Exhibit D COST BREAKDOWN
SUBMITTED IN RESPONSE TO
W91364-10-R-0004
1. Distribute indirect costs to each applicable item shown on this sheet (i.e., don't load only one item). Show "field" or "job" overhead (non-home office or non-"G&A ") under "all other."
2. For each work category which is key subcontracted: identify key subcontractors) names and amounts) and amount of any self-performed work. If there is more than one key subcontractor per work category, list each name and subcontract amount, using additional lines, as necessary.
3. For other than key subcontracted work items: list total amount of subcontracts) and amount of work to be self-performed, if any.
4. Category totals and sum of all work category totals must match bid item totals.
5. The government reserves the right to obtain additional cost clarification (details), if necessary, to adequately evaluate proposed prices.
6. Prime contractor- -please obtain subcontract and material quotes in such manner as to be able to accurately breakout costs into this format.
7. This information can be provided in a word or excel type document. Offerers shall ensure all information required below is provided and is responsible for the validity of all information regardless of format.
TOTAL OF ALL LINE ITEMS TO INCLUDE OPTIONS
| Work Category |
| Key Subcontractor |
| Subcontract |
| Prime |
| Subtotal |
| Prime |
| Total |
| Name |
| Cost |
| Self |
| Sub & Prime |
| OH (G&A) |
| Cost |
| (if Applicable) |
| To Prime |
| Cost |
| Job Cost |
| Profit/Bond |