Fireprotection PRESENT
| TABLE 6.6 PRESENT (2006) FIRE FLOW DEMAND | |||||||||
| BUILDING NUMBER | BUILDING DESCRIPTION | NUMBER OF FLOOR LEVELS | TYPE OF BUILDING MATERIAL | TOTAL FIRE AREA | TYPE OF BUILDING | REQUIRED FIRE FLOW 1 HR | SPRINKLERS | FIRE FLOW UP TO 75% REDUCTION DUE TO SPRINKLER SYSTEM | TOTAL REQUIRED FIRE FLOW |
| SQ. FT. | GPM | GPM | GPM | ||||||
| 820 | FIRE STATION | ONE | BRICK | 19,631 | FIRESTATION | 1,500 | 1,500 | ||
| 846 | VEHICLE MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 1,500 | 1,500 | ||
| 849 | REFUELER MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 3,000 | 3,000 | ||
| 872 | CONTRACTING /SUPPLY /TMO | ONE | MASONRY | 37,952 | OFFICE | 1,500 | 1,500 | ||
| CONTRACTING /SUPPLY /TMO | WAREHOUSE | 1,500 | 1,500 | ||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | ONE | STUCCO | 40,720 | OFFICE | 2,250 | YES | 1,500 | 1,500 |
| 879 | DELUGE PUMPS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 880 | DELUGE TANKS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 883 | AIRPLANE HANGAR | ONE | METAL | 32,247 | HANGAR | 3,000 | 3,000 | ||
| 885 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | TWO | MASONRY | 36,448 | OFFICE | 1,500 | 1,500 | ||
| 888 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 903 | POL OPERATIONS | ONE | BRICK | 1,931 | OFFICE | 1,500 | 1,500 | ||
| 911 | RECRUITING / BASE OPS | ONE | MASONRY | 4,869 | OFFICE | 1,500 | 1,500 | ||
| 913 | WEATHER FLIGHT / QUALITY | ONE | BRICK | 5,423 | OFFICE | 1,500 | 1,500 | ||
| 2000 | WING HQ / OPS | TWO | BRICK | 50,188 | OFFICE | 2,500 | YES | 1,500 | 1,500 |
| TOTAL | 28,750 | 27,000 |
Fireprotection CURRENT
| TABLE 6.7 CURRENT PHASE (2005-2010) FIRE FLOW DEMAND | |||||||||
| BUILDING NUMBER | BUILDING DESCRIPTION | NUMBER OF FLOOR LEVELS | TYPE OF BUILDING MATERIAL | TOTAL FIRE AREA | TYPE OF BUILDING | REQUIRED FIRE FLOW 1 HR | SPRINKLERS | FIRE FLOW UP TO 75% REDUCTION DUE TO SPRINKLER SYSTEM | TOTAL REQUIRED FIRE FLOW |
| SQ. FT. | GPM | GPM | GPM | ||||||
| 820 | FIRE STATION | ONE | BRICK | 19,631 | FIRESTATION | 1,500 | 1,500 | ||
| 846 | VEHICLE MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 1,500 | 1,500 | ||
| 849 | REFUELER MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 3,000 | 3,000 | ||
| 872 | CONTRACTING /SUPPLY /TMO | ONE | MASONRY | 37,952 | OFFICE | 1,500 | 1,500 | ||
| CONTRACTING /SUPPLY /TMO | WAREHOUSE | 1,500 | 1,500 | ||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | ONE | STUCCO | 40,720 | OFFICE | 2,250 | YES | 1,500 | 1,500 |
| 879 | DELUGE PUMPS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 880 | DELUGE TANKS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 883 | AIRPLANE HANGAR | ONE | METAL | 32,247 | HANGAR | 3,000 | 3,000 | ||
| 885 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | TWO | MASONRY | 36,448 | OFFICE | 1,500 | 1,500 | ||
| 888 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 903 | POL OPERATIONS | ONE | BRICK | 1,931 | OFFICE | 1,500 | 1,500 | ||
| 911 | RECRUITING / BASE OPS | ONE | MASONRY | 4,869 | OFFICE | 1,500 | 1,500 | ||
| 913 | WEATHER FLIGHT / QUALITY | ONE | BRICK | 5,423 | OFFICE | 1,500 | 1,500 | ||
| 2000 | WING HQ / OPS | TWO | BRICK | 50,188 | OFFICE | 2,500 | YES | 1,500 | 1,500 |
| CURRENT PHASE (2005-2010) FIRE-FLOW DEMAND | |||||||||
| JOINT VEHICLE MAINTENANCE | JOINT VEHICLE MAINTENANCE POPULATION WILL RELOCATE TO BLDG #846 | ||||||||
| NEW FRONT ENTRANCE GATE | ONE | 1,500 | 1,500 | ||||||
| SECURITY FORCES | ONE | MASONRY | 18,900 | OFFICE | 1,500 | 1,500 | |||
| CE STORAGE BARN | ONE | WAREHOUSE | 1,500 | 1,500 | |||||
| GAS STATION | ONE | GAS STATION | 3,000 | 3,000 | |||||
| POTENTIAL E + I SQUADRON | TWO | OFFICE | 1,500 | 1,500 | |||||
| LAND ACQUISITION 14 ACRES | |||||||||
| TOTAL | 37,750 | 36,000 |
Fireprotection SHORT
| TABLE 6.8 SHORT RANGE PHASE (2010-2015) FIRE FLOW DEMAND | |||||||||
| BUILDING NUMBER | BUILDING DESCRIPTION | NUMBER OF FLOOR LEVELS | TYPE OF BUILDING MATERIAL | TOTAL FIRE AREA | TYPE OF BUILDING | REQUIRED FIRE FLOW 1 HR | SPRINKLERS | FIRE FLOW UP TO 75% REDUCTION DUE TO SPRINKLER SYSTEM | TOTAL REQUIRED FIRE FLOW |
| SQ. FT. | GPM | GPM | GPM | ||||||
| 820 | FIRE STATION | ONE | BRICK | 19,631 | FIRESTATION | 1,500 | 1,500 | ||
| 846 | VEHICLE MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 1,500 | 1,500 | ||
| 849 | REFUELER MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 3,000 | 3,000 | ||
| 872 | CONTRACTING /SUPPLY /TMO | ONE | MASONRY | 37,952 | OFFICE | 1,500 | 1,500 | ||
| CONTRACTING /SUPPLY /TMO | WAREHOUSE | 1,500 | 1,500 | ||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | ONE | STUCCO | 40,720 | OFFICE | 2,250 | YES | 1,500 | 1,500 |
| 879 | DELUGE PUMPS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 880 | DELUGE TANKS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 883 | AIRPLANE HANGAR | ONE | METAL | 32,247 | HANGAR | 3,000 | 3,000 | ||
| 885 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | TWO | MASONRY | 36,448 | OFFICE | 1,500 | 1,500 | ||
| 888 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 903 | POL OPERATIONS | ONE | BRICK | 1,931 | OFFICE | 1,500 | 1,500 | ||
| 911 | RECRUITING / BASE OPS | ONE | MASONRY | 4,869 | OFFICE | 1,500 | 1,500 | ||
| 913 | WEATHER FLIGHT / QUALITY | ONE | BRICK | 5,423 | OFFICE | 1,500 | 1,500 | ||
| 2000 | WING HQ / OPS | TWO | BRICK | 50,188 | OFFICE | 2,500 | YES | 1,500 | 1,500 |
| CURRENT PHASE (2005-2010) FIRE-FLOW DEMAND | |||||||||
| JOINT VEHICLE MAINTENANCE | JOINT VEHICLE MAINTENANCE POPULATION WILL RELOCATE TO BLDG #846 | ||||||||
| NEW FRONT ENTRANCE GATE | ONE | 1,500 | 1,500 | ||||||
| SECURITY FORCES | ONE | MASONRY | 18,900 | OFFICE | 1,500 | 1,500 | |||
| CE STORAGE BARN | ONE | WAREHOUSE | 1,500 | 1,500 | |||||
| GAS STATION | ONE | GAS STATION | 3,000 | 3,000 | |||||
| POTENTIAL E + I SQUADRON | TWO | OFFICE | 1,500 | 1,500 | |||||
| LAND ACQUISITION 14 ACRES | |||||||||
| SHORT-RANGE PHASE (2010-2015) FIRE-FLOW DEMAND | |||||||||
| ADDITION TO POL OPERATIONS | ONE | OFFICE | 0 | 0 | |||||
| MOBILITY PROCESSING | ONE | 1,500 | 1,500 | ||||||
| TOTAL | 39,250 | 37,500 |
Fireprotection INTERM
| TABLE 6.9 INTERMEDIATE RANGE PHASE (2015-2020) FIRE FLOW DEMAND | |||||||||
| BUILDING NUMBER | BUILDING DESCRIPTION | NUMBER OF FLOOR LEVELS | TYPE OF BUILDING MATERIAL | TOTAL FIRE AREA | TYPE OF BUILDING | REQUIRED FIRE FLOW 1 HR | SPRINKLERS | FIRE FLOW UP TO 75% REDUCTION DUE TO SPRINKLER SYSTEM | TOTAL REQUIRED FIRE FLOW |
| SQ. FT. | GPM | GPM | GPM | ||||||
| 820 | FIRE STATION | ONE | BRICK | 19,631 | FIRESTATION | 1,500 | 1,500 | ||
| 846 | VEHICLE MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 1,500 | 1,500 | ||
| 849 | REFUELER MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 3,000 | 3,000 | ||
| 872 | CONTRACTING /SUPPLY /TMO | ONE | MASONRY | 37,952 | OFFICE | 1,500 | 1,500 | ||
| CONTRACTING /SUPPLY /TMO | WAREHOUSE | 1,500 | 1,500 | ||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | ONE | STUCCO | 40,720 | OFFICE | 2,250 | YES | 1,500 | 1,500 |
| 879 | DELUGE PUMPS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 880 | DELUGE TANKS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 883 | AIRPLANE HANGAR | ONE | METAL | 32,247 | HANGAR | 3,000 | 3,000 | ||
| 885 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | REPLACED | |||||||
| 888 | AIRPLANE HANGAR | ONE | METAL | 97,856 | HANGAR | 3,000 | 3,000 | ||
| 903 | POL OPERATIONS | ONE | BRICK | 1,931 | OFFICE | 1,500 | 1,500 | ||
| 911 | RECRUITING / BASE OPS | ONE | MASONRY | 4,869 | OFFICE | 1,500 | 1,500 | ||
| 913 | WEATHER FLIGHT / QUALITY | ONE | BRICK | 5,423 | OFFICE | 1,500 | 1,500 | ||
| 2000 | WING HQ / OPS | TWO | BRICK | 50,188 | OFFICE | 2,500 | YES | 1,500 | 1,500 |
| CURRENT PHASE (2005-2010) FIRE-FLOW DEMAND | |||||||||
| JOINT VEHICLE MAINTENANCE | JOINT VEHICLE MAINTENANCE POPULATION WILL RELOCATE TO BLDG #846 | ||||||||
| NEW FRONT ENTRANCE GATE | ONE | 1,500 | 1,500 | ||||||
| SECURITY FORCES | ONE | MASONRY | 18,900 | OFFICE | 1,500 | 1,500 | |||
| CE STORAGE BARN | ONE | WAREHOUSE | 1,500 | 1,500 | |||||
| GAS STATION | ONE | GAS STATION | 3,000 | 3,000 | |||||
| POTENTIAL E + I SQUADRON | TWO | OFFICE | 1,500 | 1,500 | |||||
| LAND ACQUISITION 14 ACRES | |||||||||
| SHORT-RANGE PHASE (2010-2015) FIRE-FLOW DEMAND | |||||||||
| ADDITION TO POL OPERATIONS | ONE | OFFICE | 0 | 0 | |||||
| MOBILITY PROCESSING | ONE | 1,500 | 1,500 | ||||||
| INTERMEDIATE-RANGE PHASE (2015-2020) FIRE-FLOW DEMAND | |||||||||
| NEW OPERATIONS & TRAINING / MEDICAL FACILITY | TWO | OFFICE | 3,000 | YES | 1,500 | 1,500 | |||
| TOTAL | 40,750 | 37,500 |
Fireprotection LONG
| TABLE 6.10 LONG RANGE PHASE (2020-2025) FIRE FLOW DEMAND | |||||||||
| BUILDING NUMBER | BUILDING DESCRIPTION | NUMBER OF FLOOR LEVELS | TYPE OF BUILDING MATERIAL | TOTAL FIRE AREA | TYPE OF BUILDING | REQUIRED FIRE FLOW 1 HR | SPRINKLERS | FIRE FLOW UP TO 75% REDUCTION DUE TO SPRINKLER SYSTEM | TOTAL REQUIRED FIRE FLOW |
| SQ. FT. | GPM | GPM | GPM | ||||||
| 820 | FIRE STATION | ONE | BRICK | 19,631 | FIRESTATION | 1,500 | 1,500 | ||
| 846 | VEHICLE MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 1,500 | 1,500 | ||
| 849 | REFUELER MAINTENANCE | ONE | MASONRY | 27,150 | REPAIR SHOP | 3,000 | 3,000 | ||
| 872 | CONTRACTING /SUPPLY /TMO | ONE | MASONRY | 37,952 | OFFICE | 1,500 | 1,500 | ||
| CONTRACTING /SUPPLY /TMO | WAREHOUSE | 1,500 | 1,500 | ||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | ONE | STUCCO | 40,720 | OFFICE | 2,250 | YES | 1,500 | 1,500 |
| 879 | DELUGE PUMPS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 880 | DELUGE TANKS | N/A | N/A | 1,479 | N/A | 0 | 0 | ||
| 883 | AIRPLANE HANGAR | ONE | METAL | 32,247 | HANGAR | 3,000 | 3,000 | ||
| 885 | AIRPLANE HANGAR | REPLACED | |||||||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | REPLACED | |||||||
| 888 | AIRPLANE HANGAR | REPLACED | |||||||
| 903 | POL OPERATIONS | ONE | BRICK | 1,931 | OFFICE | 1,500 | 1,500 | ||
| 911 | RECRUITING / BASE OPS | ONE | MASONRY | 4,869 | OFFICE | 1,500 | 1,500 | ||
| 913 | WEATHER FLIGHT / QUALITY | ONE | BRICK | 5,423 | OFFICE | 1,500 | 1,500 | ||
| 2000 | WING HQ / OPS | TWO | BRICK | 50,188 | OFFICE | 2,500 | YES | 1,500 | 1,500 |
| CURRENT PHASE (2005-2010) FIRE-FLOW DEMAND | |||||||||
| JOINT VEHICLE MAINTENANCE | JOINT VEHICLE MAINTENANCE POPULATION WILL RELOCATE TO BLDG #846 | ||||||||
| NEW FRONT ENTRANCE GATE | ONE | 1,500 | 1,500 | ||||||
| SECURITY FORCES | ONE | MASONRY | 18,900 | OFFICE | 1,500 | 1,500 | |||
| CE STORAGE BARN | ONE | WAREHOUSE | 1,500 | 1,500 | |||||
| GAS STATION | ONE | GAS STATION | 3,000 | 3,000 | |||||
| POTENTIAL E + I SQUADRON | TWO | OFFICE | 1,500 | 1,500 | |||||
| LAND ACQUISITION 14 ACRES | |||||||||
| SHORT-RANGE PHASE (2010-2015) FIRE-FLOW DEMAND | |||||||||
| ADDITION TO POL OPERATIONS | ONE | OFFICE | 0 | 0 | |||||
| MOBILITY PROCESSING | ONE | 1,500 | 1,500 | ||||||
| INTERMEDIATE-RANGE PHASE (2015-2020) FIRE-FLOW DEMAND | |||||||||
| NEW OPERATIONS & TRAINING / MEDICAL FACILITY | TWO | OFFICE | 3,000 | YES | 1,500 | 1,500 | |||
| LONG-RANGE PHASE (2020-2025) FIRE-FLOW DEMAND | |||||||||
| HANGAR | 3,000 | YES | 1,500 | 1,500 | |||||
| ALERT FACILITY | 1,500 | 1,500 | |||||||
| TOTAL | 39,250 | 34,500 |
population 2005
| BUILDING NUMBER | BUILDING DESCRIPTION | DAILY POPULATION | UTA MAXIMUM POPULATION |
| 00004 | 2 | 2 | |
| 00502 | 2 | 2 | |
| 820 | FIRE STATION | 15 | 40 |
| 846 | VEHICLE MAINTENANCE | 12 | 30 |
| 849 | REFUELER MAINTENANCE | 1 | 2 |
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 |
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 |
| 879 | DELUGE PUMPS | 0 | 0 |
| 880 | DELUGE TANKS | 0 | 0 |
| 883 | AIRPLANE HANGER | 9 | 21 |
| 885 | AIRPLANE HANGER | 70 | 246 |
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | 40 | 145 |
| 888 | AIRPLANE HANGER | 80 | 220 |
| 903 | POL OPERATIONS | 7 | 16 |
| 911 | RECRUITING / BASE OPS | 7 | 14 |
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 |
| 2000 | WING HQ / OPS | 55 | 164 |
| TOTAL POPULATION | 390 | 1354 |
&CExisting Buildings & Population population 2005 -2010
| BUILDING NUMBER | BUILDING DESCRIPTION | DAILY POPULATION | UTA MAXIMUM POPULATION |
| 00004 | 2 | 2 | |
| 00502 | 2 | 2 | |
| 820 | FIRE STATION | 15 | 40 |
| 846 | VEHICLE MAINTENANCE | -12 | -30 |
| 849 | REFUELER MAINTENANCE | 1 | 2 |
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 |
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 |
| 879 | DELUGE PUMPS | 0 | 0 |
| 880 | DELUGE TANKS | 0 | 0 |
| 883 | AIRPLANE HANGER | 9 | 21 |
| 885 | AIRPLANE HANGER | 70 | 246 |
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | 40 | 145 |
| 888 | AIRPLANE HANGER | 80 | 220 |
| 903 | POL OPERATIONS | 7 | 16 |
| 911 | RECRUITING / BASE OPS | 7 | 14 |
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 |
| 2000 | WING HQ / OPS | 55 | 164 |
| JOINT VEHICLE MAINTENANCE | 20 | 50 | |
| NEW FRONT ENTRANCE GATE | 2 | 4 | |
| SECURITY FORCES | 30 | 145 | |
| CE STORAGE BARN | 0 | 0 | |
| GAS STATION | 0 | 0 | |
| POTENTIAL E + I SQUADRON | 8 | 100 | |
| ADDITION TO POL OPERATIONS | 0 | 0 | |
| TOTAL POPULATION | 426 | 1593 |
&CExisting Buildings & Population population 2010 -2015
| BUILDING NUMBER | BUILDING DESCRIPTION | DAILY POPULATION | UTA MAXIMUM POPULATION |
| 00004 | 2 | 2 | |
| 00502 | 2 | 2 | |
| 820 | FIRE STATION | 15 | 40 |
| 846 | VEHICLE MAINTENANCE | -12 | -30 |
| 849 | REFUELER MAINTENANCE | 1 | 2 |
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 |
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 |
| 879 | DELUGE PUMPS | 0 | 0 |
| 880 | DELUGE TANKS | 0 | 0 |
| 883 | AIRPLANE HANGER | 9 | 21 |
| 885 | AIRPLANE HANGER | 70 | 246 |
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | 40 | 145 |
| 888 | AIRPLANE HANGER | 80 | 220 |
| 903 | POL OPERATIONS | 7 | 16 |
| 911 | RECRUITING / BASE OPS | 7 | 14 |
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 |
| 2000 | WING HQ / OPS | 55 | 164 |
| JOINT VEHICLE MAINTENANCE | 20 | 50 | |
| NEW FRONT ENTRANCE GATE | 2 | 4 | |
| SECURITY FORCES | 30 | 145 | |
| CE STORAGE BARN | 0 | 0 | |
| GAS STATION | 0 | 0 | |
| POTENTIAL E + I SQUADRON | 8 | 100 | |
| ADDITION TO POL OPERATIONS | 0 | 0 | |
| LAND ACQUISITION 14 ACRES | 0 | 0 | |
| MOBILITY PROCESSING | 4 | 50 | |
| TOTAL POPULATION | 430 | 1643 |
&CExisting Buildings & Population population 2015 -2020
| BUILDING NUMBER | BUILDING DESCRIPTION | DAILY POPULATION | UTA MAXIMUM POPULATION |
| 00004 | 2 | 2 | |
| 00502 | 2 | 2 | |
| 820 | FIRE STATION | 15 | 40 |
| 846 | VEHICLE MAINTENANCE | -12 | -30 |
| 849 | REFUELER MAINTENANCE | 1 | 2 |
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 |
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 |
| 879 | DELUGE PUMPS | 0 | 0 |
| 880 | DELUGE TANKS | 0 | 0 |
| 883 | AIRPLANE HANGER | 9 | 21 |
| 885 | AIRPLANE HANGER | 70 | 246 |
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | -40 | -145 |
| 888 | AIRPLANE HANGER | 80 | 220 |
| 903 | POL OPERATIONS | 7 | 16 |
| 911 | RECRUITING / BASE OPS | 7 | 14 |
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 |
| 2000 | WING HQ / OPS | 55 | 164 |
| JOINT VEHICLE MAINTENANCE | 20 | 50 | |
| NEW FRONT ENTRANCE GATE | 2 | 4 | |
| SECURITY FORCES | 30 | 145 | |
| CE STORAGE BARN | 0 | 0 | |
| GAS STATION | 0 | 0 | |
| POTENTIAL E + I SQUADRON | 8 | 100 | |
| ADDITION TO POL OPERATIONS | 0 | 0 | |
| LAND ACQUISITION 14 ACRES | 0 | 0 | |
| MOBILITY PROCESSING / ADD-ALTER LOGISTICS FACILITY | 4 | 50 | |
| NEW OPERATIONS & TRAINING / MEDICAL FACILITY | 40 | 145 | |
| TOTAL POPULATION | 390 | 1498 |
&CExisting Buildings & Population population 2020 -2025)
| BUILDING NUMBER | BUILDING DESCRIPTION | DAILY POPULATION | UTA MAXIMUM POPULATION |
| 00004 | 2 | 2 | |
| 00502 | 2 | 2 | |
| 820 | FIRE STATION | 15 | 40 |
| 846 | VEHICLE MAINTENANCE | 12 | 30 |
| 849 | REFUELER MAINTENANCE | 1 | 2 |
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 |
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 |
| 879 | DELUGE PUMPS | 0 | 0 |
| 880 | DELUGE TANKS | 0 | 0 |
| 883 | AIRPLANE HANGER | 9 | 21 |
| 885 | AIRPLANE HANGER | 70 | 246 |
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | 40 | 145 |
| 888 | AIRPLANE HANGER | 80 | 220 |
| 903 | POL OPERATIONS | 7 | 16 |
| 911 | RECRUITING / BASE OPS | 7 | 14 |
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 |
| 2000 | WING HQ / OPS | 55 | 164 |
| JOINT VEHICLE MAINTENANCE | |||
| NEW FRONT ENTRANCE GATE | |||
| SECURITY FORCES | |||
| CE STORAGE BARN | |||
| GAS STATION | |||
| POTENTIAL E + I SQUADRON | |||
| ADDITION TO POL OPERATIONS | |||
| LAND ACQUISITION 14 ACRES | |||
| MOBILITY PROCESSING / ADD-ALTER LOGISTICS FACILITY | |||
| NEW OPERATIONS & TRAINING / MEDICAL FACILITY | |||
| HANGAR | |||
| ALERT FACILITY | |||
| TOTAL POPULATION | 390 | 1354 |
&CExisting Buildings & Population summary
| YEAR | Non Resident Daily Population | UTA Population (once /month) |
| Existing Installation | 390 | 1354 |
| 2005-2010 | ||
| 2010-2015 | ||
| 2015-2020 | ||
| 2020-2025 |
FIXTURES COUNT
| BUILDING NUMBER | BUILDING DESCRIPTION | WOMEN | MAN | UNISEX | KITCHEN/ OTHER | DAILY POPULATION | UTA MAXIMUM POPULATION | ||||||||||||||
| LAV. | TOILETS | SHOWER | OTHER | LAVAT. | URINALS | TOILETS | SHOWER | OTHER | LAV. | TOILETS | SHOWER | OTHER | K.SINK | S.SINK | SINK | DR. F. | W/D | 390 | 1354 | ||
| 00004 | 2 | 2 | 2 | 5 | 3 | 3 | 4 | 1 | 2 | 2 | |||||||||||
| 00502 | 2 | 2 | |||||||||||||||||||
| 820 | FIRE STATION | 15 | 40 | ||||||||||||||||||
| 846 | VEHICLE MAINTENANCE | 12 | 30 | ||||||||||||||||||
| 849 | REFUELER MAINTENANCE | 1 | 2 | ||||||||||||||||||
| 872 | CONTRACTING /SUPPLY /TMO | 24 | 120 | ||||||||||||||||||
| 875 | CIVIL ENGINEERING, COMMUNICATIONS, SECURITY FORCES | 65 | 320 | ||||||||||||||||||
| 879 | DELUGE PUMPS | 0 | 0 | ||||||||||||||||||
| 880 | DELUGE TANKS | 0 | 0 | ||||||||||||||||||
| 883 | AIRPLANE HANGER | 9 | 21 | ||||||||||||||||||
| 885 | AIRPLANE HANGER | 70 | 246 | ||||||||||||||||||
| 887 | MPE / FINANCE / CLINIC / SUPPORT GROUP HQ | 40 | 145 | ||||||||||||||||||
| 888 | AIRPLANE HANGER | 80 | 220 | ||||||||||||||||||
| 903 | POL OPERATIONS | 7 | 16 | ||||||||||||||||||
| 911 | RECRUITING / BASE OPS | 7 | 14 | ||||||||||||||||||
| 913 | WEATHER FLIGHT / QUALITY | 1 | 12 | ||||||||||||||||||
| 2000 | WING HQ / OPS | 55 | 164 | ||||||||||||||||||
| JOINT VEHICLE MAINTENANCE | |||||||||||||||||||||
| NEW FRONT ENTRANCE GATE | |||||||||||||||||||||
| SECURITY FORCES | |||||||||||||||||||||
| CE STORAGE BARN | |||||||||||||||||||||
| GAS STATION | |||||||||||||||||||||
| POTENTIAL E + I SQUADRON | |||||||||||||||||||||
| ADDITION TO POL OPERATIONS | |||||||||||||||||||||
| LAND ACQUISITION 14 ACRES | |||||||||||||||||||||
| MOBILITY PROCESSING / ADD-ALTER LOGISTICS FACILITY | |||||||||||||||||||||
| NEW OPERATIONS & TRAINING / MEDICAL FACILITY | |||||||||||||||||||||
| HANGAR | |||||||||||||||||||||
| ALERT FACILITY |