CRREL Climatic Cold Chambers - IFC Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- W912WJ20B0008
About this file
This federal contract solicitation seeks proposals for the construction of a climatic cold chamber building at the Cold Regions Research and Engineering Laboratory in Hanover, New Hampshire. Key details include construction of a 4,800 square foot pre-engineered metal building to house climatic chambers and support spaces. The solicitation was issued by the U.S. Army Corps of Engineers Engineering District New England. The anticipated award date is listed as March 2020 with construction completion expected by December 2020. Pricing is to be provided using fixed unit pricing and lump sum bids. There are no set-aside provisions or incumbent mentioned.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03/13/20
NS ED
ECIL
BENJAMIN C.
TOWNSEND
No. 13287
OFETAT
S
MAINE
N LAOISSEF
O
R P
ENG
IN
E E R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
G-001
C O
V E
R S
H E
E T
C O
L D
R E
G
IO
N S
R E
S E
A R
C H
A N
D E
N G
IN
E
E R
IN
G
L A
B O
R A
T O
R Y
C L
IM
A T
IC
C
O L D
C H
A M
B E
R
H A
N O
V E
R N
H N
E W
E N
G L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C
O N
C O
R D
M A
C O
L B
Y C
O M
P A
N Y
L L C
A
Y O
R K
S T
R E
E T
P
O R
T L A
N D
M E
C A
P
C A
P
B C
T
R T
M
/1
/2
W W
J B
W W
J -1
-D
-0
VICINITY MAP
SCALE: NTS
A
TLA
N
TIC
O C
EA
N
CANADA
STATE OF
MAINE
STATE OF
VERMONT
PROJECT SITE
SITE LOCATION
SCALE: NTS
COLD REGIONS RESEARCH AND ENGINEERING
LABORATORY CLIMATIC COLD CHAMBER
HANOVER, NH
NEW ENGLAND DISTRICT
696 VIRGINIA ROAD, CONCORD MA
SOLICITATION# W912WJ20B0014
PROJECT SITE
L Y
M E
R O
A D
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/1
/2
03/13/20
NS ED
ECIL
BENJAMIN C.
TOWNSEND
No. 13287
OFETAT
S
MAINE
N LAOISSEF
O
R P
ENG
IN
E E R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
G-002
D R
A W
IN
G
I N
D E
X
C O
L D
R E
G
IO
N S
R E
S E
A R
C H
A N
D E
N G
IN
E
E R
IN
G
L A
B O
R A
T O
R Y
C L
IM
A T
IC
C
O L D
C H
A M
B E
R
H A
N O
V E
R N
H N
E W
E N
G L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C
O N
C O
R D
M A
C O
L B
Y C
O M
P A
N Y
L L C
A
Y O
R K
S T
R E
E T
P
O R
T L A
N D
M E
C A
P
C A
P
B C
T
R T
M
/1
/2
W W
J B
W W
J -1
-D
-0
DRAWING INDEX
DRAWING TITLE
G-001 COVER SHEET
G-002 DRAWING INDEX
G-003 GENERAL ARRANGEMENT
G-101 SITE ACCESS PLAN
LS-101 FIRST FLOOR - LIFE SAFETY PLAN
C-001 CIVIL GENERAL NOTES
CD-101 SITE DEMOLITION PLAN
C-101 SITE PLAN
C-102 SITE GRADING AND EROSION CONTROL PLAN
C-501 EROSION AND SEDIMENTATION CONTROL NOTES
C-502 EROSION AND SEDIMENTATION CONTROL DETAILS
C-503 CONSTRUCTION DETAILS
S-001 GENERAL STRUCTURAL NOTES & ABBREVIATIONS
S-101 FOUNDATION PLAN
S-102 SLAB PLAN
S-301 FOUNDATION SECTIONS
S-501 TYPICAL STRUCTURAL DETAILS
S-502 TYPICAL STRUCTURAL DETAILS
A-001 ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS
A-002 TYPICAL MOUNTING HEIGHTS AND CLEARANCES
A-101 GROUND FLOOR PLAN
A-102 REFRIGERATION ROOF PLAN
A-103 OVERALL ROOF PLAN
A-104 OVERALL REFLECTED CEILING PLAN
A-201 WEST ELEVATION
A-202 NORTH ELEVATION
A-203 EAST ELEVATION
A-204 SOUTH ELEVATION
A-301 BUILDING SECTION
A-302 BUILDING SECTIONS
A-303 BUILDING SECTION
A-304 BUILDING SECTION
A-310 WALL SECTIONS
A-501 DETAILS
A-601 DOOR SCHEDULE, FINISH SCHEDULE, PARTITION SCHEDULE
A-602 DOOR & LOUVER DETAILS
A-901 PERSPECTIVE VIEWS
FA-001 FIRE ALARM LEGEND, ABBREVIATIONS AND GENERAL NOTES
FA-101 GROUND FLOOR FIRE ALARM PLAN
P-001 PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES
P-101 GROUND FLOOR PLUMBING PLAN
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
M-001 MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES
M-101 GROUND FLOOR MECHANICAL PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROL SEQUENCES
E-001 GENERAL NOTES, LEGEND AND ABBREVIATIONS
ES-101 ELECTRICAL SITE PLAN
E-101 GROUND FLOOR POWER PLAN
E-102 GROUND FLOOR LIGHTING PLAN
E-501 ONE LINE DIAGRAM AND LIGHT FIXTURE SCHEDULE
E-502 ELECTRICAL DETAILS
E-601 PANEL SCHEDULES
E-602 PANEL SCHEDULES
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/1
/2
DN
DN
CBA D
STAGING
ENCLOSURE
/2
/2
76' - 3"
/2
/2
IT
PREFAB OFFICE
PREFAB
SHOWER
MECHANICAL
400 SF STORAGE
FENCED W/ DOUBLE GATE
24' - 0" 6"
13' - 0"
7' - 8"
23' - 8" 22' - 0"
7' - 6"
8' - 0" 16' - 0"
CONCRETE DRIVING PAD
CONCRETE DRIVING PAD
COLD CHAMBER
VESTIBULE
REFRIGERATION CONDENSERS
PROVIDED WITH COLD
CHAMBER PACKAGE
REFRIGERATION EQUIPMENT
PROVIDED WITH COLD
CHAMBER PACKAGE
CLR MIN.
8' - 0"
C L R
M
IN
PLUMBING
ACCESS
UTILITY
8" F.F.
6" F.F.
6" F.F.
8" F.F.
1' - 3 1/2" 23' - 10" 23' - 10" 26' - 0"
STEEL VEHICULAR
RAMP 1 1/2":12"
SLOPE
14' - 0"
9' - 0"
NOTES:
1. COLD CHAMBER PACKAGED UNIT TO
INCLUDE RAMP, LIGHTING, DOORS,
FLOOR, CEILING, WALLS, &
ELECTRICAL FEEDS. REFERENCE
SPECIFICATION 112000.
2. PREFAB SHOWER TO INCLUDE ABA
SHOWER, ABA TOILET, ABA SINK,
LIGHTING, DOORS, FINISHES, FLOOR,
CEILING, INSULATED ROOF, INSULATED
WALLS, MECHANICAL EQUIPMENT &
ELECTRIC FEEDS. ABA RAMP & STAIRS
TO BE PROVIDED WITH PACKAGE.
REFERENCE SPECIFICATION 110100.
3. PREFAB OFFICE TO INCLUDE LIGHTING,
DOORS,FINISHES, FLOOR, CEILING,
INSULATED ROOF, INSULATED WALLS,
MECHANICAL EQUIPMENT &
ELECTRICAL FEEDS. REFERENCE
SPECIFICATION 110100.
4. REFERENCE D3/A-501 FOR ALL PIPE
PENETRATIONS AT METAL PANEL WALL
FOR COLD CHAMBER CONNECTIONS
BETWEEN CHAMBER EQUIPMENT &
REFRIGERATION CONDENSERS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
G-003
G E
N E
R A
L A
R R
A N
G E
M E
N T
C O
L D
R E
G
IO
N S
R E
S E
A R
C H
A N
D E
N G
IN
E
E R
IN
G
L A
B O
R A
T O
R Y
C L
IM
A T
IC
C
O L D
C H
A M
B E
R
H A
N O
V E
R N
H N
E W
E N
G L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C
O N
C O
R D
M A
C O
L B
Y C
O M
P A
N Y
L L C
A
Y O
R K
S T
R E
E T
P
O R
T L A
N D
M E
C A
P
C A
P
B C
T
R T
M
/1
/2
W W
J B
W W
J -1
-D
-0
3/16" = 1'-0"A1
GENERAL ARRANGEMENT
SCALE:
3/16" = 1' - 0"
4' 4' 8' 12'
PLAN NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/1
/2
L y m e
R o a d
R o u t e
CONTRACTOR SITE ACCESS
CONTRACTOR ACCESS PATH
CONTRACTOR LAYDOWN AREA
PROJECT WORK AREA
STOCKPILE AREA (MATERIAL
WAITING TO BE TESTED)
PROJECT SITE
0 60' 120'
Scale: 1" = 60'-0"
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
T
F I
E
U M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
A M
E
S
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
C O
D
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
I S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
M
C O
L B
Y
C
O M
P A
N Y
L
L C
Y
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
KEYED NOTES:
SOIL STOCKPILE AREA, SEE SPECIFICATION
02 61 13 FOR SOIL TESTING AND HANDLING
REQUIREMENTS, AND 02 81 00 FOR
TRANSPORTATION AND HANDLING OF
CONTAMINATED MATERIAL REQUIREMENTS.
LOCATION TO BE CONFIRMED WITH CRREL.
SCALE: 1"=60'-0"
SITE ACCESS PLANA1
G-101
S I T
E
A
C C
E S
S
P
L A
N
Z R
J
Z R
J
B C
T
C B
G D
W
NS ED
ECIL
BRUCE
BUNDY
No. 16161
OFETAT
S
MAIN
E
N LAOISSE
F O
R P
ENG
IN
E E R
AARON
F
FACP
C
D
W P
C
D
C
D
60CD
LT,XP
F
30CD
LT,XP
F
110CD
WP
110CD
WP
C
D
W P
110CD
WP
C
D
W P
110CD
C
D
W P
C
D
W P
F
DN
DN
CBA D
AREA SERVED= 97'-0"
EXIT SEPARATION DISTANCE= 82'-9"
C O
M M
O N
P A
T H
TRAVEL DISTANCE=64'-6"
T R
A V
E L D
IS
T
A N
C E
COMMON PATH=40'-9"
C O
M M
O N
P A
T H
TRAVEL DISTANCE=73'-3"
T R
A V
E L D
IS
T
A N
C E
STAGING
ENCLOSURE
COLD CHAMBER
PREFAB OFFICE
PREFAB
SHOWER
KB
IT
MECHANICAL
VESTIBULE
COMMON PATH 23'-6"TRAVEL DISTANCE=92'-0"
FENCED STORAGE
FE
TRAVEL DISTANCE=54'-9"
TRAVEL DISTANCE=145'-9" T
R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
LEGEND
TRAVEL PATHS
KB
FACP
F
KEY BOX
FIRE ALARM CONTROL PANEL
MANUAL PULL STATION
75 HORN/STROBE NOTIFICATION
APPLIANCE
EXIT SIGN, WALL MOUNTED
COMMON PATH
SPECIAL INDUSTRIAL
NON-SPRINKLERED
MAXIMUM ACTUAL
AREA EXEMPT
IBC BUILDING REQUIREMENTS
CONSTRUCTION TYPE IIB, II (000)
NON-SPRINKLERED
OCCUPANCY CLASSIFICATION:
IBC: GROUP F-1, MODERATE HAZARD FACTORY INDUSTRIAL,
SPECIAL PURPOSE INDUSTRIAL PER 503.1.1.
NFPA 101: SPECIAL PURPOSE INDUSTRIAL
SPECIAL INDUSTRIAL
NON-SPRINKLERED
REQUIRED ACTUAL
TRAVEL DISTANCE 300' MAXIMUM 105'-0"
NFPA 101 EGRESS REQUIREMENTS
4835 SF
STORIES EXEMPT 1
HEIGHT EXEMPT 28'-3"
OCCUPANT LOAD (NFPA 101) = 10 OCCUPANTS
OCCUPANCY: SPECIAL PURPOSE INDUSTRIAL
COMMON PATH 50' MAXIMUM 40'-9"
DEAD END 50' MAXIMUM 23'-6"
EXIT SEPARATION VS
DIAGONAL
EXIT SEPARATION
AREA SERVED
NOT LESS THAN 1/2
DIAGONAL DIMENSION
82'-9" 97'-0"
EXIT DOOR
CAPACITY
OCC.x.0.2"=MIN.
36" MIN.
10*.0.2=2"
36" IN
ELECTRICAL
(36*2)72" IN
STORAGE
FE FIRE EXTINGUISHER (NOT
IN CONTRACT)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
LS-101
F
IR
S T
F L O
O R
L
IF
E S
A F
E T
Y P
L A
N
C O
L D
R E
G
IO
N S
R E
S E
A R
C H
A N
D E
N G
IN
E
E R
IN
G
L A
B O
R A
T O
R Y
C L
IM
A T
IC
C
O L D
C H
A M
B E
R
H A
N O
V E
R N
H N
E W
E N
G L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C
O N
C O
R D
M A
C O
L B
Y C
O M
P A
N Y
L L C
A
Y O
R K
S T
R E
E T
P
O R
T L A
N D
M E
C A
P
C A
P
B C
T
R T
M
/1
/2
W W
J B
W W
J -1
-D
-0
1/4" = 1'-0"A1
LIFE SAFETY PLAN
SCALE:
0 4' 8'
1/4" = 1' - 0"
4' 8'
PLAN NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/1
/2
UTILITY NOTES
1. THE CONTRACTOR MUST BE RESPONSIBLE FOR PROVIDING ALL FIELD LAYOUT. THE CONTRACTOR MUST RECORD TIES TO ALL UTILITY CONNECTIONS AND PROVIDE MARKED-UP RECORD DRAWINGS FOR ALL PROPOSED UTILITIES SHOWING
TIES TO CONNECTIONS, BENDS, VALVES, LENGTHS OF LINES AND INVERTS.
2. THE CONTRACTING OFFICER MUST BE NOTIFIED IN WRITING OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK MUST NOT VARY FROM THE PLANS WITHOUT THE EXPRESSED WRITTEN
APPROVAL FROM THE CONTRACTING OFFICER.
3. THE CONTRACTOR MUST COORDINATE AND COOPERATE WITH ANY AND ALL OTHER CONTRACTORS PERFORMING WORK
THAT IMPACTS THIS PROJECT.
4. THE CONTRACTOR MUST RESTORE ROADWAYS, LAWNS, DRIVEWAYS, FENCES, CULVERTS, SIGNS AND OTHER PUBLIC OR PRIVATE PROPERTY DAMAGED OR REMOVED BY THE CONTRACTOR TO PRE-CONSTRUCTION CONDITION OR BETTER, AS DETERMINED BY THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. ANY DAMAGED TREES, SHRUBS AND/OR
HEDGES MUST BE REPLACED AT THE CONTRACTOR'S EXPENSE.
6. THE CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING, OBTAINING, AND INCURRING THE COST OF ALL
REQUIRED PERMITS, INSPECTIONS, AND CERTIFICATES IN SUPPORT OF THIS PROJECT.
7. THE CONTRACTOR MUST COMPLY WITH ALL REQUIRED PERMITS.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE ALL PLAN SHEETS AND SPECIFICATIONS, AND COORDINATE
WORK WITH ALL CONTRACTS FOR THE SITE.
9. THE CONTRACTOR MUST CONDUCT EXPLORATORY TEST PITS AS MAY BE REQUIRED TO DETERMINE UNDERGROUND
CONDITIONS.
10. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE MAINTENANCE OF SURFACE DRAINAGE AND EROSION AND
SEDIMENTATION CONTROLS DURING THE COURSE OF WORK.
11. THE CONTRACTOR MUST GRADE ALL DISTURBED AREAS ON THE SITE TO PROVIDE POSITIVE DRAINAGE.
12. THE CONTRACTOR MUST PROVIDE A DETAILED SCHEDULE OF WORK TO THE CONTRACTING OFFICER. WORK MUST BE COORDINATED TO MINIMIZE DISTURBANCE TO ONGOING OPERATIONS. WATER OUTAGES WILL NOT BE ALLOWED.
13. CONTRACTOR MUST MAKE THEMSELVES FAMILIAR WITH SPECIFICATION 01 35 26 SECTION 1.6, WORKING IN AND AROUND
SOIL THAT IS KNOWN TO HAVE POTENTIAL TCE CONTAMINATION.
GENERAL NOTES
CONSTRUCTION NOTES
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
A. WASTE MATERIALS
ALL WASTE MATERIALS MUST BE COLLECTED AND STORED IN SECURELY LIDDED RECEPTACLES. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE MUST BE DEPOSITED IN A DUMPSTER. CONSTRUCTION WASTE MATERIALS MUST NOT BE BURIED ON SITE. ALL PERSONNEL MUST BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL BY THE SUPERINTENDENT. ALL DEMOLISHED MATERIALS ARE THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER. DISPOSE OF ALL DEMOLISHED MATERIALS OFF-SITE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS AND REGULATIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
B. HAZARDOUS WASTE
ALL HAZARDOUS WASTE MATERIALS MUST BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL MUST BE INSTRUCTED IN THESE PRACTICES BY THE
SUPERINTENDENT.
C. SANITARY WASTE
ALL SANITARY WASTE MUST BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONCE PER WEEK BY A
LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR.
D. PRODUCT SPECIFICATION PRACTICES
THE FOLLOWING PRODUCT SPECIFIC PRACTICES MUST BE FOLLOWED ON SITE:
1.PETROLEUM PRODUCTS:
ALL ON SITE VEHICLES MUST BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE LEAKAGE. PETROLEUM PRODUCTS MUST BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT BASED SUBSTANCES USED ON SITE MUST BE APPLIED ACCORDING TO THE
MANUFACTURER'S RECOMMENDATIONS.
2.FERTILIZERS:
FERTILIZERS USED MUST BE APPLIED ONLY IN THE MINIMUM AMOUNTS DIRECTED BY THE SPECIFICATIONS. ONCE APPLIED FERTILIZER MUST BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORMWATER. STORAGE MUST BE IN A COVERED SHED OR ENCLOSED TRAILERS. THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER MUST BE
TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS.
3.PAINTS:
ALL CONTAINERS MUST BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT MUST NOT BE DISCHARGED TO THE STORM SEWER SYSTEM BUT MUST BE DISPOSED OF PROPERLY ACCORDING TO
MANUFACTURER'S INSTRUCTIONS OR STATE AND LOCAL REGULATIONS..
WASTE DISPOSAL
IN ADDITION TO GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTION
THE FOLLOWING PRACTICES MUST BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
1. MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP MUST BE CLEARLY POSTED AND SITE PERSONNEL MUST BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEANUP SUPPLIES.
2. MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP MUST BE KEPT IN THE MATERIAL STORAGE AREA ON SITE. EQUIPMENT AND MATERIALS MUST INCLUDE BUT NOT BE LIMITED TO BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, KITTY LITTER, SAND, SAWDUST AND PLASTIC OR METAL TRASH CONTAINERS SPECIFICALLY FOR
THIS PURPOSE
3. ALL SPILLS MUST BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
4. THE SPILL AREA MUST BE KEPT WELL VENTILATED AND PERSONNEL MUST WEAR APPROPRIATE PROTECTIVE
CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.
5. SPILLS OF TOXIC OR HAZARDOUS MATERIAL MUST BE REPORTED TO THE APPROPRIATE STATE OR LOCAL
GOVERNMENT AGENCY, REGARDLESS OF THE SIZE.
6. THE SPILL PREVENTION PLAN MUST BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM RECURRING AND HOW TO CLEANUP THE SPILL IF IT RECURS. A DESCRIPTION OF THE SPILL, ITS CAUSE, AND THE
CLEANUP MEASURES MUST BE INCLUDED.
7. THE SITE SUPERINTENDENT RESPONSIBLE FOR DAY-TO-DAY SITE OPERATIONS MUST BE THE SPILL PREVENTION AND
CLEANUP COORDINATOR.
SPILL CONTROL PRACTICES
1. EFFORTS SHOULD BE MADE TO PERFORM EQUIPMENT/ VEHICLE FUELING AND MAINTENANCE AT AN OFF-SITE FACILITY.
2. IF OFF-SITE FACULTIES FROM NOTE 1 CANNOT BE ESTABLISHED, THE CONTRACTOR MUST PROVIDE A CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPROVED ON-SITE FUELING AND MAINTENANCE AREA THAT IS CLEAN AND DRY.
3. IF POSSIBLE KEEP AREA COVERED.
4. KEEP A SPILL KIT AT THE FUELING AND MAINTENANCE AREA.
5. VEHICLES MUST BE INSPECTED REGULARLY FOR LEAKS AND DAMAGE.
6. USE DRIP PANS, DRIP CLOTHS, OR ABSORBENT PADS WHEN REPLACING SPENT FLUID.
7. VEHICLES MUST BE INSPECTED FOR LEAKS ON A DAILY BASIS PRIOR TO ARRIVAL ON-SITE. THE CONTRACTOR SHALL MAINTAIN A VEHICLE INSPECTION LOG AT THE JOB SITE AVAILABLE AT THE CONTRACTOR'S JOB TRAILER DOCUMENTING THE DAILY INSPECTIONS AND ANY ISSUES OR MAINTENANCE PERFORMED DOCUMENTED IN THE LOG. SEE SPECIFICATION 01 57 20.
VEHICLE FUELING AND MAINTENANCE PRACTICES:
1. THE CONTRACTOR MUST COORDINATE MATERIAL STORAGE AND LAYDOWN AREAS WITH THE CONTRACTING OFFICER.
LIMITED PARKING FOR CONTRACTOR EMPLOYEES WITHIN THE PROJECT SITE WILL BE PERMITTED WITH THE APPROVAL OF
THE CONTRACTING OFFICER.
2. THE CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING TRAFFIC FLOW DURING CONSTRUCTION MAINTAINING EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING PROGRESS OF THE WORK WHERE POSSIBLE.
PROVIDE ADDITIONAL SIGNAGE AS NECESSARY TO DIRECT VEHICLES AND PEDESTRIANS AROUND CONSTRUCTION SITE.
3. THE CONTRACTOR MUST COMPLY WITH ALL APPLICABLE O.S.H.A., EM 385-1-1, REGULATIONS AND SAFETY REQUIREMENTS.
4. CONTRACTOR MUST PROVIDE A NEW HAMPSHIRE STATE LICENSED SURVEYOR ON SITE CAPABLE OF PROVIDING
HORIZONTAL (STATE PLANE COORDINATE SYSTEM) AND VERTICAL CONTROL (NAVD 1988).
5. ALL SURPLUS MATERIAL, AS DETERMINED BY THE CONTRACTING OFFICER, MUST BECOME THE PROPERTY OF THE
CONTRACTOR AND MUST BE DISPOSED OF OFF THE SITE.
6. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH VELOCITY WINDS AND BE PREPARED BY A
PROFESSIONAL SIGN COMPANY.
7. THE EXPOSED SOIL SURFACE MUST BE MOISTENED PERIODICALLY WITH ADEQUATE WATER TO CONTROL DUST. EXPOSED SOIL SURFACES MUST BE MINIMIZED TO LIMIT EROSION. CONTRACTOR MUST COMPLY WITH NHDES CONSTRUCTION ACTIVITIES BEST MANAGEMENT PRACTICES (BMPs) AT ALL TIMES.
8. THE CONTRACTOR MUST BE RESPONSIBLE TO MAKE THE SITE SAFE FOR USERS AT ALL TIMES. INSTALL BARRIERS, SIGNS
AND OTHER MEANS AS REQUIRED TO MAKE THE SITE SAFE.
9. THE CONTRACTOR MUST FLUSH AND DISINFECT WATER MAINS IN ACCORDANCE WITH AWWA C651 REQUIREMENTS.
10. CONTRACTOR MUST DEVELOP AN EXCAVATION PLAN FOR ALL TRENCHING OPERATIONS. EXCAVATION PLAN MUST BE IN
ACCORDANCE WITH ALL OSHA REQUIREMENTS AND EM 385-1-1.
11. PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT. FIELD ADJUSTMENTS TO FINAL
GRADES MAY BE NECESSARY. ENSURE POSITIVE DRAINAGE IN AREAS TO BE PAVED.
1. EXISTING UTILITIES SHOWN ON THE PROJECT DRAWINGS ARE LOCATED APPROXIMATELY AND MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE REPAIRS OF ALL
DAMAGED UTILITIES DURING CONSTRUCTION AT NO COST TO THE GOVERNMENT.
2. THE CONTRACTOR MUST ARRANGE FOR ANY TEMPORARY UTILITY CONNECTIONS THAT MAY BE REQUIRED DURING
CONSTRUCTION.
3. EXISTING UTILITIES TO REMAIN IN OPERATION MUST BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UTILITIES TO REMAIN MUST BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.
4. THE CONTRACTOR IS RESPONSIBLE FOR CALLING DIG-SAFE 72 HOURS PRIOR TO COMMENCEMENT OF EXCAVATION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING PRIVATELY OWNED UTILITIES ON SITE. COST FOR LOCATING UTILITIES
WITHIN THE PROJECT AREA IS THE CONTRACTOR'S RESPONSIBILITY.
5. WHERE CONTRACTOR ENCOUNTERS EXISTING INACTIVE UTILITY PIPES OR CONDUIT WITHIN THE LIMIT OF EXCAVATION FOR THE WORK OF THE PROJECT, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
CONTRACTOR MUST REMOVE THE PIPES AND/OR CONDUIT, WITHIN THOSE LIMITS OF EXCAVATION THAT ARE NO LONGER REQUIRED TO BE ACTIVE. AT LIMITS OF EXCAVATION, PLUG AND ABANDON REMAINING PIPES AND CONDUITS IN PLACE.
6. CONTRACTOR MUST PROVIDE HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES ENCOUNTERED OR ABANDONED ON
RECORD DRAWINGS AT THE COMPLETION OF WORK.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL DUST THROUGHOUT THE CONSTRUCTION PERIOD. DUST CONTROL METHODS MUST INCLUDE, BUT BE NOT LIMITED TO, SPRINKLING WATER ON EXPOSED AREAS, COVERING LOADED DUMP TRUCKS LEAVING THE SITE, AND TEMPORARY MULCHING. DUST CONTROL MEASURES MUST BE UTILIZED SO AS TO PREVENT THE MIGRATION OF DUST FROM THE SITE TO ABUTTING AREAS. FUGITIVE DUST MUST BE CONTROLLED IN ACCORDANCE WITH NHDES EROSION AND SEDIMENTATION CONTROL BEST PRACTICES.
DUST CONTROL:
1. THE CONCRETE CONTRACTOR SHOULD BE ENCOURAGED WHERE POSSIBLE, TO USE WASHOUT FACILITIES AT THEIR OWN PLANT
OR DISPATCH FACILITY.
2. IF IT IS NECESSARY, SITE CONTRACTOR MUST DESIGNATE SPECIFIC WASHOUT AREAS AND DESIGN FACILITIES TO HANDLE
ANTICIPATED WASHOUT WATER.
3. WASHOUT AREAS MUST ALSO BE PROVIDED FOR PAINT AND STUCCO OPERATIONS.
4. ATTEMPTS MUST BE MADE TO LOCATE WASHOUT AREA A LEAST 50 YARDS AWAY FROM STORM DRAINS AND WATER WAYS
WHENEVER POSSIBLE.
5. INSPECT WASHOUT FACILITIES DAILY TO DETECT LEAKS OR TEARS AND TO IDENTIFY WHEN MATERIALS NEED TO BE REMOVED.
CONCRETE WASHOUT AREA:
1. DISCHARGES FROM FIRE-FIGHTING ACTIVITIES
2. FIRE HYDRANT FLUSHINGS
3. WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED
4. WATER USED TO CONTROL DUST
5. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS
6. ROUTINE EXTERNAL BUILDING WASH DOWN -NO DETERGENTS
7. PAVEMENT WASH WATERS -NO SPILLS OR DETERGENTS
8. UNCONTAMINATED AIR CONDITIONING/COMPRESSOR CONDENSATE
9. UNCONTAMINATED GROUND WATER OR SPRING WATER
10. FOUNDATION OR FOOTING DRAINS -NOT CONTAMINATED
11. LANDSCAPE IRRIGATION
ALLOWABLE NON-STORMWATER DISCHARGES:
THE PROJECT MUST MEET THE REQUIREMENTS AND INTENT OF NH RSA 430:53 AND NH
DEPT. OF AGRICULTURE AGR 3800 RELATIVE TO INVASIVE SPECIES.
INVASIVE SPECIES:
C-001
C I V
N
E R
T
E S
Z R
J
Z R
J
L D
A
C
D
W
SAWCUT AND REMOVE
EXISTING ±6" THICK
CONCRETE SLAB, ±13,400 SF
EXISTING CHAIN LINK FENCE TO BE
DEMOLISHED BY OTHERS PRIOR TO
CONTRACTOR MOBILIZATION ON
SITE.
SAWCUT AND REMOVE EXISTING
ASPHALT PAVING, ±335 SF
SAWCUT AND REMOVE EXISTING
ASPHALT PAVING, ±140 SF
REMOVE GRASS AND TOPSOIL FOR
ASPHALT ENTRANCE, ±1,450 SF
LEAN-TO AND SHED TO BE
DEMOLISHED BY OTHERS
PRIOR TO CONTRACTOR
MOBILIZATION ON SITE.
INSTALL INLET PROTECTION PRIOR TO
DEMOLITION
A1 C-502
LIMIT OF CONCRETE SAWCUT
N:44,7370.51 E:823,691.92
LIMIT OF CONCRETE SAWCUT
N:447,356.87 E:823,726.16
LIMIT OF CONCRETE SAWCUT
N:447,316.14 E:823,709.93
LIMIT OF CONCRETE SAWCUT
N:447,285.22 E:823,787.54
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
0 20' 40'
Scale: 1" = 20'-0"
SCALE 1"=20'-0"
SITE DEMOLITION PLANA1
CD-101
S I T
E
D
E M
O L
I T
I O
N
P
L A
N
Z R
J
Z R
J
L D
A
C
D
W G
KEYED NOTES:
DEMOLISH AND DISPOSE OF HAZARDOUS MATERIALS SHED
SHED MEASURES 11'-8" EXTERIOR (10'-8" INTERIOR) BY 8'-8"
EXTERIOR (7'-8" INTERIOR) X 8'-9" TALL (INTERIOR) AND
CONSISTS OF FOLLOWING:
· CONCRETE FLOOR
· PAINTED GYP WALLS
· METAL DOOR (6'-8", 34" WIDTH)
· VINYL COVE BASE
· SHELVING ON 2X4S
· TWO LIGHT FIXTURES (CLG MOUNTED) -
· ELECTRIC UNIT HEATER
· ELECTRICAL PANEL
· TWO ROOF VENTS
· ONE WINDOW (3'X4')
DEMOLISH AND DISPOSE OF WOOD FRAMED SHED (BY OTHERS
PRIOR TO CONTRACTOR MOBILIZATION TO THE SITE)
SHED MEASURES 15'X11'X7' TALL (INTERIOR DIMENSIONS) AND
CONSISTS OF THE FOLLOWING:
· VINYL FLOORING
· PLYWOOD SHEATHING
· WINDOW
· FOUR LIGHT FIXTURES
· WIREWAYS WITH OUTLETS THROUGHOUT
· ROOF SHINGLES
· ELECTRICAL PANEL (OUT OF SERVICE)
PROTECT T.C.E. EXTRACTION WELL BUILDINGS, WELLS, WATER
LINES, AND ELECTRICAL LINES DURING CONSTRUCTION.
NOTES:
1. SEE SHEET C-101 FOR HORIZONTAL AND VERTICAL BENCHMARKS.
2. HAZARDOUS MATERIAL SCREENING OF THE TWO SHEDS TO BE
DEMOLISHED FOUND THE LIGHTING FIXTURES IN BOTH SHEDS TO
CONTAIN MERCURY. NO OTHER HAZARDOUS MATERIALS (ACM,
LEAD, PCBs) WERE IDENTIFIED.
PROPERTY LINE
PROPOSED
35'x70' CONCRETE
PAD EXTENSION
ASPHALT PATCH, ±335 SF
PROPOSED ASPHALT
ENTRANCE, ±1,810 SF
2" WATER SERVICE WITH
CURB STOP
6" PVC SDR 35 SANITARY SEWER LINE INV. : 454.19 (VIF)
CONNECT TO EXISTING 10" CAST IRON (VIF) SANITARY
SEWER MAIN
RE-ROUTE EXISTING RISER AND
PROVIDE NEW SINGLE 4" CONDUIT
TO SECTIONALIZING CABINET.
PROVIDE NEW 13.2KV - 480/277V TRANSFORMER AND PRE-CAST
CONCRETE TRANSFORMER PAD, SEE ELECTRICAL ONE-LINE ON E-501
(2) x 5" CONCRETE ENCASED
DUCT BANK FOR
ELECTRICAL SERVICE.
WATER SERVICE
ENTRANCE LOCATION
N: 447,219.20 E: 823,711.92
(2) x 5" CONCRETE ENCASED DUCT
BANK FOR SCADA/ FIBER SERVICE.
REPLACE ASPHALT
PAVING, ±140 SF
ASPHALT PAVING, ±4,000 SF
PIER FOUNDATION (TYPE P3) FOR
MECHANICAL EQUIPMENT, SEE SHEET
S-502 (TYP. x8), COORDINATE PIER LAYOUT
WITH EQUIPMENT MANUFACTURER
CONNECT TO
EXISTING 6" DUCTILE
IRON WATER MAIIN
PROPOSED 4,800 SF BUILDING
FFE: 467.50
C5 C-503
C5 C-503
A1 C-503
C1 C-503
B3 C-503
B1 C-503
C1 S-502
C5 C-503
A4 C-503
PROVIDE THREE PHASE
SECTIONALIZING CABINET. SEE
ELECTRICAL ONE-LINE ON E-501.
C1 C-503
PROVIDE SINGLE NEW 4" CONDUIT
FROM SECTIONALIZING CABINET TO
EXISTING CONDUIT RUN.
C5 C-503
BOLLARD (TYP. x11) C4 C-503
COLUMN GRID INTERSECTION
LOCATION A.1:
N:447,244.79 E:823,649.48
COLUMN GRID INTERSECTION
LOCATION D.3:
N:447,274.97 E: 823,740.80
EDGE OF CONCRETE PAD
N:447,354.63 E:823,813.53
BUILDING CORNER
N:447,168.55 E:823,810.08
C3 C-503
SAW CUT OR FORM CONTROL
JOINTS IN ACCORDANCE WITH
ACI 224.3R RECOMMENDATIONS
A2 C-503
(3) x 5" CONCRETE ENCASED
DUCT BANK FOR
ELECTRICAL SERVICE.
C5 C-503
A1 C-503
TEMPORARY BENCHMARK:
TOP BONNET BOLT ON NORTHEAST
SIDE OF HYDRANT.
ELEVATION: 469.78
N: 447,177.19 E: 823,623.34
SANITARY SEWER CLEANOUT
SANITARY SEWER INV.: 463.50
CONCRETE/BITUMINOUS
PAVING JOINT, TYP.
B5 C-503
A4 C-503
0 20' 40'
Scale: 1" = 20'-0"
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
NOTES:
1. SEE SPECIFICATION 02 61 13 FOR SOIL TESTING AND HANDLING
REQUIREMENTS, AND 02 81 00 FOR TRANSPORTATION AND
HANDLING OF CONTAMINATED MATERIAL REQUIREMENTS
KEYED NOTES:
A SEPARATELY AWARDED PROJECT WILL PROVIDE SCADA/
FIBER PATHWAYS TO APPROXIMATELY THIS LOCATION.
CONTRACTOR TO LOCATE AND INTERCEPT TWO OF THE
EXISTING PATHWAYS PREVIOUSLY INSTALLED AND CONTINUE
TO PROPOSED BUILDING.
SINGLE ABA COMPLIANT PARKING SPACE
LOAM AND SEED ALL DISTURBED AREAS, SEE "INSTALLATION-
MAINTENANCE AND INSPECTION PROCEDURES OF EROSION
AND SEDIMENT CONTROLS" SECTIONS J & K, SHEET C-501
SCALE: 1"=20'-0"
SITE PLANA1
C-101
S I T
E
P
L A
N
Z R
J
Z R
J
L D
A
C
D rim:467.68' rim:465.95' inv.:462.0'
UG
E
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
W
#17 #16
UGE
UGE
UGE
W
W
UGE
UGE
UG
E
UGE
UG
E
UG
E
UG
E
UG
E
W
W
W
W
468 468
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S=0.05%
S= 2.0
S= 3.3
S= 2.9
S= 3.2
S=3.2%
S= 2.5
S= 2.5
467.50
467468
467.10
467.90
467.50
467.50
467.40
467.20
467.50
PROPOSED 4,800 SF BUILDING
FFE: 467.50
INLET
PROTECTION
SILT FENCE
(TYP. x ±280 LF )
A1 C-502
C1, C3 C-502
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
0 20' 40'
Scale: 1" = 20'-0"
NOTES:
1. SEE SPECIFICATION 02 61 13 FOR SOIL TESTING AND HANDLING
REQUIREMENTS, AND 02 81 00 FOR TRANSPORTATION AND
HANDLING OF CONTAMINATED MATERIAL REQUIREMENTS
SCALE: 1"=20'-0"
SITE GRADING AND EROSION CONTROL PLANA1
C-102
S I T
E
G
R A
D I N
G
A
O
S I O
N
C
O N
T R
A
N
Z R
J
Z R
J
L D
A
C
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
SEQUENCE OF MAJOR ACTIVITIES
THE CONSTRUCTION SEQUENCE MUST LIMIT THE DURATION AND AREA OF DISTURBANCE.
1. CONSTRUCT TEMPORARY AND PERMANENT SEDIMENT, EROSION CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED PRIOR TO ANY EARTH MOVING OPERATIONS THAT MUST INFLUENCE STORMWATER RUNOFF SUCH AS
- NEW CONSTRUCTION
- EXCAVATION WORK
2. CLEAR AND DISPOSE OF DEBRIS.
3. ALL ROADS AND PARKING AREAS MUST BE STABILIZED WITHIN 72 HOURS OF ACHIEVING FINISHED GRADE.
4. BEGIN PERMANENT AND TEMPORARY SEEDING AND MULCHING. ALL CUT AND FILL SLOPES MUST BE SEEDED AND MULCHED WITHIN 72 HOURS OF
ACHIEVING FINISHED GRADE.
5. DAILY, OR AS REQUIRED, CONSTRUCT TEMPORARY BERMS, DRAINS, DITCHES, SILT FENCES, SEDIMENT TRAPS, ETC., MULCH AND SEED AS REQUIRED.
6. INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES.
7. COMPLETE PERMANENT SEEDING AND LANDSCAPING.
8. REMOVE TRAPPED SEDIMENTS FROM COLLECTOR DEVICES AS APPROPRIATE AND THEN REMOVE TEMPORARY EROSION CONTROL MEASURES.
EROSION AND SEDIMENT CONTROLS AND STABILIZATION PRACTICES
A. STABILIZATION MUST BE INITIATED ON ALL LOAM STOCKPILES AND DISTURBED AREAS WHERE CONSTRUCTION ACTIVITY MUST NOT OCCUR FOR MORE
THAN TWENTY ONE (21) CALENDAR DAYS. BY THE FOURTEENTH (14TH) DAY AFTER CONSTRUCTION ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED
IN THAT AREA. STABILIZATION MEASURES TO BE USED INCLUDE:
1. TEMPORARY SEEDING
2. MULCHING
B. DURING CONSTRUCTION, RUNOFF MUST BE DIVERTED AROUND THE SITE WITH EARTH DIKES, PIPING OR STABILIZED CHANNELS WHERE POSSIBLE. SHEET RUNOFF FROM THE SITE MUST BE FILTERED THROUGH HAYBALE BARRIERS AND SILT FENCES. ALL STORM DRAIN BASIN INLETS MUST BE PROVIDED WITH FLARED END SECTIONS AND TRASH RACKS. THE SITE MUST BE STABILIZED FOR THE WINTER BY NOVEMBER 15.
C. AN AREA MUST BE CONSIDERED STABLE WHEN ONE OF THE FOLLOWING HAS OCCURRED:
1. BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED.
2. A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED.
3. A MINIMUM OF 3" OF NON-EROSIVE MATERIAL SUCH STONE OR RIPRAP HAS BEEN INSTALLED.
4. EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED.
D. WINTER STABILIZATION PRACTICES (NOVEMBER 15TH THROUGH MAY 1ST):
1. ALL PROPOSED POST-DEVELOPMENT VEGETATED AREAS WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATED GROWTH BY NOVEMBER 15TH, OR
WHICH ARE DISTURBED AFTER NOVEMBER 15TH. MUST BE STABILIZED BY SEEDING AND INSTALLING EROSION CONTROL BLANKETS ON SLOPES GREATER THAN 4:1, AND SEEDING AND PLACING 3 TO 4 TONS OF MULCH PER ACRE, SECURE WITH ANCHOR NETTING, ELSEWHERE.
2. ALL DITCHES OR SWALES WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15TH, OR WHICH ARE DISTURBED AFTER OCTOBER 15TH, MUST BE STABILIZED WITH STONE OR EROSION CONTROL BLANKETS APPROPRIATE FOR THE DESIGN FLOW CONDITION.
3. AFTER NOVEMBER 15TH, INCOMPLETE ROAD OR PARKING SURFACES MUST BE PROTECTED WITH A MINIMUM OF 3-INCHES OF CRUSHED GRAVEL PER NHDOT ITEM 304.3, OR IF CONSTRUCTION IS TO CONTINUE THROUGH THE WINTER SEASON BE CLEARED OF ANY ACCUMULATED SNOW AFTER EACH
STORM EVENT.
OFF SITE VEHICLE TRACKING
THE CONTRACTOR MUST CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE(S) PRIOR TO ANY EXCAVATION ACTIVITIES. DEBRIS AND SEDIMENT TO BE CLEARED
FROM STABILIZED CONSTRUCTION ENTRANCE VICINITY DAILY.
INSTALLATION- MAINTENANCE AND INSPECTION PROCEDURES OF EROSION AND SEDIMENT CONTROLS
A. GENERAL
THESE ARE THE GENERAL INSPECTION AND MAINTENANCE PRACTICES THAT MUST BE USED TO IMPLEMENT THE PLAN.
1. ALL SWALES MUST BE STABILIZED PRIOR TO DIRECTING FLOW TO THEM.
2. THE SMALLEST PRACTICAL PORTION OF THE SITE MUST BE DENUDED AT ONE TIME. UNDER NO CIRCUMSTANCES MUST MORE THAN 5.0 ACRES OF THE
PROJECT SITE BE UNSTABILIZED AT ONE TIME.
3. ALL CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF 1/2 INCH OR GREATER.
4. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT MUST BE INITIATED WITHIN 24 HOURS OF REPORT.
5. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE OR HAYBALE BARRIERS WHEN IT HAS REACHED ONE THIRD THE HEIGHT OF THE FENCE OR
BALE.
6. ALL DIVERSION DIKES MUST BE INSPECTED AND ANY BREACHES PROMPTLY REPAIRED.
7. TEMPORARY SEEDING AND PLANTING MUST BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND UNHEALTHY GROWTH.
8. A MAINTENANCE INSPECTION REPORT MUST BE MADE AFTER EACH INSPECTION.
9. A REPRESENTATIVE OF THE SITE CONTRACTOR MUST BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE AND REPAIR ACTIVITIES, AND FILLING OUT THE
INSPECTION AND MAINTENANCE REPORT.
10.THE EROSION CONTROL PROCEDURES MUST CONFORM TO THE "NEW HAMPSHIRE STORMWATER MANUAL, VOL 3, EROSION AND SEDIMENT CONTROLS
DURING CONSTRUCTION" PREPARED BY COMPREHENSIVE ENVIRONMENTAL, INC. AND THE NHDES.
B. ALL FILLS MUST BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE, OR OTHER RELATED PROBLEMS. FILL
INTENDED TO SUPPORT BUILDINGS, STRUCTURES, AND CONDUITS, ETC., MUST BE COMPACTED IN ACCORDANCE WITH LOCAL CODES OR SPECIFICATIONS.
C. THE USE OF SAND FOR THE PURPOSE OF PEDESTRIAN SAFETY AND SAFE DRIVING CONDITION MUST BE MINIMIZED.
D. SILT SOCK
1. APPLICATION - SILT SOCKS MUST BE INSTALLED DOWN-SLOPE OF ANY DISTURBED AREA REQUIRING EROSION AND SEDIMENT CONTROL AND FILTRATION OF SOLUBLE POLLUTANTS FROM RUNOFF. SILT SOCKS ARE EFFECTIVE WHEN INSTALLED PERPENDICULAR TO SHEET OR LOW CONCENTRATED FLOW.
2. INSTALLATION DETAILS
a. SILT SOCKS USED FOR PERIMETER CONTROL OF SEDIMENT AND SOLUBLE POLLUTANTS IN STORM RUNOFF MUST MEET FILTREXX SOCK MATERIAL
SPECIFICATIONS AND USE CERTIFIED FILTREXX FILTER MEDIA, OR APPROVED EQUAL.
b. SILT SOCKS MUST BE PLACED BY QUALIFIED CONTRACTOR PERSONNEL AND AS DIRECTED BY THE CONTRACTING OFFICER.
c. SILT SOCKS SHOULD BE INSTALLED PARALLEL TO THE BASE OF THE SLOPE OR OTHER DISTURBED AREA. IN EXTREME CONDITIONS (i.e. 2:1 SLOPES).
A SECOND SILT SOCK ," MUST BE CONSTRUCTED AT THE TOP OF THE SLOPE.
d. STAKES MUST BE INSTALLED THROUGH THE MIDDLE OF THE SILT SOCK ON 10 FT CENTERS, USING 2 INCH BY 2 INCH BY 3 FEET WOODEN STAKES. IN
THE EVENT STAKING IS NOT POSSIBLE (i.e., WHEN SILT SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS MUST BE USED BEHIND THE
SILT SOCK TO HELP STABILIZE DURING RAINFALL/RUNOFF EVENTS.
e. STAKING DEPTH FOR SAND AND SILT LOAM SOILS MUST BE 12 INCHES AND 8 INCHES FOR CLAY SOILS.
f. LOOSE COMPOST MAY BE BACKFILLED ALONG THE UP-SLOPE SIDE OF THE SILT SOCK, FILLING THE SEAM BETWEEN THE SOIL SURFACE AND THE
DEVICE. IMPROVING FILTRATION AND SEDIMENT RETENTION.
g. IF THE SILT SOCK IS TO BE LEFT AS A PERMANENT FILTER OR PART OF THE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION
FOR ESTABLISHMENT OF PERMANENT VEGETATION.
h. SILT SOCKS ARE NOT TO BE USED IN PERENNIAL. EPHEMERAL. OR INTERMITTENT STREAMS.
i. SEE DETAIL FOR CORRECT SILT SOCK INSTALLATION.
E. FILTERS
1.SILT FENCE
a. SYNTHETIC FILTER FABRIC MUST BE A PERVIOUS SHEET OF PROPYLENE, NYLON, POLYESTER OR ETHYLENE YARN AND MUST BE
CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:
PHYSICAL PROPERTY REQUIREMENTS
FILTERING EFFICIENCY TENSILE STRENGTH AT 20X MAXIMUM ELONGATION*
VTM-51 75X MINIMUM
VTM-52 EXTRA STRENGTH 50 LB/LINEAR IN (MIN.)
STANDARD STRENGTH
30 LB/LINEAR IN (MIN.)
FLOW RATE VTM-51 0.3 GAL/SF/MIN (MIN.)
*REQUIREMENTS REDUCED BY 50 PERCENT AFTER SIX (6) MONTHS OF INSTALLATION.
b. SYNTHETIC FILTER FABRIC MUST CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF SIX (6) MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 DEGREES F TO 120 DEGREES F. THE HEIGHT
OF A SILT FENCE MUST NOT EXCEED THIRTY-SIX (36) INCHES.
c. THE FILTER FABRIC MUST BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH MUST BE SPLICED TOGETHER ONLY AT SUPPORT POST. WITH A MINIMUM SIX
(6) INCH OVERLAP AND SECURELY SEALED.
d. POSTS MUST BE SPACED A MAXIMUM OF TEN (10) FEET APART AT THE BARRIER LOCATION AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 16 INCHES). WHEN EXTRA STRENGTH FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING MUST NOT
EXCEED 6 FEET.
e. POSTS FOR SILT FENCES MUST BE EITHER 4-INCH DIAMETER WOOD OR 1.33 POUNDS PER LINEAR FOOT STEEL WITH A LENGTH OF 5
FEET. STEEL POSTS MUST HAVE A MESH SPACING OF 6 INCHES.
f. WIRE FENCE REINFORCEMENT FOR SILT FENCES USING STANDARD STRENGTH FILTER CLOTH MUST BE A MINIMUM OF 42 INCHES IN
HEIGHT, OF 14 GAUGE AND MUST HAVE PROJECTIONS FOR FASTENING WIRE TO THEM.
g. A TRENCH MUST BE EXCAVATED APPROXIMATELY FOUR (4) INCHES WIDE AND FOUR (4) INCHES DEEP ALONG THE LINE OF POSTS AND
UPSLOPE FROM THE BARRIER.
h. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE MUST BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST ONE (1) INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE
MUST EXTEND 36 INCHES ABOVE THE ORIGINAL GROUND SURFACES.
i. THE 'STANDARD STRENGTH' FILTER FABRIC MUST BE STAPLED OR WIRED TO THE FENCE, AND EIGHT (8) INCHES OF THE FABRIC MUST BE EXTENDED INTO THE TRENCH. THE FABRIC MUST NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE.
FILTER FABRIC MUST NOT BE STAPLED TO EXISTING TREES.
j. WHEN EXTRA STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF
ITEM (I) APPLYING.
k. THE TRENCH MUST BE BACKFILLED AND THE SOIL COMPACTED OVER THE FILTER FABRIC.
l. SILT FENCES MUST BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE BUT NOT BEFORE THE UP-SLOPE AREAS HAS
BEEN PERMANENTLY STABILIZED.
2. SEQUENCE OF INSTALLATION - SEDIMENT BARRIERS MUST BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE OF THE CONTRIBUTING
DRAINAGE AREA ABOVE THEM.
3. MAINTENANCE
a. STRAW/HAY BALE BARRIER AND SILT FENCE BARRIERS MUST BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL THEY MUST BE REPAIRED IF THERE ARE ANY SIGNS OF EROSION OR SEDIMENTATION BELOW THEM. ANY REQUIRED REPAIRS MUST BE MADE IMMEDIATELY. IF THERE ARE SIGNS OF UNDERCUTTING AT THE CENTER OR THE EDGES, OR IMPOUNDING OF LARGE VOLUMES OF WATER BEHIND THEM, SEDIMENT BARRIERS MUST BE REPLACED WITH A
TEMPORARY CHECK DAM.
b. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC MUST BE REPLACED PROMPTLY.
c. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH
APPROXIMATELY ONE-THIRD (1/3) THE HEIGHT OF THE BARRIER.
d. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED MUST BE
DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
F. MULCHING
1. TIMING
IN ORDER FOR MULCH TO BE EFFECTIVE, IT MUST BE IN PLACE PRIOR TO MAJOR STORM EVENTS. THERE ARE TWO (2) TYPES OF
STANDARDS WHICH MUST BE USED TO ASSURE THIS:
a. APPLY MULCH PRIOR TO ANY STORM EVENT. IT WILL BE NECESSARY TO CLOSELY MONITOR WEATHER PREDICTIONS, USUALLY BY
CONTACTING THE NATIONAL WEATHER SERVICE IN CONCORD, TO HAVE ADEQUATE WARNING OF SIGNIFICANT STORMS.
b. REQUIRED MULCHING WITHIN A SPECIFIED TIME PERIOD. THE TIME PERIOD CAN RANGE FROM 14 TO 21 DAYS OF INACTIVITY ON A
AREA, THE LENGTH OF TIME VARYING WITH SITE CONDITIONS. PROFESSIONAL JUDGMENT MUST BE USED TO EVALUATE THE INTERACTION OF SITE CONDITIONS (SOIL ERODIBILITY, SEASON OF YEAR, EXTENT OF DISTURBANCE, PROXIMITY TO SENSITIVE RESOURCES, ETC.) AND THE POTENTIAL IMPACT OF EROSION ON ADJACENT AREAS TO CHOOSE AN APPROPRIATE TIME RESTRICTION.
2. APPLICATION RATE
MULCH MUST BE APPLIED AT A RATE OF BETWEEN 1.5 TO 2 TONS PER ACRE, OR 90 TO 100 POUNDS PER 1000 SQUARE FEET. THE MINIMUM MULCH REQUIREMENT, REGARDLESS OF APPLICATION RATE IS THAT SOIL MUST NOT BE VISIBLE.
3. GUIDELINES FOR WINTER MULCH APPLICATION.
WHEN MULCH IS APPLIED TO PROVIDE PROTECTION OVER WINTER (PAST THE GROWING SEASON) IT MUST BE AT A RATE OF 6.000 POUNDS OF HAY OR STRAW PER ACRE. A TACKIFIER MAY BE ADDED TO THE MULCH. NO MULCH IS TO BE APPLIED OVER MORE THAN TWO (2) INCHES OF SNOW. IF SNOW DEPTH IS GREATER THAN TWO (2) INCHES IT MUST BE REMOVED BEFORE MULCHING.
4. MAINTENANCE
ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAINSTORMS, TO CHECK FOR RILL EROSION. IF LESS THAN 90X OF THE SOIL SURFACE IS COVERED BY MULCH. ADDITIONAL MULCH MUST BE IMMEDIATELY APPLIED.
5. EXCELSIOR MATTING
EXCELSIOR MATTING, OR APPROVED EQUAL, MUST BE USED IN PLACE OF MULCH ON ALL SLOPES STEEPER THAN 3:1.
6. SLOPES
ALL SLOPES GREATER THAN 15% DURING THE REGULAR CONSTRUCTION SEASON ARE TO HAVE NETTING OVER MULCH OR COMBINATION EROSION CONTROL MAT USED (MULCH AND NET). THIS APPLIES TO ALL SLOPES GREATER THAN 8% AFTER OCTOBER 1. MULCHING IS
REQUIRED OVER HYDROSEEDING.
G. TEMPORARY GRASS COVER
1. SEEDBED PREPARATION
APPLY FERTILIZER AT THE RATE OF 600 POUNDS PER ACRE OF 10-10-10. APPLY LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS
MAGNESIUM OXIDE) AT A RATE OF THREE (3) TONS PER ACRE.
2. SEEDING
a. UTILIZE ANNUAL RYE GRASS AT A RATE OF 40 LBS/ACRE.
b. WHERE THE SOIL HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS, LOOSEN SOIL TO A DEPTH OF TWO (2) INCHES BEFORE
APPLYING FERTILIZER, LIME AND SEED.
c. APPLY SEED UNIFORMLY BY HAND. CYCLONE SEEDER, OR HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER).
HYDROSEEDINGS, WHICH INCLUDE MULCH,MAY BE LEFT ON SOIL SURFACE. SEEDING RATES MUST BE INCREASED 10% WHEN
HYDROSEEDING.
3. MAINTENANCE
TEMPORARY SEEDINGS MUST BE PERIODICALLY INSPECTED. AT A MINIMUM, 95% OF THE SOIL SURFACE SHOULD BE COVERED BY VEGETATION. IF ANY EVIDENCE OF EROSION OR SEDIMENTATION IS APPARENT, REPAIRS MUST BE MADE AND OTHER TEMPORARY
MEASURES USED IN THE INTERIM (MULCH, FILTER BARRIERS, CHECK DAMS, ETC.).
H. PERMANENT MULCHING
1. TIMING
a. APPLYING PLANT RESIDUES OR OTHER SUITABLE MATERIALS THAT RESIST DECOMPOSITION SUCH AS WOOD CHIPS OR CRUSHED STONE TO THE SOIL SURFACE WHERE VEGETATION STABILIZATION IS EITHER IMPRACTICAL OR DIFFICULT TO ESTABLISH.
b. WINTER STABILIZATION MUST MEET OR EXCEED THE FOLLOWING REQUIREMENTS.
2. CONSIDERATIONS
a. PERMANENT MULCHING MUST BE USED TO STABILIZE CHRONIC EROSION AREAS WHICH RECEIVE HEAVY FOOT OR VEHICLE TRAFFIC.
NOT INTENDED FOR AREAS OF CONCENTRATED FLOWS.
b. IF WOOD CHIPS ARE USED IN LANDSCAPED AREAS (TREES & SHRUBS). A SUPPLEMENTAL APPLICATION OF CHEMICAL FERTILIZER SHOULD BE APPLIED AT A RATE OF TWO POUNDS OF 5-10-5 PER 100 SQUARE FEET OF MULCH.
c. IF CRUSHED STONE IS USED, A PLASTIC FILTER CLOTH MUST BE PLACED BETWEEN THE GROUND AND THE STONE.
3. SPECIFICATIONS
a. WOOD CHIPS OR AGGREGATE MUST BE USED ON SLOPES NO STEEPER THAN 3 HORIZONTALLY ON 1 VERTICALLY.
b. PERMANENT MULCH MUST BE 3 INCHES OR MORE IN DEPTH.
c. WOOD CHIPS MUST BE APPLIED AT A RATE OF 500-900 POUNDS PER 1,000 SQUARE FEET OR 10-20 TONS PER ACRE. WOOD CHIPS
MUST BE GREEN OR AIR-DRIED AND FREE OF OBJECTIONABLE COARSE MATERIALS.
d. AGGREGATE COVER (GRAVEL. CRUSHED STONE OR SLAG) MUST BE WASHED, 1/4 INCH TO 2 A INCHES AND APPLIED AT A RATE OF 9
CUBIC YARDS PER 1,000 SQUARE FEET.
4. MAINTENANCE
a.WOOD CHIPS MUST BE MONITORED FOR DECOMPOSITION AND NEW APPLICATIONS MADE.
b.CRUSHED STONE MUST BE MONITORED FOR WASH OUT AND SLIPPING DOWN SLOPE. IF EITHER c.OCCUR. NEW MATERIAL MUST BE PROVIDED ON THE BARREN AREAS.
I. VEGETATIVE PRACTICE
1. FOR PERMANENT MEASURES AND PLANTINGS.
a. LIMESTONE MUST BE THOROUGHLY INCORPORATED INTO THE LOAM LAYER AT A RATE OF 3 TONS PER ACRE IN ORDER
TO PROVIDE A PH VALUE OF 5.5 TO 6.5.
b. FERTILIZER MUST BE SPREAD ON THE TOP LAYER OF LOAM AND WORKED INTO THE SURFACE. FERTILIZER
APPLICATION RATE MUST BE 800 POUNDS PER ACRE OF 10-20-20 FERTILIZER.
c. SOIL CONDITIONERS AND FERTILIZER MUST BE APPLIED AT THE RECOMMENDED RATES AND MUST BE THOROUGHLY WORKED INTO THE LOAM. LOAM MUST BE RAKED UNTIL THE SURFACE IS FINELY PULVERIZED, SMOOTH AND EVEN, AND THEN COMPACTED TO AN EVEN SURFACE CONFORMING TO THE REQUIRED LINES AND GRADES WITH APPROVED
ROLLERS WEIGHING BETWEEN 4-1/2 POUNDS AND 5-1/2 POUNDS PER INCH OF WIDTH.
d. SEED MUST BE SOWN AT THE RATE SHOWN BELOW. SOWING MUST BE DONE ON A CALM, DRY DAY, PREFERABLY BY MACHINE, BUT IF BY HAND, ONLY BY EXPERIENCED WORKMEN. IMMEDIATELY BEFORE SEEDING, THE SOIL MUST BE LIGHTLY RAKED. ONE HALF THE SEED MUST BE SOWN IN ONE DIRECTION AND THE OTHER HALF AT RIGHT ANGLES TO THE ORIGINAL DIRECTION. IT MUST BE LIGHTLY RAKED INTO THE SOIL TO A DEPTH NOT OVER 1/4 INCH AND ROLLED
WITH A HAND ROLLER WEIGHING NOT OVER 100 POUNDS PER LINEAR FOOT OF WIDTH.
e. HAY MULCH MUST BE APPLIED IMMEDIATELY AFTER SEEDING AS INDICATED ABOVE. F. THE SURFACE MUST BE WATERED AND KEPT MOIST WITH A FINE SPRAY AS REQUIRED, WITHOUT WASHING AWAY THE SOIL UNTIL THE GRASS IS WELL ESTABLISHED. ANY AREAS WHICH ARE NOT SATISFACTORILY COVERED WITH GRASS MUST BE RESEEDED, AND
ALL NOXIOUS WEEDS REMOVED.
f. THE CONTRACTOR MUST PROTECT AND MAINTAIN THE SEEDED AREAS UNTIL ACCEPTED.
g. A GRASS SEED MIXTURE CONTAINING THE FOLLOWING SEED REQUIREMENTS MUST BE APPLIED AT THE INDICATED
RATE:
SEEDING RATE
CREEPING RED FESCUE 175 LBS/ACRE
KENTUCKY BLUEGRASS 25 LBS/ACRE
PERRENIAL RYE GRASS 50 LBS/ACRE
h. IN NO CASE MUST THE WEED CONTENT EXCEED 1 PERCENT BY WEIGHT. ALL SEED MUST COMPLY WITH STATE AND FEDERAL SEED LAWS. SEEDING MUST BE DONE NO LATER THAN SEPTEMBER 15. IN NO CASE MUST SEEDING TAKE
PLACE OVER SNOW.
J. DORMANT SEEDING (SEPTEMBER 15 TO FIRST SNOWFALL)
FOLLOW PERMANENT MEASURES SLOPE, LIME, FERTILIZER AND GRADING REQUIREMENTS. APPLY SEED MIXTURE AT TWICE THE
INDICATED RATE. APPLY MULCH AS INDICATED FOR PERMANENT MEASURES.
K. STORM DRAIN INLET PROTECTION
1.STRAW/HAY BALE INLET STRUCTURE
a.BALES MUST BE EITHER WIRE BOUND OR STRING TIED WITH THE BINDINGS ORIENTED AROUND THE SIDES RATHER
THAN OVER AND UNDER THE BALES.
b.BALES MUST BE PLACED LENGTHWISE IN A SINGLE ROW SURROUNDING THE INLET, WITH THE ENDS OF ADJACENT
BALES PRESSED TOGETHER.
c.THE FILTER BARRIER MUST BE ENTRENCHED AND BACKFILLED. A TRENCH MUST BE EXCAVATED AROUND THE INLET THE WIDTH OF BALE TO A DEPTH OF FOUR (4) INCHES. AFTER THE BALES ARE STAKED, THE EXCAVATED SOIL MUST BE
BACKFILLED AND COMPACTED AGAINST THE FILTER BARRIER.
d.EACH BALE MUST BE SECURELY ANCHORED AND HELD IN PLACE BY AT LEAST TWO (2) STAKES OR REBARS DRIVEN
THROUGH THE BALE.
e.LOOSE STRAW/HAY MUST BE WEDGED BETWEEN BALES TO PREVENT WATER FROM ENTERING BETWEEN BALES.
f. ALL STRUCTURES MUST BE INSPECTED AFTER EVERY RAINSTORM AND REPAIRS MADE AS NECESSARY.
g. SEDIMENT MUST BE REMOVED FROM THE DEVICES AFTER THE SEDIMENT HAS REACHED A MAXIMUM OF ONE-THIRD
THE DEPTH OF THE TRAP.
h. HAYBALES MUST BE REMOVED AND THE AREA REPAIRED AS SOON AS THE CONTRIBUTING DRAINAGE AREA TO THE
INLET HAS BEEN COMPLETELY STABILIZED.
2. BLOCK AND GRAVEL INLET PROTECTION
a.PLACE CONCRETE BLOCKS LENGTHWISE ON THEIR SIDE IN A SINGLE ROW AROUND THE PERIMETER OF THE INLET, WITH THE ENDS OF ADJACENT BLOCKS ABUTTING. THE HEIGHT OF THE BARRIER CAN BE VARIED, DEPENDING ON DESIGN NEEDS, BY STACKING COMBINATIONS OF 4-INCH, 8-INCH AND 12-INCH WIDE BLOCKS. THE BARRIER OF BLOCKS
MUST BE AT LEAST 12 INCHES HIGH AND NO GREATER THAN 24 INCHES HIGH.
b.WIRE MESH MUST BE PLACED OVER THE OUTSIDE VERTICAL FACE (WEBBING) OF THE CONCRETE BLOCKS TO PREVENT STONE FROM BEING WASHED THROUGH THE HOLES IN THE BLOCKS. HARDWARE CLOTH OR COMPARABLE WIRE MESH
WITH 1/2-INCH OPENINGS MUST BE USED.
c.STONE MUST BE PILED AGAINST THE WIRE TO BE THE TOP OF THE BLOCK BARRIER. STONE GRADATION MUST BE WELL
GRADED WITH THE MAXIMUM STONE SIZE OF 6 INCHES AND MINIMUM STONE SIZE OF 1 INCH.
d.IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS
FUNCTION, THE STONE MUST BE PULLED AWAY FROM THE BLOCKS, CLEANED AND REPLACE.
3. STABILIZED CONSTRUCTION ENTRANCE
a.SPECIFICATIONS
1. AGGREGATE SIZE: USE TWO (2) INCHES STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
2.AGGREGATE THICKNESS: NOT LESS THAN SIX (6) INCHES.
3.WIDTH: TEN (10) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH OF POINTS WHERE INGRESS OR EGRESS
OCCURS.
4.LENGTH: AS REQUIRED. BUT NOT LESS THAN FIFTY (50) FEET
5.GEOTEXTILE: TO BE PLACED OVER THE ENTIRE AREA TO BE COVERED WITH AGGREGATE. PIPING OF SURFACE
WATER UNDER ENTRANCE MUST BE PROVIDED AS REQUIRED.
6.CRITERIA FOR GEOTEXTILE: THE FABRICS MUST BE TREVIA SPUNBOND 1135, MIRAFI 600X OR EQUAL.
b. MAINTENANCE THE ENTRANCE MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT MUST BE DONE ON A AREA STABILIZED WITH AGGREGATE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. ALL SEDIMENT MUST BE PREVENTED FROM ENTERING
STORM DRAINS, DITCHES OR WATERWAYS.
C-501
E R
O S
I O
N
A
D
I M
E N
T A
T I O
N
C
O N
T R
T
E S
Z R
J
Z R
J
L D
A
C
D
2 3
C
4 5
A
B
M A
R K
D E
S C
R I P
T I O
N
SHEET ID
D A
T E
US Army Corps of Engineers ®
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
B E
R
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I
M
E
M
Y
C
O R
E
N G
I N
E E
R S
C O
G
I O
S
E A
R C
H
A
G
I N
E E
R I N
G
L
A B
O R
A T
O R
Y
C L I M
A T
E
C
O L
D
C
H A
M B
E R
S
H
A N
O V
E R
N
H
N E
W
E
N G
L A
S
T R
I C
T
V
E R
G I N
A
D
C
O N
C O
C O
L B
Y
C
O M
P A
N Y
L
L C
R
K
S
T R
E E
T
P
O R
T L A
A N
S I
D
W W
J B
W W
J D
I S
S U
N
S T
R U
C T
I O
N
SCALE: NTS
SILT SOCK DETAILC3
FLOW
FLOW
FLOW
UP SLOPE AREA OF DISTURBANCE
1. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT
LEAST DAILY DURING PROLONGED RAINFALL. INSPECT FOR SIGNS OF EROSION OR
SEDIMENTATION. REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
2. SHOULD THE SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE, REPLACE
PROMPTLY.
3. REMOVE SEDIMENT DEPOSITS AFTER EACH STORM EVENT AND WHEN DEPOSITS
REACH APPROXIMATELY 1/2 THE HEIGHT OF THE BARRIER.
JOINING SECTIONS
OF SILT FENCES DOWN SLOPE AREA
TO BE PROTECTED
4" MI
N.
4" MIN
10' MAX.
WRAP SEDIMENTATION
CONTROL FABRIC AROUND
WOOD POST, ONE FULL
TURN
WOOD
POST
SEDIMENTATION
CONTROL FABRIC
WOOD POST
(TYPICAL)
3' TYPICAL
12" EMBEDMENT MIN.
BACKFILL
SEDIMENTATION
CONTROL FABRIC
WOOD POST
4"x4" MIN.
TRENCH
BACKFILL TRENCH AFTER
INSTALLATION OF SILT
FENCE
SCALE: NTS
SILTATION FENCE DETAILC1
END AND SIDE OVERLAP AT
CORNERSSTRAW BALES STAKED WITH
TWO STAKES PER BALE
RUN-OFF WATER
WITH SEDIMENT
STAKED STRAW
BALE
COMPACTED SOIL TO
PREVENT PIPING
FILTERED
WATER
FILTER FABRIC MATERIAL SECURELY
FASTENED TO THE POSTS WIRE MESH (IF
USED)
EXPANSION RESTRAINT
INSTALL SILT SACK UNDER GRATE
NOTES:
1. INSTALL SILTSACK PER MANUFACTURER'S RECOMMENDATIONS.
2. SILTSACKS SHALL BE CHECKED FOR SEDIMENT LEVEL AND OVERALL CONDITION IMMEDIATELY AFTER
EVERY RAIN EVENT AND AT LEAST EVERY DAY DURING PROLONGED RAINFALL.
3. SEDIMENT SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF
THE SILTSACK. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER
THAT WILL NOT ERODE.
4. SEDIMENT SHALL ONLY BE REMOVED BY REMOVING THE SILTSACKS FROM THE CATCH BASINS
ACCORDING TO MANUFACTURER RECOMMENDATIONS.
6. CARE SHALL BE TAKEN TO AVOID SPILLING SEDIMENT WHILE REMOVING THE SILTSACK.
7. ANY DAMAGED SILTSACK SHALL BE REPLACED WITH A NEW SILTSACK.
SILT SACK BY ACF ENVIRONMENTAL
OR APPROVED EQUIVALENT CATCH BASIN
LOOPS FOR INSERTING REBAR
(FOR LIFTING AND REMOVAL)
STAKE ON 10'
LINER
SPACING
WATER FLOW
WORK AREA
AREA TO BE
PROTECTED
PLAN VIEW
SECTION
2"x2" WOODEN STAKE
SILT SOCK SIZE PER
MANUFACTURER
RECOMMENDATIONS
WORK AREA
AREA TO BE
PROTECTED
3" -4
1'- 0"
SILT SOCK SIZE PER
MANUFACTURER
RECOMMENDATIONS
NOTE: SILT SOCK MUST BE IN
CONTINUOUS AND FULL
CONTACT WITH THE GROUND
AT ALL INSTALLED LOCATIONS.
SCALE: NTS
HAYBALE DIKE DETAILA3
SCALE: NTS
INLET PROTECTION - SILT SACK DETAILA1
SECTION VIEW
PLAN VIEW
' M
IN
50' MIN.
EXISTING PAVED
OR GRAVEL
ROAD
EXISTING
PAVED
ROAD
50' MIN.
NOTES:
1. STONE SIZE: 2" USE CRUSHED STONE OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
2. THICKNESS: MINIMUM OF 6".
3. MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .