

846 VEHICLE MAINTENANCE 12 30

849 REFUELER MAINTENANCE 1 2

872 CONTRACTING /SUPPLY /TMO 24 120

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 65 320

879 DELUGE PUMPS 0 0

880 DELUGE TANKS 0 0

883 AIRPLANE HANGAR 9 21

885 AIRPLANE HANGAR 70 246

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 40 145

888 AIRPLANE HANGAR 80 220

903 POL OPERATIONS 7 16

911 RECRUITING / BASE OPS 7 14

913 WEATHER FLIGHT / QUALITY 1 12

2000 WING HQ / OPS 55 164

TOTAL POPULATION 386 1350

Ohio Air National Guard Project No. NLZG062005

4.3 CURRENT PHASE (2005-2010)

According to the Base Master Plan, the following buildings will be constructed inside the Air

National Guard Base at Rickenbacker from 2005 to 2010:

• Joint Vehicle Maintenance

• New Front Entrance Gate

• Security Forces

• CE Storage Barn

• Gas Station

• Potential E + I Squadron

• Land Acquisition- 14 Acres

The resulting Base population is presented in Table 4.2 below.

TABLE 4.2 CURRENT PHASE (2005-2010) BASE POPULATION

BUILDING

NUMBER BUILDING DESCRIPTION DAILY

POPULATION

UTA

MAXIMUM

POPULATION

820 FIRE STATION 15 40

846 VEHICLE MAINTENANCE 0 0

849 REFUELER MAINTENANCE 1 2

872 CONTRACTING /SUPPLY /TMO 24 120

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 65 320

879 DELUGE PUMPS 0 0

880 DELUGE TANKS 0 0

883 AIRPLANE HANGER 9 21

885 AIRPLANE HANGER 70 246

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 40 145

888 AIRPLANE HANGER 80 220

903 POL OPERATIONS 7 16

911 RECRUITING / BASE OPS 7 14

913 WEATHER FLIGHT / QUALITY 1 12

2000 WING HQ / OPS 55 164

JOINT VEHICLE MAINTENANCE 20 50

NEW FRONT ENTRANCE GATE 2 4

SECURITY FORCES 30 145

CE STORAGE BARN 0 0

GAS STATION 0 0

POTENTIAL E + I SQUADRON 8 100

LAND ACQUISITION 0 0

TOTAL POPULATION 434 1619

Ohio Air National Guard Project No. NLZG062005

As projected in Table 4.2, daily population of the Air National Guard Base at Rickenbacker will increase from the present 386 people in 2005 to 434 people in 2010. During this period, the population during the one-day UTA activities will increase from 1350 people to 1619 people.

4.4 SHORT RANGE PHASE (2010-2015)

According to the Base Master Plan, the following facilities will be constructed inside the Air

National Guard Base at Rickenbacker from 2010 to 2015:

• Addition to POL Operations

• Mobility processing

The resulting estimated Base population is presented in Table 4.3 below.

TABLE 4.3 SHORT RANGE PHASE (2010-2015) BASE POPULATION

BUILDING

NUMBER BUILDING DESCRIPTION DAILY

POPULATION

UTA

MAXIMUM

POPULATION

820 FIRE STATION 15 40

846 VEHICLE MAINTENANCE 0 0

849 REFUELER MAINTENANCE 1 2

872 CONTRACTING /SUPPLY /TMO 24 120

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 65 320

879 DELUGE PUMPS 0 0

880 DELUGE TANKS 0 0

883 AIRPLANE HANGAR 9 21

885 AIRPLANE HANGAR 70 246

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 40 145

888 AIRPLANE HANGAR 80 220

903 POL OPERATIONS 7 16

911 RECRUITING / BASE OPS 7 14

913 WEATHER FLIGHT / QUALITY 1 12

2000 WING HQ / OPS 55 164

JOINT VEHICLE MAINTENANCE 20 50

NEW FRONT ENTRANCE GATE 2 4

SECURITY FORCES 30 145

CE STORAGE BARN 0 0

GAS STATION 0 0

POTENTIAL E + I SQUADRON 8 100

LAND ACQUISITION 14 ACRES 0 0

ADDITION TO POL OPERATIONS 0 0

MOBILITY PROCESSING 4 50

TOTAL POPULATION 438 1669

Ohio Air National Guard Project No. NLZG062005

As projected in Table 4.3, daily population of the Air National Guard Base at Rickenbacker will increase from 434 people in 2010 to 438 people in 2015. During this period, the population during the one-day UTA activities will increase from 1619 people to 1669 people.

4.5 INTERMEDIATE RANGE PHASE (2015-2020)

According to the Base Master Plan from 2015 to 2020, the following buildings will be constructed inside the Air National Guard Base at Rickenbacker:

• New Operations and Training / Medical Facility. This facility will replace the current

MPE/Finance/Clinic/Support HQ building.

The resulting estimated Base population is presented in Table 4.4 below.

TABLE 4.4 INTERMEDIATE RANGE PHASE (2015-2020) BASE POPULATION

BUILDING

NUMBER BUILDING DESCRIPTION DAILY

POPULATION

UTA

MAXIMUM

POPULATION

820 FIRE STATION 15 40

846 VEHICLE MAINTENANCE 0 0

849 REFUELER MAINTENANCE 1 2

872 CONTRACTING /SUPPLY /TMO 24 120

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 65 320

879 DELUGE PUMPS 0 0

880 DELUGE TANKS 0 0

883 AIRPLANE HANGAR 9 21

885 AIRPLANE HANGAR 70 246

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 0 0

888 AIRPLANE HANGAR 80 220

903 POL OPERATIONS 7 16

911 RECRUITING / BASE OPS 7 14

913 WEATHER FLIGHT / QUALITY 1 12

2000 WING HQ / OPS 55 164

JOINT VEHICLE MAINTENANCE 20 50

NEW FRONT ENTRANCE GATE 2 4

SECURITY FORCES 30 145

CE STORAGE BARN 0 0

GAS STATION 0 0

POTENTIAL E + I SQUADRON 8 100

LAND ACQUISITION 14 ACRES 0 0

ADDITION TO POL OPERATIONS 0 0

MOBILITY PROCESSING 4 50

NEW OPERATIONS & TRAINING / MEDICAL FACILITY 40 145

TOTAL POPULATION 438 1669

Ohio Air National Guard Project No. NLZG062005

As projected in Table 4.4, the daily population as well as the population during the one-day UTA activities will remain unchanged during this period.

4.6 LONG RANGE PHASE (2020-2025)

According to the Base Master Plan, the following buildings will be constructed inside the Air

National Guard Base at RANGB, from 2020 to 2025:

• New hangar to replace Buildings 885 and 888.

• Alert Facility

The resulting estimated Base population is presented in Table 4.5 below.

TABLE 4.5 LONG RANGE PHASE (2020-2025) BASE POPULATION

BUILDING

NUMBER BUILDING DESCRIPTION DAILY

POPULATION

UTA

MAXIMUM

POPULATION

820 FIRE STATION 15 40

846 VEHICLE MAINTENANCE 0 0

849 REFUELER MAINTENANCE 1 2

872 CONTRACTING /SUPPLY /TMO 24 120

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 65 320

879 DELUGE PUMPS 0 0

880 DELUGE TANKS 0 0

883 AIRPLANE HANGAR 9 21

885 AIRPLANE HANGAR 0 0

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 0 0

888 AIRPLANE HANGAR 0 0

903 POL OPERATIONS 7 16

911 RECRUITING / BASE OPS 7 14

913 WEATHER FLIGHT / QUALITY 1 12

2000 WING HQ / OPS 55 164

JOINT VEHICLE MAINTENANCE 20 50

NEW FRONT ENTRANCE GATE 2 4

SECURITY FORCES 30 145

CE STORAGE BARN 0 0

GAS STATION 0 0

POTENTIAL E + I SQUADRON 8 100

ADDITION TO POL OPERATIONS 0 0

LAND ACQUISITION 14 ACRES 0 0

MOBILITY PROCESSING / ADD-ALTER LOGISTICS FACILITY 4 50

NEW OPERATIONS & TRAINING / MEDICAL FACILITY 40 145

HANGAR 150 446

ALERT FACILITY 10 50

TOTAL POPULATION 448 1699

Ohio Air National Guard Project No. NLZG062005

As projected in Table 4.5, daily population of the RANGB will increase from 438 people in 2020 to 448 people in 2025. During this period, the population during the one-day UTA activities will increase from 1669 people to 1699 people.

4.7 SUMMARY TOTAL BASE POPULATION PROJECTIONS

The total estimated population at the RANGB is summarized in Table 4.6 and shown graphically in Figure 4.1:

TABLE 4.6 TOTAL BASE POPULATION PROJECTIONS

YEAR Non Resident Daily Population

UTA Population (once /month)

Existing Installation 386 1350 2005-2010 434 1619 2010-2015 438 1669 2015-2020 438 1669 2020-2025 448 1699

Figure 4.1 Total Base Population Projections

Existing Installation

2005-2010 2010-2015 2015-2020 2020-2025

Year

Po pu la tio n Non Resident Daily Population

UTA Population (once /month)

Ohio Air National Guard Project No. NLZG062005

5.0 FIXTURE UNIT COUNT

5.1 FLOW DETERMINATION

Building fixture unit counts in the various buildings were taken from the plans of the existing facilities provided by the Base Civil Engineer. Fixture counts are the number of plumbing fixtures, i.e., sinks, showers, toilets, etc., from which domestic water is used. A summary of these fixture counts by building is presented in Table 5.1.

Estimation of water demand and wastewater flows based on fixture counts is not in the scope of work of this report and should be accomplished by a more comprehensive Water Management Plan for the Base.

Instead, the calculation of domestic wastewater flows in this report will be based on the methodology recommended by the City of Columbus, Division of Sewerage and Drainage (DOSD).

TABLE 5.1 BUILDING FIXTURE UNIT COUNTS

NUMBER BUILDING DESCRIPTION BUILDING

AREA (SF) BUILDING FIXTURE COUNT

WOMEN MEN UNISEX KITCHEN

820 FIRE STATION 19,631 6 15 5 9

846 VEHICLE MAINTENANCE 27,150 3 15 0 0

849 REFUELER MAINTENANCE 27,150 4 31 0 0

872 CONTRACTING /SUPPLY /TMO 37,952 4 9 0 0

875 CIVIL ENGR, COMMUNICATIONS, SECURITY 40,720 10 16 0 3

879 DELUGE PUMPS 1,479 0 0 0 0

880 DELUGE TANKS 1,479 0 0 0 0

883 AIRPLANE HANGAR 32,247 11 26 6 0

885 AIRPLANE HANGAR 97,856 6 8 0 3

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 36,448 12 31 0 0

888 AIRPLANE HANGER 97,856 6 15 0 0

903 POL OPERATIONS 1,931 2 4 1 2

911 RECRUITING / BASE OPS 4,869 0 0 0 0

916 RECRUITING / BASE OPS 2,728 0 0 0 0

913 WEATHER FLIGHT / QUALITY 5,423 0 5 0 0

917 DINING FACILITY 21,000 2 12 0 6

2000 WING HQ / OPS 50,188 9 22 2 1

Since plans for the future buildings are not yet prepared, it is not possible to project the future fixture counts at RANGB.

Ohio Air National Guard Project No. NLZG062005

6.0. WATER SYSTEM

6.1 DOMESTIC WATER USE

6.1.1 DESIGN CRITERIA

For evaluation of the capacity of the water system, PRIME used the design criteria specified in “Joint

Departments of the Army and Air Force USA, Technical Manual TM 5-813-1/AFM 88-10, Volume 1, Water Supply, Sources and General Considerations, 4 June 1987”. These criteria require consideration of the following water system parameters for water systems at Army and Air Force installations:

• Effective Population

• Capacity Factor

• Design Population

• Required Daily Demand

• Fire Flow

• Peak Domestic Demand

• Total Water Demand

6.1.2 EFFECTIVE POPULATION

Normally, the effective design population is calculated by taking the resident population at the Base and adding to it an allowance for the nonresident population. However, at RANGB, there is no resident population. For a normal work week, personnel assigned to RANGB work an eight-hour shift and are, therefore, nonresident.

As shown in Table 4.1, the present daily population at RANGB consists of 386 people. Once a month, during UTA weekend event, this population increases to 1350. For this study, we will assume the UTA weekend event population as the effective design population.

Effective Population = Nonresident Population + Resident Population

Effective Population = 1,350 + 0 = 1,350 people

The resulting effective populations for the present, current, short range, intermediate range and long range periods are summarized in the Tables 4.1 through 4.5. The UTA maximum populations are presented in Table 4.6.

6.1.3 CAPACITY FACTOR

Capacity factor is the multiplier applied to the effective population figure to allow for unforeseen factors such as population increases and variations in water demand, uncertainties as to actual water

Ohio Air National Guard Project No. NLZG062005 requirements, and unusual peak demands whose magnitude cannot be accurately estimated in advance.

The capacity factor varies inversely with the magnitude of the population in the water service area.

Capacity factors will not be applied when calculating fire flows, irrigation requirements, or industrial demands. Capacity factors, as a function of “effective population”, are shown in Table 3-1 of the

Technical Manual TM 5-813-1/AFM 88-10, Vol. 1, “Water Supply, Sources and General Considerations, 4 June 1987”. Since our effective population falls under the category “5000 or less”, a capacity factor of

1.5 will be utilized to determine the design population for estimating the domestic water demand.

6.1.4 DESIGN POPULATION

Design population is the population figure obtained by multiplying the effective population figure by the appropriate capacity factor.

Design Population = Effective Population x Capacity Factor

Design Population = 1,350 x 1.5 = 2,025 people

The resulting design population for the present, current, short range, intermediate range and long range periods are summarized in Tables 6.1 through 6.5.

6.1.5 DAILY DEMAND

Daily demand is the total daily water requirement. It is obtained by multiplying the design population by the appropriate per capita domestic water allowance and plus any special industrial, aircraft wash, irrigation, air-conditioning, or other demands. There are no water demands for special industrial, irrigation, or air-conditioning at RANGB. Water is needed for aircraft washing. Per information obtained from the Base Civil Engineer, RANGB, one aircraft wash is performed during a week, utilizing approximately 300 gallons of water per wash cycle. Other demands to the water system are from the deluge pumps and deluge tanks, with a demand of 1,498 gallons per day.

Required Daily Demand = (Design Population x per capita domestic water allowance) +(other demands + aircraft wash needs);

Required Daily Demand= (2025 people x 50 gal/person/day) +(1,498 gal+ 300 gal) = 103,048 gpd

The resulting daily domestic water demand for the present, current, short range, intermediate range and long range periods are summarized are Tables 6.1 through 6.5.

6.2 FIRE FLOW PROTECTION REQUIREMENTS

The fire flow requirement is the quantity of water in gallons per minute (gpm) needed to control an anticipated fire in a building or group of buildings. Fire area is the total floor area in square feet for all floor levels within the exterior walls, or under the horizontal projection of the roof of a building.

TABLE 6.1 PRESENT (2006) TOTAL WATER DEMAND

NUMBER BUILDING DESCRIPTION

AVERAGE NON-

RESIDENT UTA

POPULATION IS

EQUAL TO

EFFECTIVE

POPULATION

AVERAGE

RESIDENT

POPULATION

DESIGN

POPULATION

SPECIAL

INDUSTRIAL

NEEDS

AIRCRAFT-

WASH NEEDS

(ONE

AIRCRAFT

PER WEEK)

IRRIGATION

NEEDS

AIR-CONDITIONING

NEEDS

OTHER

DEMANDS

TOTAL

REQUIRED

DAILY

DEMAND

MAXIMUM

DAILY

DEMAND

(2.5 TIMES

REQUIRED

DAILY

DEMAND)

REQUIRED

FIRE FLOW

REQUIRED

FIRE FLOW

FOR 1 HOUR

FIRE FLOW

PLUS 50%

REQUIRED

DAILY

DEMAND

820 FIRE STATION 40 0 60 3000 0 0 0 0 3000 7500.00 1500 90,000 91,500

846 VEHICLE MAINTENANCE 30 0 45 2250 0 0 0 0 2250 5625.00 1500 90,000 91,125

849 REFUELER MAINTENANCE 2 0 3 150 0 0 0 0 150 375.00 3000 180,000 180,075

872 CONTRACTING /SUPPLY /TMO 120 0 180 9000 0 0 0 0 9000 22500.00 3000 180,000 184,500 875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 320 0 480 24000 0 0 0 0 24000 60000.00 1500 90,000 102,000

879 DELUGE PUMPS 0 0 0 0 0 0 0 1388 1388 3470.00 0 0 694

880 DELUGE TANKS 0 0 0 0 0 0 0 110 110 275.00 0 0 55

883 AIRPLANE HANGER 21 0 32 1575 0 0 0 0 1575 3937.50 3000 180,000 180,788

885 AIRPLANE HANGER 246 0 369 18450 0 0 0 0 18450 46125.00 3000 180,000 189,225

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 145 0 218 10875 0 0 0 0 10875 27187.50 3000 180,000 185,438

888 AIRPLANE HANGER 220 0 330 16500 0 0 0 0 16500 41250.00 3000 180,000 188,250

903 POL OPERATIONS 16 0 24 1200 0 0 0 0 1200 3000.00 1500 90,000 90,600

911 RECRUITING / BASE OPS 14 0 21 1050 0 0 0 0 1050 2625.00 1500 90,000 90,525

913 WEATHER FLIGHT / QUALITY 12 0 18 900 0 0 0 0 900 2250.00 1500 90,000 90,450

2000 WING HQ / OPS 164 0 246 12300 0 0 0 0 12300 30750.00 1500 90,000 96,150

1350 0 2025 101,250 0 300 0 0 1,498 103,048 257,620 28,500 1,710,000 1,761,524

PEOPLE PEOPLE PEOPLE GPD GPD GPD GPD GPD GPD GPD GPD GPM GPH GPD

TOTAL

REMARKS

FIRE REQUIREMENTSDOMESTIC

REQUIREMENTSPRESENT (2006) BASE

POPULATION VARIOUS DEMANDS

DESIGN

POPULATION

X

50 GAL/PER/DAY

(GPCD)

TABLE 6.2 CURRENT PHASE (2005-2010) WATER DEMAND

NUMBER BUILDING DESCRIPTION

AVERAGE NON-

RESIDENT UTA

POPULATION IS

EQUAL TO

EFFECTIVE

POPULATION

AVERAGE

RESIDENT

POPULATION

DESIGN

POPULATION

SPECIAL

INDUSTRIAL

NEEDS

AIRCRAFT-

WASH

NEEDS

(ONE

AIRCRAFT

PER WEEK)

IRRIGATION

NEEDS

AIR-

CONDITIONING

NEEDS

OTHER

DEMANDS

TOTAL

REQUIRED

DAILY

DEMAND

MAXIMUM

DAILY

DEMAND

(2.5 TIMES

REQUIRED

DAILY

DEMAND)

REQUIRED

FIRE FLOW

REQUIRED

FIRE FLOW

FOR 1 HOUR

FIRE FLOW

PLUS 50%

REQUIRED

DAILY

DEMAND

820 FIRE STATION 40 0 60 3000 0 0 0 0 3,000 7,500 1,500 90,000 91,500

846 VEHICLE MAINTENANCE 0 0 0 0 0 0 0 0 0 0

1,500 90,000

90,000

POPULATION WILL RELOCATE TO

BLDG #846

849 REFUELER MAINTENANCE 2 0 3 150 0 0 0 0 150 375 3,000 180,000 180,075

872 CONTRACTING /SUPPLY /TMO 120 0 180 9000 0 0 0 0 9,000 22,500 3,000 180,000 184,500 875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 320 0 480 24000 0 0 0 0 24,000 60,000 1,500 90,000 102,000

879 DELUGE PUMPS 0 0 0 0 0 0 0 1388 1,388 3,470 0 0 694

880 DELUGE TANKS 0 0 0 0 0 0 0 110 110 275 0 0 55

883 AIRPLANE HANGER 21 0 32 1575 0 0 0 0 1,575 3,938 3,000 180,000 180,788

885 AIRPLANE HANGER 246 0 369 18450 0 0 0 0 18,450 46,125 3,000 180,000 189,225

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 145 0 218 10875 0 0 0 0 10,875 27,188 3,000 180,000 185,438

888 AIRPLANE HANGER 220 0 330 16500 0 0 0 0 16,500 41,250 3,000 180,000 188,250

903 POL OPERATIONS 16 0 24 1200 0 0 0 0 1,200 3,000 1,500 90,000 90,600

911 RECRUITING / BASE OPS 14 0 21 1050 0 0 0 0 1,050 2,625 1,500 90,000 90,525

913 WEATHER FLIGHT / QUALITY 12 0 18 900 0 0 0 0 900 2,250 1,500 90,000 90,450

2000 WING HQ / OPS 164 0 246 12300 0 0 0 0 12,300 30,750 1,500 90,000 96,150

JOINT VEHICLE MAINTENANCE 50 0 75 3750 0 0 0 0 3,750 9,375

0 0

1,875

POPULATION WILL RELOCATE TO

BLDG #846

NEW FRONT ENTRANCE GATE 4 0 6 300 0 0 0 0 300 750 1,500 90,000 90,150

SECURITY FORCES 145 0 217.5 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

CE STORAGE BARN 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

GAS STATION 0 0 0 0 0 0 0 0 0 0 3,000 180,000 180,000

POTENTIAL E + I SQUADRON 100 0 150 7500 0 0 0 0 7,500 18,750 1,500 90,000 93,750

ADDITION TO POL OPERATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0

1619 0 2428.5 121,425 0 300 0 0 1,498 123,223 308,058 37,500 2,250,000 2,311,612

PEOPLE PEOPLE PEOPLE GPD GPD GPD GPD GPD GPD GPD GPD GPM GPH GPD

TOTAL

REMARKS

FIRE REQUIREMENTSDOMESTIC

REQUIREMENTSCURRENT PHASE ( 2005-2010)

POPULATION VARIOUS DEMANDS

DESIGN

POPULATION

X

TABLE 6.3 SHORT RANGE PHASE (2010-2015) WATER DEMAND

NUMBER BUILDING DESCRIPTION

AVERAGE NON-

RESIDENT UTA

POPULATION IS

EQUAL TO

EFFECTIVE

POPULATION

AVERAGE

RESIDENT

POPULATION

DESIGN

POPULATION

SPECIAL

INDUSTRIAL

NEEDS

AIRCRAFT-

WASH

NEEDS

(ONE

AIRCRAFT

PER WEEK)

IRRIGATION

NEEDS

AIR-

CONDITIONING

NEEDS

OTHER

DEMANDS

TOTAL

REQUIRED

DAILY

DEMAND

MAXIMUM

DAILY

DEMAND

(2.5 TIMES

REQUIRED

DAILY

DEMAND)

REQUIRED

FIRE FLOW

REQUIRED

FIRE FLOW

FOR 1 HOUR

FIRE FLOW

PLUS 50%

REQUIRED

DAILY

DEMAND

820 FIRE STATION 40 0 60 3000 0 0 0 0 3,000 7,500 1,500 90,000 91,500

846 VEHICLE MAINTENANCE 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

849 REFUELER MAINTENANCE 2 0 3 150 0 0 0 0 150 375 3,000 180,000 180,075

872 CONTRACTING /SUPPLY /TMO 120 0 180 9000 0 0 0 0 9,000 22,500 3,000 180,000 184,500 875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 320 0 480 24000 0 0 0 0 24,000 60,000 1,500 90,000 102,000

879 DELUGE PUMPS 0 0 0 0 0 0 0 1,388 1,388 3,470 0 0 694

880 DELUGE TANKS 0 0 0 0 0 0 0 110 110 275 0 0 55

883 AIRPLANE HANGER 21 0 32 1575 0 0 0 0 1,575 3,938 3,000 180,000 180,788

885 AIRPLANE HANGER 246 0 369 18450 0 0 0 0 18,450 46,125 3,000 180,000 189,225

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 145 0 218 10875 0 0 0 0 10,875 27,188 3,000 180,000 185,438

888 AIRPLANE HANGER 220 0 330 16500 0 0 0 0 16,500 41,250 3,000 180,000 188,250

903 POL OPERATIONS 16 0 24 1200 0 0 0 0 1,200 3,000 1,500 90,000 90,600

911 RECRUITING / BASE OPS 14 0 21 1050 0 0 0 0 1,050 2,625 1,500 90,000 90,525

913 WEATHER FLIGHT / QUALITY 12 0 18 900 0 0 0 0 900 2,250 1,500 90,000 90,450

2000 WING HQ / OPS 164 0 246 12300 0 0 0 0 12,300 30,750 1,500 90,000 96,150

JOINT VEHICLE MAINTENANCE 50 0 75 3750 0 0 0 0 3,750 9,375 0 0 1,875

NEW FRONT ENTRANCE GATE 4 0 6 300 0 0 0 0 300 750 1,500 90,000 90,150

SECURITY FORCES 145 0 217.5 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

CE STORAGE BARN 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

GAS STATION 0 0 0 0 0 0 0 0 0 0 3,000 180,000 180,000

POTENTIAL E + I SQUADRON 100 0 150 7500 0 0 0 0 7,500 18,750 1,500 90,000 93,750

ADDITION TO POL OPERATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0

LAND ACQUISITION 14 ACRES 0 0 0 0 0 0 0 0 0 0 0

MOBILITY PROCESSING 50 0 75 3750 0 0 0 0 3,750 9,375 1,500 90,000 91,875

1669 0 2503.5 125,175 0 300 0 0 1,498 126,973 317,433 39,000 2,340,000 2,403,487

PEOPLE PEOPLE PEOPLE GPD GPD GPD GPD GAL/DAY GPD GPD GPD GPM GPH GPD

TOTAL

REMARKS

FIRE REQUIREMENTSDOMESTIC

REQUIREMENTSSHORT RANGE (2010-2015)

POPULATION VARIOUS DEMANDS

DESIGN

POPULATION

X

TABLE 6.4 INTERMEDIATE RANGE PHASE (2015-2020) WATER DEMAND

NUMBER BUILDING DESCRIPTION

AVERAGE NON-

RESIDENT UTA

POPULATION IS

EQUAL TO

EFFECTIVE

POPULATION

AVERAGE

RESIDENT

POPULATION

DESIGN

POPULATION

SPECIAL

INDUSTRIAL

NEEDS

AIRCRAFT-

WASH

NEEDS

(ONE

AIRCRAFT

PER WEEK)

IRRIGATION

NEEDS

AIR-

CONDITIONING

NEEDS

OTHER

DEMANDS

TOTAL

REQUIRED

DAILY

DEMAND

MAXIMUM

DAILY

DEMAND

(2.5 TIMES

REQUIRED

DAILY

DEMAND)

REQUIRED

FIRE FLOW

REQUIRED

FIRE FLOW

FOR 1 HOUR

FIRE FLOW

PLUS 50%

REQUIRED

DAILY

DEMAND

820 FIRE STATION 40 0 60 3000 0 0 0 0 3,000 7,500 1,500 90,000 91,500

846 VEHICLE MAINTENANCE 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

849 REFUELER MAINTENANCE 2 0 3 150 0 0 0 0 150 375 3,000 180,000 180,075

872 CONTRACTING /SUPPLY /TMO 120 0 180 9000 0 0 0 0 9,000 22,500 3,000 180,000 184,500 875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 320 0 480 24000 0 0 0 0 24,000 60,000 1,500 90,000 102,000

879 DELUGE PUMPS 0 0 0 0 0 0 0 1,388 1,388 3,470 0 0 694

880 DELUGE TANKS 0 0 0 0 0 0 0 110 110 275 0 0 55

883 AIRPLANE HANGER 21 0 32 1575 0 0 0 0 1,575 3,938 3,000 180,000 180,788

885 AIRPLANE HANGER 246 0 369 18450 0 0 0 0 18,450 46,125 3,000 180,000 189,225

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 0 0 0 0 0 0 0 0 0 0 0 0 0 DEMOLISHED

888 AIRPLANE HANGER 220 0 330 16500 0 0 0 0 16,500 41,250 3,000 180,000 188,250

903 POL OPERATIONS 16 0 24 1200 0 0 0 0 1,200 3,000 1,500 90,000 90,600

911 RECRUITING / BASE OPS 14 0 21 1050 0 0 0 0 1,050 2,625 1,500 90,000 90,525

913 WEATHER FLIGHT / QUALITY 12 0 18 900 0 0 0 0 900 2,250 1,500 90,000 90,450

2000 WING HQ / OPS 164 0 246 12300 0 0 0 0 12,300 30,750 1,500 90,000 96,150

JOINT VEHICLE MAINTENANCE 50 0 75 3750 0 0 0 0 3,750 9,375 0 0 1,875

NEW FRONT ENTRANCE GATE 4 0 6 300 0 0 0 0 300 750 1,500 90,000 90,150

SECURITY FORCES 145 0 218 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

CE STORAGE BARN 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

GAS STATION 0 0 0 0 0 0 0 0 0 0 3,000 180,000 180,000

POTENTIAL E + I SQUADRON 100 0 150 7500 0 0 0 0 7,500 18,750 1,500 90,000 93,750

ADDITION TO POL OPERATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0

LAND ACQUISITION 14 ACRES 0 0 0 0 0 0 0 0 0 0 0 0 0

MOBILITY PROCESSING 50 0 75 3750 0 0 0 0 3,750 9,375 1,500 90,000 91,875

NEW OPERATIONS & TRAINING / MEDICAL FACILITY 145 0 218 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

1669 0 2503.5 125,175 0 300 0 0 1,498 126,973 317,433 37,500 2,250,000 2,313,487

PEOPLE PEOPLE PEOPLE GPD GPD GPD GPD GPD GPD GPD GPD GPM GPH GPD

TOTAL

REMARKS

FIRE REQUIREMENTSDOMESTIC

REQUIREMENTSINTERMEDIATE RANGE ( 2015-2020)

POPULATION VARIOUS DEMANDS

DESIGN

POPULATION

X

TABLE 6.5 LONG RANGE PHASE (2020-2025) WATER DEMAND

NUMBER BUILDING DESCRIPTION

AVERAGE NON-

RESIDENT UTA

POPULATION IS

EQUAL TO

EFFECTIVE

POPULATION

AVERAGE

RESIDENT

POPULATION

DESIGN

POPULATION

SPECIAL

INDUSTRIAL

NEEDS

AIRCRAFT-

WASH NEEDS

(ONE

AIRCRAFT PER

WEEK)

IRRIGATION

NEEDS

AIR-CONDITIONING

NEEDS

OTHER

DEMANDS

TOTAL

REQUIRED

DAILY DEMAND

MAXIMUM

DAILY DEMAND

(2.5 TIMES

REQUIRED

DAILY

DEMAND)

REQUIRED

FIRE FLOW

REQUIRED

FIRE FLOW

FOR 1 HOUR

FIRE FLOW

PLUS 50%

REQUIRED

DAILY

DEMAND

820 FIRE STATION 40 0 60 3000 0 0 0 0 3,000 7,500 1,500 90,000 91,500

846 VEHICLE MAINTENANCE 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

849 REFUELER MAINTENANCE 2 0 3 150 0 0 0 0 150 375 3,000 180,000 180,075

872 CONTRACTING /SUPPLY /TMO 120 0 180 9000 0 0 0 0 9,000 22,500 3,000 180,000 184,500 875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES 320 0 480 24000 0 0 0 0 24,000 60,000 1,500 90,000 102,000

879 DELUGE PUMPS 0 0 0 0 0 0 0 1,388 1,388 3,470 0 0 694

880 DELUGE TANKS 0 0 0 0 0 0 0 110 110 275 0 0 55

883 AIRPLANE HANGER 21 0 32 1575 0 0 0 0 1,575 3,938 3,000 180,000 180,788

885 AIRPLANE HANGER 0 0 0 0 0 0 0 0 0 0 0 0 0 DEMOLISHED

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ 0 0 0 0 0 0 0 0 0 0 0 0 0 DEMOLISHED

888 AIRPLANE HANGER 0 0 0 0 0 0 0 0 0 0 0 0 0 DEMOLISHED

903 POL OPERATIONS 16 0 24 1200 0 0 0 0 1,200 3,000 1,500 90,000 90,600

911 RECRUITING / BASE OPS 14 0 21 1050 0 0 0 0 1,050 2,625 1,500 90,000 90,525

913 WEATHER FLIGHT / QUALITY 12 0 18 900 0 0 0 0 900 2,250 1,500 90,000 90,450

2000 WING HQ / OPS 164 0 246 12300 0 0 0 0 12,300 30,750 1,500 90,000 96,150

JOINT VEHICLE MAINTENANCE 50 0 75 3750 0 0 0 0 3,750 9,375 0 0 1,875

NEW FRONT ENTRANCE GATE 4 0 6 300 0 0 0 0 300 750 1,500 90,000 90,150

SECURITY FORCES 145 0 218 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

CE STORAGE BARN 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

GAS STATION 0 0 0 0 0 0 0 0 0 0 1,500 90,000 90,000

POTENTIAL E + I SQUADRON 100 0 150 7500 0 0 0 0 7,500 18,750 1,500 90,000 93,750

ADDITION TO POL OPERATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0

LAND ACQUISITION 14 ACRES 0 0 0 0 0 0 0 0 0 0 0 0 0

MOBILITY PROCESSING 50 0 75 3750 0 0 0 0 3,750 9,375 1,500 90,000 91,875

NEW OPERATIONS & TRAINING / MEDICAL FACILITY 145 0 218 10875 0 0 0 0 10,875 27,188 1,500 90,000 95,438

HANGAR 446 0 669 33450 0 0 0 0 33,450 83,625 1,500 90,000 106,725

ALERT FACILITY 50 0 75 3750 0 0 0 0 3,750 9,375 1,500 90,000 91,875

1699 0 2548.5 127,425 0 300 0 0 1,498 129,223 323,058 33,000 1,980,000 2,044,612

PEOPLE PEOPLE PEOPLE GPD GPD GPD GPD GPD GPD GPD GPD GPM GPH GPD

TOTAL

REMARKS

FIRE REQUIREMENTSDOMESTIC

REQUIREMENTSLONG RANGE ( 2020-2025)

POPULATION VARIOUS DEMANDS

DESIGN

POPULATION X

Ohio Air National Guard Project No. NLZG062005

The water supply system at RANGB must be capable of supplying the fire flow demand plus normal consumption at residual pressure and for a normal fire fighting duration of 60 minutes. The requirements must be analyzed to determine whether the capacity of the system is fixed by the domestic requirements, the fire demand, or by a combination of both. Normally, where fire flows are relatively high, or required for long duration, and population and/or industrial use is relatively low, the total required water supply capacity will be determined by the prevailing fire flow demand.

6.2.1 FIRE FLOW REQUIREMENTS FOR BUILDINGS

Fire flow requirements in this study are based on “Water Supplies for Fire Protection”, Fourth Edition, published by Fire Protection Publications, Oklahoma State University and “Fire Protection Design

Manual”, Fourth Edition, published by Department of Veteran Affairs. Fire flow was calculated using the information provided in Table 4-A, Appendix A of “Water Supplies for Fire Protection”.

The calculated fire flow may be reduced up to 75 percent when the building is provided with an approved automatic sprinkler system. However, in no case should this be less than 1500 gallons per minute. Tables

6.6 through 6.10 present fire-flow demand for the Base for the different phases covered by this study.

6.2.2 FIRE FIGHTING DURATION

“Fire Protection Design Manual” requires that the fire flow for non-sprinklered buildings must be available for a minimum duration of 60 minutes for buildings exhibiting “favorable conditions”.

Favorable conditions are:

• Non-combustible construction

• Limited exposures

• Ready access to entire building site by fire department apparatus

• Quick response by adequately staffed fire department

Based on the above, this study assumes all buildings at the RANGB exhibit favorable conditions.

Fire-flows for sprinklered buildings were calculated as required by NFPA 13, “Automated Sprinkler

Systems Handbook”, in accordance with the occupancy classification.

6.2.3 FIRE FLOW DEMAND

Fire flow demand is the required flow in gpm at a specific pressure at the site of the fire for a specific period of time. The requirements for the present RANGB installation are tabulated in Table 6.6.

Therefore, the total present fire flows for the buildings is 28,500 gpm for the duration of 60 minutes for each building.

Fire flow = 28,500 gpm x 60 minutes/ 1 hour =1,710,000 gallons/hour

TABLE 6.6 PRESENT (2006) FIRE FLOW DEMAND

NUMBER BUILDING DESCRIPTION

NUMBER

OF FLOOR

LEVELS

TYPE OF

BUILDING

MATERIAL

TOTAL FIRE

AREA

TYPE OF

BUILDING

REQUIRED

FIRE FLOW

1 HR

SPRINKLERS

FIRE FLOW UP

TO 75%

REDUCTION

DUE TO

SPRINKLER

SYSTEM

TOTAL

REQUIRED

FIRE FLOW

SQ. FT. GPM GPM GPM

820 FIRE STATION ONE BRICK 19,631 FIRESTATION 1,500 1,500

846 VEHICLE MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 1,500 1,500

849 REFUELER MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 3,000 3,000

CONTRACTING /SUPPLY /TMO OFFICE 1,500 1,500

CONTRACTING /SUPPLY /TMO WAREHOUSE 1,500 1,500

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES ONE STUCCO 40,720 OFFICE 2,250 YES 1,500 1,500

879 DELUGE PUMPS N/A N/A 1,479 N/A 0 0

880 DELUGE TANKS N/A N/A 1,479 N/A 0 0

883 AIRPLANE HANGAR ONE METAL 32,247 HANGAR 3,000 3,000

885 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ TWO MASONRY 36,448 OFFICE 1,500 1,500

888 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

903 POL OPERATIONS ONE BRICK 1,931 OFFICE 1,500 1,500

911 RECRUITING / BASE OPS ONE MASONRY 4,869 OFFICE 1,500 1,500

913 WEATHER FLIGHT / QUALITY ONE BRICK 5,423 OFFICE 1,500 1,500

2000 WING HQ / OPS TWO BRICK 50,188 OFFICE 2,500 YES 1,500 1,500

28,750 27,000

37,952872

TOTAL

MASONRYONE

TABLE 6.7 CURRENT PHASE (2005-2010) FIRE FLOW DEMAND

NUMBER BUILDING DESCRIPTION

NUMBER

OF FLOOR

LEVELS

TYPE OF

BUILDING

MATERIAL

TOTAL FIRE

AREA

TYPE OF

BUILDING

REQUIRED

FIRE FLOW

1 HR

SPRINKLERS

FIRE FLOW UP

TO 75%

REDUCTION

DUE TO

SPRINKLER

SYSTEM

TOTAL

REQUIRED

FIRE FLOW

SQ. FT. GPM GPM GPM

820 FIRE STATION ONE BRICK 19,631 FIRESTATION 1,500 1,500

846 VEHICLE MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 1,500 1,500

849 REFUELER MAINTENANCE ONE MASONRY 27,150 REPAIR SHOP 3,000 3,000

CONTRACTING /SUPPLY /TMO OFFICE 1,500 1,500

CONTRACTING /SUPPLY /TMO WAREHOUSE 1,500 1,500

875 CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES ONE STUCCO 40,720 OFFICE 2,250 YES 1,500 1,500

879 DELUGE PUMPS N/A N/A 1,479 N/A 0 0

880 DELUGE TANKS N/A N/A 1,479 N/A 0 0

883 AIRPLANE HANGAR ONE METAL 32,247 HANGAR 3,000 3,000

885 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

887 MPE / FINANCE / CLINIC / SUPPORT GROUP HQ TWO MASONRY 36,448 OFFICE 1,500 1,500

888 AIRPLANE HANGAR ONE METAL 97,856 HANGAR 3,000 3,000

903 POL OPERATIONS ONE BRICK 1,931 OFFICE 1,500 1,500

911 RECRUITING / BASE OPS ONE MASONRY 4,869 OFFICE 1,500 1,500

913 WEATHER FLIGHT / QUALITY ONE BRICK 5,423 OFFICE 1,500 1,500

2000 WING HQ / OPS TWO BRICK 50,188 OFFICE 2,500 YES 1,500 1,500

JOINT VEHICLE MAINTENANCE

NEW FRONT ENTRANCE GATE ONE 1,500 1,500

SECURITY FORCES ONE MASONRY 18,900 OFFICE 1,500 1,500

CE STORAGE BARN ONE WAREHOUSE 1,500 1,500

GAS STATION ONE GAS STATION 3,000 3,000

POTENTIAL E + I SQUADRON TWO OFFICE 1,500 1,500

LAND ACQUISITION 14 ACRES

37,750 36,000

TOTAL

JOINT VEHICLE MAINTENANCE POPULATION WILL RELOCATE TO BLDG #846

CURRENT PHASE (2005-2010) FIRE-FLOW DEMAND

ONE MASONRY 37,952

TABLE 6.8 SHORT RANGE PHASE (2010-2015) FIRE FLOW DEMAND

NUMBER BUILDING DESCRIPTION

NUMBER

OF FLOOR

LEVELS

TYPE OF

BUILDING

MATERIAL

TOTAL FIRE

AREA

TYPE OF

BUILDING

REQUIRED

FIRE FLOW

1 HR

SPRINKLERS

FIRE FLOW UP

TO 75%

REDUCTION

DUE TO

SPRINKLER

SYSTEM

TOTAL

REQUIRED

FIRE FLOW

SQ. FT. GPM GPM GPM

820 FIRE STATION ONE BRICK 19,631 FIRESTATION 1,500 1,500

846 VEHICLE MAINTENANCE ONE MASONRY 27,150 REPAIR…

This is the start of the file's text. The full file is on GovTribe.