Army CHAPTER 7 SANITARY TABLES-BB.xls

XLS spreadsheet 55 KB Posted

Attached to
RECOVERY DESIGN/BUILD WATERLINE, RICKENBACKER ARMY ENCLAVE, COLUMBUS, OHIO
Solicitation number
W91364-10-R-2000
Issued by

About this file

capacity study documents - TABLES

View the file

Other files

File Type Posted
Army CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.2.pdf PDF
Army Fig. 3.1.pdf PDF
Report Cover.pdf PDF
Fig. 6.1.pdf PDF
Fig. 6.2.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-TABLE 6.1.pdf PDF
Army CHAPTER 6 WATER SYSTEM TABLES-BB.xls XLS spreadsheet
Fig. 7.1.pdf PDF
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.5.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.7.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Exhibit D.doc DOC document
CHAPTER 4 POPULATION TABLES.xls XLS spreadsheet
Report Cover.doc DOC document
MATOC DB Offering Instruction and Evaluation.doc DOC document
CHAPTER 7 SANITARY TABLES TABLE 7.4.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.2.pdf PDF
Table of Contents.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.3.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.6.pdf PDF
20-yr LIFE CYCLE.xls XLS spreadsheet
Fig. 3.1.pdf PDF
CHAPTER 7 SANITARY TABLES TABLE 7.5.pdf PDF
Army Fig. 6.2.pdf PDF
Appendix A-Army.pdf PDF
ANG Report-final.pdf PDF
Army report_final.pdf PDF
utility site drawing.TIF TIF image
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.10.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES.xls XLS spreadsheet
utilities.pdf PDF
Army Fig. 7.1.pdf PDF
rae_water_sow.doc DOC document
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.4.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.9.pdf PDF
Responses to draft report Review Comments .pdf PDF
Army 20-yr LIFE CYCLE.xls XLS spreadsheet
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.4.pdf PDF
Army CHAPTER 6 FIREPROTECTION TABLES-BB.xls XLS spreadsheet
EXHIBIT E.doc DOC document
Army CHAPTER 6 FIREPROTECTION TABLES TABLE 6.3.pdf PDF
Divider Sheets.doc DOC document
CHAPTER 7 SANITARY TABLES.xls XLS spreadsheet
CHAPTER 6 WATER SYSTEM TABLES TABLE 6.1.pdf PDF
CHAPTER 6 FIREPROTECTION TABLES TABLE 6.8pdf.pdf PDF
Army Fig. 6.1.pdf PDF
Army CHAPTER 7 SANITARY TABLES TABLE 7.1.pdf PDF
Appendix A - ANG.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

population PRESENT

TABLE 7.1 PRESENT (2006) SANITARY WASTEWATER FLOW
BUILDING NUMBERBUILDING DESCRIPTIONMAXIMUM NON-RESIDENT UTA POPULATIONMAXIMUM RESIDENT POPULATIONTOTAL POPULATIONAVERAGE SANITARY FLOW (ADF) 0.0002 CFS /CAPITA/DAYAVERAGE SANITARY FLOW (ADF) 130GAL / CAPITA/DAYINDUSTRIAL FLOWAIRCRAFT-WASH FLOW (THREE AIRCRAFT PER WEEK)IRRIGATION FLOWAIR-CONDITIONING FLOWOTHER FLOWTOTAL OTHER DAILY FLOWTOTAL OTHER DAILY FLOWTOTAL DAILY FLOWSTOTAL DAILY FLOWSPEAK SANITARY WASTEWATER FLOWCONTRIBUTING INFILTRATION & INFLOWTOTAL DESIGN FLOW
PEOPLEPEOPLEPEOPLECFSGPDGPDGPDGPDGPDGPDGPDCFSGPDCFSCFSCFSCFS
943TROOP COMMAND/SECURITY FORCES970970.019412,61000000012,6100.01950.06830.0040.072
945JOINT USE TRAINING/BAND880880.017611,44000000011,4400.01770.06200.0020.064
931437th Bn49004900.098063,70000000063,7000.09860.34500.0080.353
930RTI30003000.060039,00000000039,0000.06030.21120.0040.215
922AVN16801680.033621,84003000003000.000022,1400.03430.11990.0020.122
918AVN23302330.046630,29006000006000.000530,8900.04780.16730.0200.187
946WMD0000.0000000000000.00000.00000.0000.000
TOTAL1,37601,3760.275217888009000009000.00051797800.27820.97360.0401.01

population SHORT

TABLE 7.2 SHORT-RANGE (2010-2015) SANITARY WASTEWATER FLOW
0BUILDING DESCRIPTIONMAXIMUM NON-RESIDENT UTA POPULATIONMAXIMUM RESIDENT POPULATIONTOTAL POPULATIONAVERAGE SANITARY FLOW (ADF) 0.0002 CFS /CAPITA/DAYAVERAGE SANITARY FLOW (ADF) 130GAL / CAPITA/DAYINDUSTRIAL FLOWAIRCRAFT-WASH FLOW (THREE AIRCRAFT PER WEEK)IRRIGATION FLOWAIR-CONDITIONING FLOWOTHER FLOWTOTAL OTHER DAILY FLOWTOTAL OTHER DAILY FLOWTOTAL DAILY FLOWTOTAL DAILY FLOWPEAK SANITARY WASTEWATER FLOWCONTRIBUTING INFILTRATION & INFLOWTOTAL DESIGN FLOW
PEOPLEPEOPLEPEOPLECFSGPDGPDGPDGPDGPDGPDGPDCFSGPDCFSCFSCFSCFS
943TROOP COMMAND/SECURITY FORCES970970.019412,61000000012,6100.01950.06830.0040.072
945JOINT USE TRAINING/BAND880880.017611,44000000011,4400.01770.06200.0020.064
931437th Bn49004900.098063,70000000063,7000.09860.34500.0080.353
930RTI30003000.060039,00000000039,0000.06030.21120.0040.215
922AVN16801680.033621,84003000003000.000022,1400.03430.11990.0020.122
918AVN23302330.046630,29006000006000.000530,8900.04780.16730.0020.169
946WMD0000.0000000000000.00000.00000.0000.000
READINESS CENTER40004000.080052,000000000052,0000.08050.28160.0000.282
TOTAL1,77601,7760.3552230,88009000009000.0005231,7800.35861.25520.02201.28

san COSTS

Work RequiredEstimated Costs
CIPP line 650 linear feet of 12" sanitary sewer$80,000
CIPP line 2,225 linear feet of 10" sanitary sewer$243,000
CIPP line 590 linear feet of 8" sanitary sewer$55,700
CIPP line 1,820 linear feet of 6" sanitary sewer$132,000
Cementitious lining 11 manholes$44,000
Total Costs$554,700

File details come from the government source that posted it. Updated .