This federal contract solicitation seeks proposals for the construction of a climatic cold chamber building at the Cold Regions Research and Engineering Laboratory in Hanover, New Hampshire. Key details include construction of a 4,800 square foot pre-engineered metal building to house climatic chambers and support spaces. The solicitation was issued by the U.S. Army Corps of Engineers Engineering District New England. The anticipated award date is listed as March 2020 with construction completion expected by December 2020. Pricing is to be provided using fixed unit pricing and lump sum bids. There are no set-aside provisions or incumbent mentioned.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Bid Summary_W912WJ20B0008.pdf PDF
Amendment 0006.pdf PDF
Amend 0005_Architectural Drawing Revisions.pdf PDF
Amend 0005_13 34 19.pdf PDF
Amendment 0005.pdf PDF
Amend 0004_11 01 00.pdf PDF
Amendment 0004.pdf PDF
Amend 0004_13 34 19.pdf PDF
Amend 0003_A-310.pdf PDF
Amend 0003_03 30 00.pdf PDF
Amend 0003_S-301.pdf PDF
Amend 0003_P-501.pdf PDF
Amend 0003_CD-101.pdf PDF
Amend 0003_C-503.pdf PDF
Amend 0003_A-601.pdf PDF
Amendment 0003.pdf PDF
Amend 0003_S-501.pdf PDF
Amend 0003_11 20 00.pdf PDF
Amend 0003_13 34 19.pdf PDF
Amend 0003_28 31 63.pdf PDF
Amend 0003_A-301.pdf PDF
Amend 0003_22 07 19.pdf PDF
Amendment 0002.pdf PDF
11 20 00 - Amend002_4-17-20.pdf PDF
Amendment 0001.pdf PDF
CRREL Climatic Chamber Pre-Bid Site Visit 16APR20.pdf PDF
Solicitation W912WJ20B0008 CREEL Climatic Cold Chambers Virtual Site Visit 2020-04-16-10-00-04.mp4 MP4 file
Solicitation W912WJ20B0008.pdf PDF
J A_Redacted.pdf PDF
Drawing.pdf PDF
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03/13/20

NS ED

ECIL

BENJAMIN C.

TOWNSEND

No. 13287

OFETAT

S

MAINE

N LAOISSEF

O

R P

ENG

IN

E E R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

G-001

C O

V E

R S

H E

E T

C O

L D

R E

G

IO

N S

R E

S E

A R

C H

A N

D E

N G

IN

E

E R

IN

G

L A

B O

R A

T O

R Y

C L

IM

A T

IC

C

O L D

C H

A M

B E

R

H A

N O

V E

R N

H N

E W

E N

G L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C

O N

C O

R D

M A

C O

L B

Y C

O M

P A

N Y

L L C

A

Y O

R K

S T

R E

E T

P

O R

T L A

N D

M E

C A

P

C A

P

B C

T

R T

M

/1

/2

W W

J B

W W

J -1

-D

-0

VICINITY MAP

SCALE: NTS

A

TLA

N

TIC

O C

EA

N

CANADA

STATE OF

MAINE

STATE OF

VERMONT

PROJECT SITE

SITE LOCATION

SCALE: NTS

COLD REGIONS RESEARCH AND ENGINEERING

LABORATORY CLIMATIC COLD CHAMBER

HANOVER, NH

NEW ENGLAND DISTRICT

696 VIRGINIA ROAD, CONCORD MA

SOLICITATION# W912WJ20B0014

PROJECT SITE

L Y

M E

R O

A D

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

03/13/20

NS ED

ECIL

BENJAMIN C.

TOWNSEND

No. 13287

OFETAT

S

MAINE

N LAOISSEF

O

R P

ENG

IN

E E R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

G-002

D R

A W

IN

G

I N

D E

X

C O

L D

R E

G

IO

N S

R E

S E

A R

C H

A N

D E

N G

IN

E

E R

IN

G

L A

B O

R A

T O

R Y

C L

IM

A T

IC

C

O L D

C H

A M

B E

R

H A

N O

V E

R N

H N

E W

E N

G L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C

O N

C O

R D

M A

C O

L B

Y C

O M

P A

N Y

L L C

A

Y O

R K

S T

R E

E T

P

O R

T L A

N D

M E

C A

P

C A

P

B C

T

R T

M

/1

/2

W W

J B

W W

J -1

-D

-0

DRAWING INDEX

DRAWING TITLE

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 GENERAL ARRANGEMENT

G-101 SITE ACCESS PLAN

LS-101 FIRST FLOOR - LIFE SAFETY PLAN

C-001 CIVIL GENERAL NOTES

CD-101 SITE DEMOLITION PLAN

C-101 SITE PLAN

C-102 SITE GRADING AND EROSION CONTROL PLAN

C-501 EROSION AND SEDIMENTATION CONTROL NOTES

C-502 EROSION AND SEDIMENTATION CONTROL DETAILS

C-503 CONSTRUCTION DETAILS

S-001 GENERAL STRUCTURAL NOTES & ABBREVIATIONS

S-101 FOUNDATION PLAN

S-102 SLAB PLAN

S-301 FOUNDATION SECTIONS

S-501 TYPICAL STRUCTURAL DETAILS

S-502 TYPICAL STRUCTURAL DETAILS

A-001 ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS

A-002 TYPICAL MOUNTING HEIGHTS AND CLEARANCES

A-101 GROUND FLOOR PLAN

A-102 REFRIGERATION ROOF PLAN

A-103 OVERALL ROOF PLAN

A-104 OVERALL REFLECTED CEILING PLAN

A-201 WEST ELEVATION

A-202 NORTH ELEVATION

A-203 EAST ELEVATION

A-204 SOUTH ELEVATION

A-301 BUILDING SECTION

A-302 BUILDING SECTIONS

A-303 BUILDING SECTION

A-304 BUILDING SECTION

A-310 WALL SECTIONS

A-501 DETAILS

A-601 DOOR SCHEDULE, FINISH SCHEDULE, PARTITION SCHEDULE

A-602 DOOR & LOUVER DETAILS

A-901 PERSPECTIVE VIEWS

FA-001 FIRE ALARM LEGEND, ABBREVIATIONS AND GENERAL NOTES

FA-101 GROUND FLOOR FIRE ALARM PLAN

P-001 PLUMBING LEGEND, ABBREVIATIONS AND GENERAL NOTES

P-101 GROUND FLOOR PLUMBING PLAN

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

M-001 MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES

M-101 GROUND FLOOR MECHANICAL PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROL SEQUENCES

E-001 GENERAL NOTES, LEGEND AND ABBREVIATIONS

ES-101 ELECTRICAL SITE PLAN

E-101 GROUND FLOOR POWER PLAN

E-102 GROUND FLOOR LIGHTING PLAN

E-501 ONE LINE DIAGRAM AND LIGHT FIXTURE SCHEDULE

E-502 ELECTRICAL DETAILS

E-601 PANEL SCHEDULES

E-602 PANEL SCHEDULES

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

DN

DN

CBA D

STAGING

ENCLOSURE

/2

/2

76' - 3"

/2

/2

IT

PREFAB OFFICE

PREFAB

SHOWER

MECHANICAL

400 SF STORAGE

FENCED W/ DOUBLE GATE

24' - 0" 6"

13' - 0"

7' - 8"

23' - 8" 22' - 0"

7' - 6"

8' - 0" 16' - 0"

CONCRETE DRIVING PAD

CONCRETE DRIVING PAD

COLD CHAMBER

VESTIBULE

REFRIGERATION CONDENSERS

PROVIDED WITH COLD

CHAMBER PACKAGE

REFRIGERATION EQUIPMENT

PROVIDED WITH COLD

CHAMBER PACKAGE

CLR MIN.

8' - 0"

C L R

M

IN

PLUMBING

ACCESS

UTILITY

8" F.F.

6" F.F.

6" F.F.

8" F.F.

1' - 3 1/2" 23' - 10" 23' - 10" 26' - 0"

STEEL VEHICULAR

RAMP 1 1/2":12"

SLOPE

14' - 0"

9' - 0"

NOTES:

1. COLD CHAMBER PACKAGED UNIT TO

INCLUDE RAMP, LIGHTING, DOORS,

FLOOR, CEILING, WALLS, &

ELECTRICAL FEEDS. REFERENCE

SPECIFICATION 112000.

2. PREFAB SHOWER TO INCLUDE ABA

SHOWER, ABA TOILET, ABA SINK,

LIGHTING, DOORS, FINISHES, FLOOR,

CEILING, INSULATED ROOF, INSULATED

WALLS, MECHANICAL EQUIPMENT &

ELECTRIC FEEDS. ABA RAMP & STAIRS

TO BE PROVIDED WITH PACKAGE.

REFERENCE SPECIFICATION 110100.

3. PREFAB OFFICE TO INCLUDE LIGHTING,

DOORS,FINISHES, FLOOR, CEILING,

INSULATED ROOF, INSULATED WALLS,

MECHANICAL EQUIPMENT &

ELECTRICAL FEEDS. REFERENCE

SPECIFICATION 110100.

4. REFERENCE D3/A-501 FOR ALL PIPE

PENETRATIONS AT METAL PANEL WALL

FOR COLD CHAMBER CONNECTIONS

BETWEEN CHAMBER EQUIPMENT &

REFRIGERATION CONDENSERS.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

G-003

G E

N E

R A

L A

R R

A N

G E

M E

N T

C O

L D

R E

G

IO

N S

R E

S E

A R

C H

A N

D E

N G

IN

E

E R

IN

G

L A

B O

R A

T O

R Y

C L

IM

A T

IC

C

O L D

C H

A M

B E

R

H A

N O

V E

R N

H N

E W

E N

G L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C

O N

C O

R D

M A

C O

L B

Y C

O M

P A

N Y

L L C

A

Y O

R K

S T

R E

E T

P

O R

T L A

N D

M E

C A

P

C A

P

B C

T

R T

M

/1

/2

W W

J B

W W

J -1

-D

-0

3/16" = 1'-0"A1

GENERAL ARRANGEMENT

SCALE:

3/16" = 1' - 0"

4' 4' 8' 12'

PLAN NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

L y m e

R o a d

R o u t e

CONTRACTOR SITE ACCESS

CONTRACTOR ACCESS PATH

CONTRACTOR LAYDOWN AREA

PROJECT WORK AREA

STOCKPILE AREA (MATERIAL

WAITING TO BE TESTED)

PROJECT SITE

0 60' 120'

Scale: 1" = 60'-0"

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

T

F I

E

U M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

A M

E

S

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

C O

D

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

I S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

M

C O

L B

Y

C

O M

P A

N Y

L

L C

Y

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

KEYED NOTES:

SOIL STOCKPILE AREA, SEE SPECIFICATION

02 61 13 FOR SOIL TESTING AND HANDLING

REQUIREMENTS, AND 02 81 00 FOR

TRANSPORTATION AND HANDLING OF

CONTAMINATED MATERIAL REQUIREMENTS.

LOCATION TO BE CONFIRMED WITH CRREL.

SCALE: 1"=60'-0"

SITE ACCESS PLANA1

G-101

S I T

E

A

C C

E S

S

P

L A

N

Z R

J

Z R

J

B C

T

C B

G D

W

NS ED

ECIL

BRUCE

BUNDY

No. 16161

OFETAT

S

MAIN

E

N LAOISSE

F O

R P

ENG

IN

E E R

AARON

F

FACP

C

D

W P

C

D

C

D

60CD

LT,XP

F

30CD

LT,XP

F

110CD

WP

110CD

WP

C

D

W P

110CD

WP

C

D

W P

110CD

C

D

W P

C

D

W P

F

DN

DN

CBA D

AREA SERVED= 97'-0"

EXIT SEPARATION DISTANCE= 82'-9"

C O

M M

O N

P A

T H

TRAVEL DISTANCE=64'-6"

T R

A V

E L D

IS

T

A N

C E

COMMON PATH=40'-9"

C O

M M

O N

P A

T H

TRAVEL DISTANCE=73'-3"

T R

A V

E L D

IS

T

A N

C E

STAGING

ENCLOSURE

COLD CHAMBER

PREFAB OFFICE

PREFAB

SHOWER

KB

IT

MECHANICAL

VESTIBULE

COMMON PATH 23'-6"TRAVEL DISTANCE=92'-0"

FENCED STORAGE

FE

TRAVEL DISTANCE=54'-9"

TRAVEL DISTANCE=145'-9" T

R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

LEGEND

TRAVEL PATHS

KB

FACP

F

KEY BOX

FIRE ALARM CONTROL PANEL

MANUAL PULL STATION

75 HORN/STROBE NOTIFICATION

APPLIANCE

EXIT SIGN, WALL MOUNTED

COMMON PATH

SPECIAL INDUSTRIAL

NON-SPRINKLERED

MAXIMUM ACTUAL

AREA EXEMPT

IBC BUILDING REQUIREMENTS

CONSTRUCTION TYPE IIB, II (000)

NON-SPRINKLERED

OCCUPANCY CLASSIFICATION:

IBC: GROUP F-1, MODERATE HAZARD FACTORY INDUSTRIAL,

SPECIAL PURPOSE INDUSTRIAL PER 503.1.1.

NFPA 101: SPECIAL PURPOSE INDUSTRIAL

SPECIAL INDUSTRIAL

NON-SPRINKLERED

REQUIRED ACTUAL

TRAVEL DISTANCE 300' MAXIMUM 105'-0"

NFPA 101 EGRESS REQUIREMENTS

4835 SF

STORIES EXEMPT 1

HEIGHT EXEMPT 28'-3"

OCCUPANT LOAD (NFPA 101) = 10 OCCUPANTS

OCCUPANCY: SPECIAL PURPOSE INDUSTRIAL

COMMON PATH 50' MAXIMUM 40'-9"

DEAD END 50' MAXIMUM 23'-6"

EXIT SEPARATION VS

DIAGONAL

EXIT SEPARATION

AREA SERVED

NOT LESS THAN 1/2

DIAGONAL DIMENSION

82'-9" 97'-0"

EXIT DOOR

CAPACITY

OCC.x.0.2"=MIN.

36" MIN.

10*.0.2=2"

36" IN

ELECTRICAL

(36*2)72" IN

STORAGE

FE FIRE EXTINGUISHER (NOT

IN CONTRACT)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

LS-101

F

IR

S T

F L O

O R

L

IF

E S

A F

E T

Y P

L A

N

C O

L D

R E

G

IO

N S

R E

S E

A R

C H

A N

D E

N G

IN

E

E R

IN

G

L A

B O

R A

T O

R Y

C L

IM

A T

IC

C

O L D

C H

A M

B E

R

H A

N O

V E

R N

H N

E W

E N

G L A

N D

D

IS

T R

IC

T

V

IR

G

IN

IA

R O

A D

C

O N

C O

R D

M A

C O

L B

Y C

O M

P A

N Y

L L C

A

Y O

R K

S T

R E

E T

P

O R

T L A

N D

M E

C A

P

C A

P

B C

T

R T

M

/1

/2

W W

J B

W W

J -1

-D

-0

1/4" = 1'-0"A1

LIFE SAFETY PLAN

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

PLAN NORTH

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

UTILITY NOTES

1. THE CONTRACTOR MUST BE RESPONSIBLE FOR PROVIDING ALL FIELD LAYOUT. THE CONTRACTOR MUST RECORD TIES TO ALL UTILITY CONNECTIONS AND PROVIDE MARKED-UP RECORD DRAWINGS FOR ALL PROPOSED UTILITIES SHOWING

TIES TO CONNECTIONS, BENDS, VALVES, LENGTHS OF LINES AND INVERTS.

2. THE CONTRACTING OFFICER MUST BE NOTIFIED IN WRITING OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK MUST NOT VARY FROM THE PLANS WITHOUT THE EXPRESSED WRITTEN

APPROVAL FROM THE CONTRACTING OFFICER.

3. THE CONTRACTOR MUST COORDINATE AND COOPERATE WITH ANY AND ALL OTHER CONTRACTORS PERFORMING WORK

THAT IMPACTS THIS PROJECT.

4. THE CONTRACTOR MUST RESTORE ROADWAYS, LAWNS, DRIVEWAYS, FENCES, CULVERTS, SIGNS AND OTHER PUBLIC OR PRIVATE PROPERTY DAMAGED OR REMOVED BY THE CONTRACTOR TO PRE-CONSTRUCTION CONDITION OR BETTER, AS DETERMINED BY THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. ANY DAMAGED TREES, SHRUBS AND/OR

HEDGES MUST BE REPLACED AT THE CONTRACTOR'S EXPENSE.

6. THE CONTRACTOR MUST BE RESPONSIBLE FOR COORDINATING, OBTAINING, AND INCURRING THE COST OF ALL

REQUIRED PERMITS, INSPECTIONS, AND CERTIFICATES IN SUPPORT OF THIS PROJECT.

7. THE CONTRACTOR MUST COMPLY WITH ALL REQUIRED PERMITS.

8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE ALL PLAN SHEETS AND SPECIFICATIONS, AND COORDINATE

WORK WITH ALL CONTRACTS FOR THE SITE.

9. THE CONTRACTOR MUST CONDUCT EXPLORATORY TEST PITS AS MAY BE REQUIRED TO DETERMINE UNDERGROUND

CONDITIONS.

10. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE MAINTENANCE OF SURFACE DRAINAGE AND EROSION AND

SEDIMENTATION CONTROLS DURING THE COURSE OF WORK.

11. THE CONTRACTOR MUST GRADE ALL DISTURBED AREAS ON THE SITE TO PROVIDE POSITIVE DRAINAGE.

12. THE CONTRACTOR MUST PROVIDE A DETAILED SCHEDULE OF WORK TO THE CONTRACTING OFFICER. WORK MUST BE COORDINATED TO MINIMIZE DISTURBANCE TO ONGOING OPERATIONS. WATER OUTAGES WILL NOT BE ALLOWED.

13. CONTRACTOR MUST MAKE THEMSELVES FAMILIAR WITH SPECIFICATION 01 35 26 SECTION 1.6, WORKING IN AND AROUND

SOIL THAT IS KNOWN TO HAVE POTENTIAL TCE CONTAMINATION.

GENERAL NOTES

CONSTRUCTION NOTES

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

A. WASTE MATERIALS

ALL WASTE MATERIALS MUST BE COLLECTED AND STORED IN SECURELY LIDDED RECEPTACLES. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE MUST BE DEPOSITED IN A DUMPSTER. CONSTRUCTION WASTE MATERIALS MUST NOT BE BURIED ON SITE. ALL PERSONNEL MUST BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL BY THE SUPERINTENDENT. ALL DEMOLISHED MATERIALS ARE THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER. DISPOSE OF ALL DEMOLISHED MATERIALS OFF-SITE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS AND REGULATIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

B. HAZARDOUS WASTE

ALL HAZARDOUS WASTE MATERIALS MUST BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL MUST BE INSTRUCTED IN THESE PRACTICES BY THE

SUPERINTENDENT.

C. SANITARY WASTE

ALL SANITARY WASTE MUST BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONCE PER WEEK BY A

LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR.

D. PRODUCT SPECIFICATION PRACTICES

THE FOLLOWING PRODUCT SPECIFIC PRACTICES MUST BE FOLLOWED ON SITE:

1.PETROLEUM PRODUCTS:

ALL ON SITE VEHICLES MUST BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE LEAKAGE. PETROLEUM PRODUCTS MUST BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT BASED SUBSTANCES USED ON SITE MUST BE APPLIED ACCORDING TO THE

MANUFACTURER'S RECOMMENDATIONS.

2.FERTILIZERS:

FERTILIZERS USED MUST BE APPLIED ONLY IN THE MINIMUM AMOUNTS DIRECTED BY THE SPECIFICATIONS. ONCE APPLIED FERTILIZER MUST BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORMWATER. STORAGE MUST BE IN A COVERED SHED OR ENCLOSED TRAILERS. THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER MUST BE

TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS.

3.PAINTS:

ALL CONTAINERS MUST BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT MUST NOT BE DISCHARGED TO THE STORM SEWER SYSTEM BUT MUST BE DISPOSED OF PROPERLY ACCORDING TO

MANUFACTURER'S INSTRUCTIONS OR STATE AND LOCAL REGULATIONS..

WASTE DISPOSAL

IN ADDITION TO GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTION

THE FOLLOWING PRACTICES MUST BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP:

1. MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP MUST BE CLEARLY POSTED AND SITE PERSONNEL MUST BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEANUP SUPPLIES.

2. MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP MUST BE KEPT IN THE MATERIAL STORAGE AREA ON SITE. EQUIPMENT AND MATERIALS MUST INCLUDE BUT NOT BE LIMITED TO BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, KITTY LITTER, SAND, SAWDUST AND PLASTIC OR METAL TRASH CONTAINERS SPECIFICALLY FOR

THIS PURPOSE

3. ALL SPILLS MUST BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.

4. THE SPILL AREA MUST BE KEPT WELL VENTILATED AND PERSONNEL MUST WEAR APPROPRIATE PROTECTIVE

CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.

5. SPILLS OF TOXIC OR HAZARDOUS MATERIAL MUST BE REPORTED TO THE APPROPRIATE STATE OR LOCAL

GOVERNMENT AGENCY, REGARDLESS OF THE SIZE.

6. THE SPILL PREVENTION PLAN MUST BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM RECURRING AND HOW TO CLEANUP THE SPILL IF IT RECURS. A DESCRIPTION OF THE SPILL, ITS CAUSE, AND THE

CLEANUP MEASURES MUST BE INCLUDED.

7. THE SITE SUPERINTENDENT RESPONSIBLE FOR DAY-TO-DAY SITE OPERATIONS MUST BE THE SPILL PREVENTION AND

CLEANUP COORDINATOR.

SPILL CONTROL PRACTICES

1. EFFORTS SHOULD BE MADE TO PERFORM EQUIPMENT/ VEHICLE FUELING AND MAINTENANCE AT AN OFF-SITE FACILITY.

2. IF OFF-SITE FACULTIES FROM NOTE 1 CANNOT BE ESTABLISHED, THE CONTRACTOR MUST PROVIDE A CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPROVED ON-SITE FUELING AND MAINTENANCE AREA THAT IS CLEAN AND DRY.

3. IF POSSIBLE KEEP AREA COVERED.

4. KEEP A SPILL KIT AT THE FUELING AND MAINTENANCE AREA.

5. VEHICLES MUST BE INSPECTED REGULARLY FOR LEAKS AND DAMAGE.

6. USE DRIP PANS, DRIP CLOTHS, OR ABSORBENT PADS WHEN REPLACING SPENT FLUID.

7. VEHICLES MUST BE INSPECTED FOR LEAKS ON A DAILY BASIS PRIOR TO ARRIVAL ON-SITE. THE CONTRACTOR SHALL MAINTAIN A VEHICLE INSPECTION LOG AT THE JOB SITE AVAILABLE AT THE CONTRACTOR'S JOB TRAILER DOCUMENTING THE DAILY INSPECTIONS AND ANY ISSUES OR MAINTENANCE PERFORMED DOCUMENTED IN THE LOG. SEE SPECIFICATION 01 57 20.

VEHICLE FUELING AND MAINTENANCE PRACTICES:

1. THE CONTRACTOR MUST COORDINATE MATERIAL STORAGE AND LAYDOWN AREAS WITH THE CONTRACTING OFFICER.

LIMITED PARKING FOR CONTRACTOR EMPLOYEES WITHIN THE PROJECT SITE WILL BE PERMITTED WITH THE APPROVAL OF

THE CONTRACTING OFFICER.

2. THE CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING TRAFFIC FLOW DURING CONSTRUCTION MAINTAINING EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING PROGRESS OF THE WORK WHERE POSSIBLE.

PROVIDE ADDITIONAL SIGNAGE AS NECESSARY TO DIRECT VEHICLES AND PEDESTRIANS AROUND CONSTRUCTION SITE.

3. THE CONTRACTOR MUST COMPLY WITH ALL APPLICABLE O.S.H.A., EM 385-1-1, REGULATIONS AND SAFETY REQUIREMENTS.

4. CONTRACTOR MUST PROVIDE A NEW HAMPSHIRE STATE LICENSED SURVEYOR ON SITE CAPABLE OF PROVIDING

HORIZONTAL (STATE PLANE COORDINATE SYSTEM) AND VERTICAL CONTROL (NAVD 1988).

5. ALL SURPLUS MATERIAL, AS DETERMINED BY THE CONTRACTING OFFICER, MUST BECOME THE PROPERTY OF THE

CONTRACTOR AND MUST BE DISPOSED OF OFF THE SITE.

6. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH VELOCITY WINDS AND BE PREPARED BY A

PROFESSIONAL SIGN COMPANY.

7. THE EXPOSED SOIL SURFACE MUST BE MOISTENED PERIODICALLY WITH ADEQUATE WATER TO CONTROL DUST. EXPOSED SOIL SURFACES MUST BE MINIMIZED TO LIMIT EROSION. CONTRACTOR MUST COMPLY WITH NHDES CONSTRUCTION ACTIVITIES BEST MANAGEMENT PRACTICES (BMPs) AT ALL TIMES.

8. THE CONTRACTOR MUST BE RESPONSIBLE TO MAKE THE SITE SAFE FOR USERS AT ALL TIMES. INSTALL BARRIERS, SIGNS

AND OTHER MEANS AS REQUIRED TO MAKE THE SITE SAFE.

9. THE CONTRACTOR MUST FLUSH AND DISINFECT WATER MAINS IN ACCORDANCE WITH AWWA C651 REQUIREMENTS.

10. CONTRACTOR MUST DEVELOP AN EXCAVATION PLAN FOR ALL TRENCHING OPERATIONS. EXCAVATION PLAN MUST BE IN

ACCORDANCE WITH ALL OSHA REQUIREMENTS AND EM 385-1-1.

11. PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT. FIELD ADJUSTMENTS TO FINAL

GRADES MAY BE NECESSARY. ENSURE POSITIVE DRAINAGE IN AREAS TO BE PAVED.

1. EXISTING UTILITIES SHOWN ON THE PROJECT DRAWINGS ARE LOCATED APPROXIMATELY AND MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE REPAIRS OF ALL

DAMAGED UTILITIES DURING CONSTRUCTION AT NO COST TO THE GOVERNMENT.

2. THE CONTRACTOR MUST ARRANGE FOR ANY TEMPORARY UTILITY CONNECTIONS THAT MAY BE REQUIRED DURING

CONSTRUCTION.

3. EXISTING UTILITIES TO REMAIN IN OPERATION MUST BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UTILITIES TO REMAIN MUST BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.

4. THE CONTRACTOR IS RESPONSIBLE FOR CALLING DIG-SAFE 72 HOURS PRIOR TO COMMENCEMENT OF EXCAVATION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING PRIVATELY OWNED UTILITIES ON SITE. COST FOR LOCATING UTILITIES

WITHIN THE PROJECT AREA IS THE CONTRACTOR'S RESPONSIBILITY.

5. WHERE CONTRACTOR ENCOUNTERS EXISTING INACTIVE UTILITY PIPES OR CONDUIT WITHIN THE LIMIT OF EXCAVATION FOR THE WORK OF THE PROJECT, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.

CONTRACTOR MUST REMOVE THE PIPES AND/OR CONDUIT, WITHIN THOSE LIMITS OF EXCAVATION THAT ARE NO LONGER REQUIRED TO BE ACTIVE. AT LIMITS OF EXCAVATION, PLUG AND ABANDON REMAINING PIPES AND CONDUITS IN PLACE.

6. CONTRACTOR MUST PROVIDE HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES ENCOUNTERED OR ABANDONED ON

RECORD DRAWINGS AT THE COMPLETION OF WORK.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL DUST THROUGHOUT THE CONSTRUCTION PERIOD. DUST CONTROL METHODS MUST INCLUDE, BUT BE NOT LIMITED TO, SPRINKLING WATER ON EXPOSED AREAS, COVERING LOADED DUMP TRUCKS LEAVING THE SITE, AND TEMPORARY MULCHING. DUST CONTROL MEASURES MUST BE UTILIZED SO AS TO PREVENT THE MIGRATION OF DUST FROM THE SITE TO ABUTTING AREAS. FUGITIVE DUST MUST BE CONTROLLED IN ACCORDANCE WITH NHDES EROSION AND SEDIMENTATION CONTROL BEST PRACTICES.

DUST CONTROL:

1. THE CONCRETE CONTRACTOR SHOULD BE ENCOURAGED WHERE POSSIBLE, TO USE WASHOUT FACILITIES AT THEIR OWN PLANT

OR DISPATCH FACILITY.

2. IF IT IS NECESSARY, SITE CONTRACTOR MUST DESIGNATE SPECIFIC WASHOUT AREAS AND DESIGN FACILITIES TO HANDLE

ANTICIPATED WASHOUT WATER.

3. WASHOUT AREAS MUST ALSO BE PROVIDED FOR PAINT AND STUCCO OPERATIONS.

4. ATTEMPTS MUST BE MADE TO LOCATE WASHOUT AREA A LEAST 50 YARDS AWAY FROM STORM DRAINS AND WATER WAYS

WHENEVER POSSIBLE.

5. INSPECT WASHOUT FACILITIES DAILY TO DETECT LEAKS OR TEARS AND TO IDENTIFY WHEN MATERIALS NEED TO BE REMOVED.

CONCRETE WASHOUT AREA:

1. DISCHARGES FROM FIRE-FIGHTING ACTIVITIES

2. FIRE HYDRANT FLUSHINGS

3. WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED

4. WATER USED TO CONTROL DUST

5. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS

6. ROUTINE EXTERNAL BUILDING WASH DOWN -NO DETERGENTS

7. PAVEMENT WASH WATERS -NO SPILLS OR DETERGENTS

8. UNCONTAMINATED AIR CONDITIONING/COMPRESSOR CONDENSATE

9. UNCONTAMINATED GROUND WATER OR SPRING WATER

10. FOUNDATION OR FOOTING DRAINS -NOT CONTAMINATED

11. LANDSCAPE IRRIGATION

ALLOWABLE NON-STORMWATER DISCHARGES:

THE PROJECT MUST MEET THE REQUIREMENTS AND INTENT OF NH RSA 430:53 AND NH

DEPT. OF AGRICULTURE AGR 3800 RELATIVE TO INVASIVE SPECIES.

INVASIVE SPECIES:

C-001

C I V

N

E R

T

E S

Z R

J

Z R

J

L D

A

C

D

W

SAWCUT AND REMOVE

EXISTING ±6" THICK

CONCRETE SLAB, ±13,400 SF

EXISTING CHAIN LINK FENCE TO BE

DEMOLISHED BY OTHERS PRIOR TO

CONTRACTOR MOBILIZATION ON

SITE.

SAWCUT AND REMOVE EXISTING

ASPHALT PAVING, ±335 SF

SAWCUT AND REMOVE EXISTING

ASPHALT PAVING, ±140 SF

REMOVE GRASS AND TOPSOIL FOR

ASPHALT ENTRANCE, ±1,450 SF

LEAN-TO AND SHED TO BE

DEMOLISHED BY OTHERS

PRIOR TO CONTRACTOR

MOBILIZATION ON SITE.

INSTALL INLET PROTECTION PRIOR TO

DEMOLITION

A1 C-502

LIMIT OF CONCRETE SAWCUT

N:44,7370.51 E:823,691.92

LIMIT OF CONCRETE SAWCUT

N:447,356.87 E:823,726.16

LIMIT OF CONCRETE SAWCUT

N:447,316.14 E:823,709.93

LIMIT OF CONCRETE SAWCUT

N:447,285.22 E:823,787.54

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

0 20' 40'

Scale: 1" = 20'-0"

SCALE 1"=20'-0"

SITE DEMOLITION PLANA1

CD-101

S I T

E

D

E M

O L

I T

I O

N

P

L A

N

Z R

J

Z R

J

L D

A

C

D

W G

KEYED NOTES:

DEMOLISH AND DISPOSE OF HAZARDOUS MATERIALS SHED

SHED MEASURES 11'-8" EXTERIOR (10'-8" INTERIOR) BY 8'-8"

EXTERIOR (7'-8" INTERIOR) X 8'-9" TALL (INTERIOR) AND

CONSISTS OF FOLLOWING:

· CONCRETE FLOOR

· PAINTED GYP WALLS

· METAL DOOR (6'-8", 34" WIDTH)

· VINYL COVE BASE

· SHELVING ON 2X4S

· TWO LIGHT FIXTURES (CLG MOUNTED) -

· ELECTRIC UNIT HEATER

· ELECTRICAL PANEL

· TWO ROOF VENTS

· ONE WINDOW (3'X4')

DEMOLISH AND DISPOSE OF WOOD FRAMED SHED (BY OTHERS

PRIOR TO CONTRACTOR MOBILIZATION TO THE SITE)

SHED MEASURES 15'X11'X7' TALL (INTERIOR DIMENSIONS) AND

CONSISTS OF THE FOLLOWING:

· VINYL FLOORING

· PLYWOOD SHEATHING

· WINDOW

· FOUR LIGHT FIXTURES

· WIREWAYS WITH OUTLETS THROUGHOUT

· ROOF SHINGLES

· ELECTRICAL PANEL (OUT OF SERVICE)

PROTECT T.C.E. EXTRACTION WELL BUILDINGS, WELLS, WATER

LINES, AND ELECTRICAL LINES DURING CONSTRUCTION.

NOTES:

1. SEE SHEET C-101 FOR HORIZONTAL AND VERTICAL BENCHMARKS.

2. HAZARDOUS MATERIAL SCREENING OF THE TWO SHEDS TO BE

DEMOLISHED FOUND THE LIGHTING FIXTURES IN BOTH SHEDS TO

CONTAIN MERCURY. NO OTHER HAZARDOUS MATERIALS (ACM,

LEAD, PCBs) WERE IDENTIFIED.

PROPERTY LINE

PROPOSED

35'x70' CONCRETE

PAD EXTENSION

ASPHALT PATCH, ±335 SF

PROPOSED ASPHALT

ENTRANCE, ±1,810 SF

2" WATER SERVICE WITH

CURB STOP

6" PVC SDR 35 SANITARY SEWER LINE INV. : 454.19 (VIF)

CONNECT TO EXISTING 10" CAST IRON (VIF) SANITARY

SEWER MAIN

RE-ROUTE EXISTING RISER AND

PROVIDE NEW SINGLE 4" CONDUIT

TO SECTIONALIZING CABINET.

PROVIDE NEW 13.2KV - 480/277V TRANSFORMER AND PRE-CAST

CONCRETE TRANSFORMER PAD, SEE ELECTRICAL ONE-LINE ON E-501

(2) x 5" CONCRETE ENCASED

DUCT BANK FOR

ELECTRICAL SERVICE.

WATER SERVICE

ENTRANCE LOCATION

N: 447,219.20 E: 823,711.92

(2) x 5" CONCRETE ENCASED DUCT

BANK FOR SCADA/ FIBER SERVICE.

REPLACE ASPHALT

PAVING, ±140 SF

ASPHALT PAVING, ±4,000 SF

PIER FOUNDATION (TYPE P3) FOR

MECHANICAL EQUIPMENT, SEE SHEET

S-502 (TYP. x8), COORDINATE PIER LAYOUT

WITH EQUIPMENT MANUFACTURER

CONNECT TO

EXISTING 6" DUCTILE

IRON WATER MAIIN

PROPOSED 4,800 SF BUILDING

FFE: 467.50

C5 C-503

C5 C-503

A1 C-503

C1 C-503

B3 C-503

B1 C-503

C1 S-502

C5 C-503

A4 C-503

PROVIDE THREE PHASE

SECTIONALIZING CABINET. SEE

ELECTRICAL ONE-LINE ON E-501.

C1 C-503

PROVIDE SINGLE NEW 4" CONDUIT

FROM SECTIONALIZING CABINET TO

EXISTING CONDUIT RUN.

C5 C-503

BOLLARD (TYP. x11) C4 C-503

COLUMN GRID INTERSECTION

LOCATION A.1:

N:447,244.79 E:823,649.48

COLUMN GRID INTERSECTION

LOCATION D.3:

N:447,274.97 E: 823,740.80

EDGE OF CONCRETE PAD

N:447,354.63 E:823,813.53

BUILDING CORNER

N:447,168.55 E:823,810.08

C3 C-503

SAW CUT OR FORM CONTROL

JOINTS IN ACCORDANCE WITH

ACI 224.3R RECOMMENDATIONS

A2 C-503

(3) x 5" CONCRETE ENCASED

DUCT BANK FOR

ELECTRICAL SERVICE.

C5 C-503

A1 C-503

TEMPORARY BENCHMARK:

TOP BONNET BOLT ON NORTHEAST

SIDE OF HYDRANT.

ELEVATION: 469.78

N: 447,177.19 E: 823,623.34

SANITARY SEWER CLEANOUT

SANITARY SEWER INV.: 463.50

CONCRETE/BITUMINOUS

PAVING JOINT, TYP.

B5 C-503

A4 C-503

0 20' 40'

Scale: 1" = 20'-0"

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

NOTES:

1. SEE SPECIFICATION 02 61 13 FOR SOIL TESTING AND HANDLING

REQUIREMENTS, AND 02 81 00 FOR TRANSPORTATION AND

HANDLING OF CONTAMINATED MATERIAL REQUIREMENTS

KEYED NOTES:

A SEPARATELY AWARDED PROJECT WILL PROVIDE SCADA/

FIBER PATHWAYS TO APPROXIMATELY THIS LOCATION.

CONTRACTOR TO LOCATE AND INTERCEPT TWO OF THE

EXISTING PATHWAYS PREVIOUSLY INSTALLED AND CONTINUE

TO PROPOSED BUILDING.

SINGLE ABA COMPLIANT PARKING SPACE

LOAM AND SEED ALL DISTURBED AREAS, SEE "INSTALLATION-

MAINTENANCE AND INSPECTION PROCEDURES OF EROSION

AND SEDIMENT CONTROLS" SECTIONS J & K, SHEET C-501

SCALE: 1"=20'-0"

SITE PLANA1

C-101

S I T

E

P

L A

N

Z R

J

Z R

J

L D

A

C

D rim:467.68' rim:465.95' inv.:462.0'

UG

E

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

W

#17 #16

UGE

UGE

UGE

W

W

UGE

UGE

UG

E

UGE

UG

E

UG

E

UG

E

UG

E

W

W

W

W

468 468

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S=0.05%

S= 2.0

S= 3.3

S= 2.9

S= 3.2

S=3.2%

S= 2.5

S= 2.5

467.50

467468

467.10

467.90

467.50

467.50

467.40

467.20

467.50

PROPOSED 4,800 SF BUILDING

FFE: 467.50

INLET

PROTECTION

SILT FENCE

(TYP. x ±280 LF )

A1 C-502

C1, C3 C-502

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

0 20' 40'

Scale: 1" = 20'-0"

NOTES:

1. SEE SPECIFICATION 02 61 13 FOR SOIL TESTING AND HANDLING

REQUIREMENTS, AND 02 81 00 FOR TRANSPORTATION AND

HANDLING OF CONTAMINATED MATERIAL REQUIREMENTS

SCALE: 1"=20'-0"

SITE GRADING AND EROSION CONTROL PLANA1

C-102

S I T

E

G

R A

D I N

G

A

O

S I O

N

C

O N

T R

A

N

Z R

J

Z R

J

L D

A

C

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

SEQUENCE OF MAJOR ACTIVITIES

THE CONSTRUCTION SEQUENCE MUST LIMIT THE DURATION AND AREA OF DISTURBANCE.

1. CONSTRUCT TEMPORARY AND PERMANENT SEDIMENT, EROSION CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED PRIOR TO ANY EARTH MOVING OPERATIONS THAT MUST INFLUENCE STORMWATER RUNOFF SUCH AS

- NEW CONSTRUCTION

- EXCAVATION WORK

2. CLEAR AND DISPOSE OF DEBRIS.

3. ALL ROADS AND PARKING AREAS MUST BE STABILIZED WITHIN 72 HOURS OF ACHIEVING FINISHED GRADE.

4. BEGIN PERMANENT AND TEMPORARY SEEDING AND MULCHING. ALL CUT AND FILL SLOPES MUST BE SEEDED AND MULCHED WITHIN 72 HOURS OF

ACHIEVING FINISHED GRADE.

5. DAILY, OR AS REQUIRED, CONSTRUCT TEMPORARY BERMS, DRAINS, DITCHES, SILT FENCES, SEDIMENT TRAPS, ETC., MULCH AND SEED AS REQUIRED.

6. INSPECT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES.

7. COMPLETE PERMANENT SEEDING AND LANDSCAPING.

8. REMOVE TRAPPED SEDIMENTS FROM COLLECTOR DEVICES AS APPROPRIATE AND THEN REMOVE TEMPORARY EROSION CONTROL MEASURES.

EROSION AND SEDIMENT CONTROLS AND STABILIZATION PRACTICES

A. STABILIZATION MUST BE INITIATED ON ALL LOAM STOCKPILES AND DISTURBED AREAS WHERE CONSTRUCTION ACTIVITY MUST NOT OCCUR FOR MORE

THAN TWENTY ONE (21) CALENDAR DAYS. BY THE FOURTEENTH (14TH) DAY AFTER CONSTRUCTION ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED

IN THAT AREA. STABILIZATION MEASURES TO BE USED INCLUDE:

1. TEMPORARY SEEDING

2. MULCHING

B. DURING CONSTRUCTION, RUNOFF MUST BE DIVERTED AROUND THE SITE WITH EARTH DIKES, PIPING OR STABILIZED CHANNELS WHERE POSSIBLE. SHEET RUNOFF FROM THE SITE MUST BE FILTERED THROUGH HAYBALE BARRIERS AND SILT FENCES. ALL STORM DRAIN BASIN INLETS MUST BE PROVIDED WITH FLARED END SECTIONS AND TRASH RACKS. THE SITE MUST BE STABILIZED FOR THE WINTER BY NOVEMBER 15.

C. AN AREA MUST BE CONSIDERED STABLE WHEN ONE OF THE FOLLOWING HAS OCCURRED:

1. BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED.

2. A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED.

3. A MINIMUM OF 3" OF NON-EROSIVE MATERIAL SUCH STONE OR RIPRAP HAS BEEN INSTALLED.

4. EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED.

D. WINTER STABILIZATION PRACTICES (NOVEMBER 15TH THROUGH MAY 1ST):

1. ALL PROPOSED POST-DEVELOPMENT VEGETATED AREAS WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATED GROWTH BY NOVEMBER 15TH, OR

WHICH ARE DISTURBED AFTER NOVEMBER 15TH. MUST BE STABILIZED BY SEEDING AND INSTALLING EROSION CONTROL BLANKETS ON SLOPES GREATER THAN 4:1, AND SEEDING AND PLACING 3 TO 4 TONS OF MULCH PER ACRE, SECURE WITH ANCHOR NETTING, ELSEWHERE.

2. ALL DITCHES OR SWALES WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15TH, OR WHICH ARE DISTURBED AFTER OCTOBER 15TH, MUST BE STABILIZED WITH STONE OR EROSION CONTROL BLANKETS APPROPRIATE FOR THE DESIGN FLOW CONDITION.

3. AFTER NOVEMBER 15TH, INCOMPLETE ROAD OR PARKING SURFACES MUST BE PROTECTED WITH A MINIMUM OF 3-INCHES OF CRUSHED GRAVEL PER NHDOT ITEM 304.3, OR IF CONSTRUCTION IS TO CONTINUE THROUGH THE WINTER SEASON BE CLEARED OF ANY ACCUMULATED SNOW AFTER EACH

STORM EVENT.

OFF SITE VEHICLE TRACKING

THE CONTRACTOR MUST CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE(S) PRIOR TO ANY EXCAVATION ACTIVITIES. DEBRIS AND SEDIMENT TO BE CLEARED

FROM STABILIZED CONSTRUCTION ENTRANCE VICINITY DAILY.

INSTALLATION- MAINTENANCE AND INSPECTION PROCEDURES OF EROSION AND SEDIMENT CONTROLS

A. GENERAL

THESE ARE THE GENERAL INSPECTION AND MAINTENANCE PRACTICES THAT MUST BE USED TO IMPLEMENT THE PLAN.

1. ALL SWALES MUST BE STABILIZED PRIOR TO DIRECTING FLOW TO THEM.

2. THE SMALLEST PRACTICAL PORTION OF THE SITE MUST BE DENUDED AT ONE TIME. UNDER NO CIRCUMSTANCES MUST MORE THAN 5.0 ACRES OF THE

PROJECT SITE BE UNSTABILIZED AT ONE TIME.

3. ALL CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF 1/2 INCH OR GREATER.

4. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT MUST BE INITIATED WITHIN 24 HOURS OF REPORT.

5. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE OR HAYBALE BARRIERS WHEN IT HAS REACHED ONE THIRD THE HEIGHT OF THE FENCE OR

BALE.

6. ALL DIVERSION DIKES MUST BE INSPECTED AND ANY BREACHES PROMPTLY REPAIRED.

7. TEMPORARY SEEDING AND PLANTING MUST BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND UNHEALTHY GROWTH.

8. A MAINTENANCE INSPECTION REPORT MUST BE MADE AFTER EACH INSPECTION.

9. A REPRESENTATIVE OF THE SITE CONTRACTOR MUST BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE AND REPAIR ACTIVITIES, AND FILLING OUT THE

INSPECTION AND MAINTENANCE REPORT.

10.THE EROSION CONTROL PROCEDURES MUST CONFORM TO THE "NEW HAMPSHIRE STORMWATER MANUAL, VOL 3, EROSION AND SEDIMENT CONTROLS

DURING CONSTRUCTION" PREPARED BY COMPREHENSIVE ENVIRONMENTAL, INC. AND THE NHDES.

B. ALL FILLS MUST BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE, OR OTHER RELATED PROBLEMS. FILL

INTENDED TO SUPPORT BUILDINGS, STRUCTURES, AND CONDUITS, ETC., MUST BE COMPACTED IN ACCORDANCE WITH LOCAL CODES OR SPECIFICATIONS.

C. THE USE OF SAND FOR THE PURPOSE OF PEDESTRIAN SAFETY AND SAFE DRIVING CONDITION MUST BE MINIMIZED.

D. SILT SOCK

1. APPLICATION - SILT SOCKS MUST BE INSTALLED DOWN-SLOPE OF ANY DISTURBED AREA REQUIRING EROSION AND SEDIMENT CONTROL AND FILTRATION OF SOLUBLE POLLUTANTS FROM RUNOFF. SILT SOCKS ARE EFFECTIVE WHEN INSTALLED PERPENDICULAR TO SHEET OR LOW CONCENTRATED FLOW.

2. INSTALLATION DETAILS

a. SILT SOCKS USED FOR PERIMETER CONTROL OF SEDIMENT AND SOLUBLE POLLUTANTS IN STORM RUNOFF MUST MEET FILTREXX SOCK MATERIAL

SPECIFICATIONS AND USE CERTIFIED FILTREXX FILTER MEDIA, OR APPROVED EQUAL.

b. SILT SOCKS MUST BE PLACED BY QUALIFIED CONTRACTOR PERSONNEL AND AS DIRECTED BY THE CONTRACTING OFFICER.

c. SILT SOCKS SHOULD BE INSTALLED PARALLEL TO THE BASE OF THE SLOPE OR OTHER DISTURBED AREA. IN EXTREME CONDITIONS (i.e. 2:1 SLOPES).

A SECOND SILT SOCK ," MUST BE CONSTRUCTED AT THE TOP OF THE SLOPE.

d. STAKES MUST BE INSTALLED THROUGH THE MIDDLE OF THE SILT SOCK ON 10 FT CENTERS, USING 2 INCH BY 2 INCH BY 3 FEET WOODEN STAKES. IN

THE EVENT STAKING IS NOT POSSIBLE (i.e., WHEN SILT SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS MUST BE USED BEHIND THE

SILT SOCK TO HELP STABILIZE DURING RAINFALL/RUNOFF EVENTS.

e. STAKING DEPTH FOR SAND AND SILT LOAM SOILS MUST BE 12 INCHES AND 8 INCHES FOR CLAY SOILS.

f. LOOSE COMPOST MAY BE BACKFILLED ALONG THE UP-SLOPE SIDE OF THE SILT SOCK, FILLING THE SEAM BETWEEN THE SOIL SURFACE AND THE

DEVICE. IMPROVING FILTRATION AND SEDIMENT RETENTION.

g. IF THE SILT SOCK IS TO BE LEFT AS A PERMANENT FILTER OR PART OF THE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION

FOR ESTABLISHMENT OF PERMANENT VEGETATION.

h. SILT SOCKS ARE NOT TO BE USED IN PERENNIAL. EPHEMERAL. OR INTERMITTENT STREAMS.

i. SEE DETAIL FOR CORRECT SILT SOCK INSTALLATION.

E. FILTERS

1.SILT FENCE

a. SYNTHETIC FILTER FABRIC MUST BE A PERVIOUS SHEET OF PROPYLENE, NYLON, POLYESTER OR ETHYLENE YARN AND MUST BE

CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:

PHYSICAL PROPERTY REQUIREMENTS

FILTERING EFFICIENCY TENSILE STRENGTH AT 20X MAXIMUM ELONGATION*

VTM-51 75X MINIMUM

VTM-52 EXTRA STRENGTH 50 LB/LINEAR IN (MIN.)

STANDARD STRENGTH

30 LB/LINEAR IN (MIN.)

FLOW RATE VTM-51 0.3 GAL/SF/MIN (MIN.)

*REQUIREMENTS REDUCED BY 50 PERCENT AFTER SIX (6) MONTHS OF INSTALLATION.

b. SYNTHETIC FILTER FABRIC MUST CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF SIX (6) MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 DEGREES F TO 120 DEGREES F. THE HEIGHT

OF A SILT FENCE MUST NOT EXCEED THIRTY-SIX (36) INCHES.

c. THE FILTER FABRIC MUST BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH MUST BE SPLICED TOGETHER ONLY AT SUPPORT POST. WITH A MINIMUM SIX

(6) INCH OVERLAP AND SECURELY SEALED.

d. POSTS MUST BE SPACED A MAXIMUM OF TEN (10) FEET APART AT THE BARRIER LOCATION AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 16 INCHES). WHEN EXTRA STRENGTH FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING MUST NOT

EXCEED 6 FEET.

e. POSTS FOR SILT FENCES MUST BE EITHER 4-INCH DIAMETER WOOD OR 1.33 POUNDS PER LINEAR FOOT STEEL WITH A LENGTH OF 5

FEET. STEEL POSTS MUST HAVE A MESH SPACING OF 6 INCHES.

f. WIRE FENCE REINFORCEMENT FOR SILT FENCES USING STANDARD STRENGTH FILTER CLOTH MUST BE A MINIMUM OF 42 INCHES IN

HEIGHT, OF 14 GAUGE AND MUST HAVE PROJECTIONS FOR FASTENING WIRE TO THEM.

g. A TRENCH MUST BE EXCAVATED APPROXIMATELY FOUR (4) INCHES WIDE AND FOUR (4) INCHES DEEP ALONG THE LINE OF POSTS AND

UPSLOPE FROM THE BARRIER.

h. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE MUST BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST ONE (1) INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE

MUST EXTEND 36 INCHES ABOVE THE ORIGINAL GROUND SURFACES.

i. THE 'STANDARD STRENGTH' FILTER FABRIC MUST BE STAPLED OR WIRED TO THE FENCE, AND EIGHT (8) INCHES OF THE FABRIC MUST BE EXTENDED INTO THE TRENCH. THE FABRIC MUST NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE.

FILTER FABRIC MUST NOT BE STAPLED TO EXISTING TREES.

j. WHEN EXTRA STRENGTH FILTER FABRIC AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF

ITEM (I) APPLYING.

k. THE TRENCH MUST BE BACKFILLED AND THE SOIL COMPACTED OVER THE FILTER FABRIC.

l. SILT FENCES MUST BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE BUT NOT BEFORE THE UP-SLOPE AREAS HAS

BEEN PERMANENTLY STABILIZED.

2. SEQUENCE OF INSTALLATION - SEDIMENT BARRIERS MUST BE INSTALLED PRIOR TO ANY SOIL DISTURBANCE OF THE CONTRIBUTING

DRAINAGE AREA ABOVE THEM.

3. MAINTENANCE

a. STRAW/HAY BALE BARRIER AND SILT FENCE BARRIERS MUST BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL THEY MUST BE REPAIRED IF THERE ARE ANY SIGNS OF EROSION OR SEDIMENTATION BELOW THEM. ANY REQUIRED REPAIRS MUST BE MADE IMMEDIATELY. IF THERE ARE SIGNS OF UNDERCUTTING AT THE CENTER OR THE EDGES, OR IMPOUNDING OF LARGE VOLUMES OF WATER BEHIND THEM, SEDIMENT BARRIERS MUST BE REPLACED WITH A

TEMPORARY CHECK DAM.

b. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC MUST BE REPLACED PROMPTLY.

c. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH

APPROXIMATELY ONE-THIRD (1/3) THE HEIGHT OF THE BARRIER.

d. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED MUST BE

DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.

F. MULCHING

1. TIMING

IN ORDER FOR MULCH TO BE EFFECTIVE, IT MUST BE IN PLACE PRIOR TO MAJOR STORM EVENTS. THERE ARE TWO (2) TYPES OF

STANDARDS WHICH MUST BE USED TO ASSURE THIS:

a. APPLY MULCH PRIOR TO ANY STORM EVENT. IT WILL BE NECESSARY TO CLOSELY MONITOR WEATHER PREDICTIONS, USUALLY BY

CONTACTING THE NATIONAL WEATHER SERVICE IN CONCORD, TO HAVE ADEQUATE WARNING OF SIGNIFICANT STORMS.

b. REQUIRED MULCHING WITHIN A SPECIFIED TIME PERIOD. THE TIME PERIOD CAN RANGE FROM 14 TO 21 DAYS OF INACTIVITY ON A

AREA, THE LENGTH OF TIME VARYING WITH SITE CONDITIONS. PROFESSIONAL JUDGMENT MUST BE USED TO EVALUATE THE INTERACTION OF SITE CONDITIONS (SOIL ERODIBILITY, SEASON OF YEAR, EXTENT OF DISTURBANCE, PROXIMITY TO SENSITIVE RESOURCES, ETC.) AND THE POTENTIAL IMPACT OF EROSION ON ADJACENT AREAS TO CHOOSE AN APPROPRIATE TIME RESTRICTION.

2. APPLICATION RATE

MULCH MUST BE APPLIED AT A RATE OF BETWEEN 1.5 TO 2 TONS PER ACRE, OR 90 TO 100 POUNDS PER 1000 SQUARE FEET. THE MINIMUM MULCH REQUIREMENT, REGARDLESS OF APPLICATION RATE IS THAT SOIL MUST NOT BE VISIBLE.

3. GUIDELINES FOR WINTER MULCH APPLICATION.

WHEN MULCH IS APPLIED TO PROVIDE PROTECTION OVER WINTER (PAST THE GROWING SEASON) IT MUST BE AT A RATE OF 6.000 POUNDS OF HAY OR STRAW PER ACRE. A TACKIFIER MAY BE ADDED TO THE MULCH. NO MULCH IS TO BE APPLIED OVER MORE THAN TWO (2) INCHES OF SNOW. IF SNOW DEPTH IS GREATER THAN TWO (2) INCHES IT MUST BE REMOVED BEFORE MULCHING.

4. MAINTENANCE

ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAINSTORMS, TO CHECK FOR RILL EROSION. IF LESS THAN 90X OF THE SOIL SURFACE IS COVERED BY MULCH. ADDITIONAL MULCH MUST BE IMMEDIATELY APPLIED.

5. EXCELSIOR MATTING

EXCELSIOR MATTING, OR APPROVED EQUAL, MUST BE USED IN PLACE OF MULCH ON ALL SLOPES STEEPER THAN 3:1.

6. SLOPES

ALL SLOPES GREATER THAN 15% DURING THE REGULAR CONSTRUCTION SEASON ARE TO HAVE NETTING OVER MULCH OR COMBINATION EROSION CONTROL MAT USED (MULCH AND NET). THIS APPLIES TO ALL SLOPES GREATER THAN 8% AFTER OCTOBER 1. MULCHING IS

REQUIRED OVER HYDROSEEDING.

G. TEMPORARY GRASS COVER

1. SEEDBED PREPARATION

APPLY FERTILIZER AT THE RATE OF 600 POUNDS PER ACRE OF 10-10-10. APPLY LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS

MAGNESIUM OXIDE) AT A RATE OF THREE (3) TONS PER ACRE.

2. SEEDING

a. UTILIZE ANNUAL RYE GRASS AT A RATE OF 40 LBS/ACRE.

b. WHERE THE SOIL HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS, LOOSEN SOIL TO A DEPTH OF TWO (2) INCHES BEFORE

APPLYING FERTILIZER, LIME AND SEED.

c. APPLY SEED UNIFORMLY BY HAND. CYCLONE SEEDER, OR HYDROSEEDER (SLURRY INCLUDING SEED AND FERTILIZER).

HYDROSEEDINGS, WHICH INCLUDE MULCH,MAY BE LEFT ON SOIL SURFACE. SEEDING RATES MUST BE INCREASED 10% WHEN

HYDROSEEDING.

3. MAINTENANCE

TEMPORARY SEEDINGS MUST BE PERIODICALLY INSPECTED. AT A MINIMUM, 95% OF THE SOIL SURFACE SHOULD BE COVERED BY VEGETATION. IF ANY EVIDENCE OF EROSION OR SEDIMENTATION IS APPARENT, REPAIRS MUST BE MADE AND OTHER TEMPORARY

MEASURES USED IN THE INTERIM (MULCH, FILTER BARRIERS, CHECK DAMS, ETC.).

H. PERMANENT MULCHING

1. TIMING

a. APPLYING PLANT RESIDUES OR OTHER SUITABLE MATERIALS THAT RESIST DECOMPOSITION SUCH AS WOOD CHIPS OR CRUSHED STONE TO THE SOIL SURFACE WHERE VEGETATION STABILIZATION IS EITHER IMPRACTICAL OR DIFFICULT TO ESTABLISH.

b. WINTER STABILIZATION MUST MEET OR EXCEED THE FOLLOWING REQUIREMENTS.

2. CONSIDERATIONS

a. PERMANENT MULCHING MUST BE USED TO STABILIZE CHRONIC EROSION AREAS WHICH RECEIVE HEAVY FOOT OR VEHICLE TRAFFIC.

NOT INTENDED FOR AREAS OF CONCENTRATED FLOWS.

b. IF WOOD CHIPS ARE USED IN LANDSCAPED AREAS (TREES & SHRUBS). A SUPPLEMENTAL APPLICATION OF CHEMICAL FERTILIZER SHOULD BE APPLIED AT A RATE OF TWO POUNDS OF 5-10-5 PER 100 SQUARE FEET OF MULCH.

c. IF CRUSHED STONE IS USED, A PLASTIC FILTER CLOTH MUST BE PLACED BETWEEN THE GROUND AND THE STONE.

3. SPECIFICATIONS

a. WOOD CHIPS OR AGGREGATE MUST BE USED ON SLOPES NO STEEPER THAN 3 HORIZONTALLY ON 1 VERTICALLY.

b. PERMANENT MULCH MUST BE 3 INCHES OR MORE IN DEPTH.

c. WOOD CHIPS MUST BE APPLIED AT A RATE OF 500-900 POUNDS PER 1,000 SQUARE FEET OR 10-20 TONS PER ACRE. WOOD CHIPS

MUST BE GREEN OR AIR-DRIED AND FREE OF OBJECTIONABLE COARSE MATERIALS.

d. AGGREGATE COVER (GRAVEL. CRUSHED STONE OR SLAG) MUST BE WASHED, 1/4 INCH TO 2 A INCHES AND APPLIED AT A RATE OF 9

CUBIC YARDS PER 1,000 SQUARE FEET.

4. MAINTENANCE

a.WOOD CHIPS MUST BE MONITORED FOR DECOMPOSITION AND NEW APPLICATIONS MADE.

b.CRUSHED STONE MUST BE MONITORED FOR WASH OUT AND SLIPPING DOWN SLOPE. IF EITHER c.OCCUR. NEW MATERIAL MUST BE PROVIDED ON THE BARREN AREAS.

I. VEGETATIVE PRACTICE

1. FOR PERMANENT MEASURES AND PLANTINGS.

a. LIMESTONE MUST BE THOROUGHLY INCORPORATED INTO THE LOAM LAYER AT A RATE OF 3 TONS PER ACRE IN ORDER

TO PROVIDE A PH VALUE OF 5.5 TO 6.5.

b. FERTILIZER MUST BE SPREAD ON THE TOP LAYER OF LOAM AND WORKED INTO THE SURFACE. FERTILIZER

APPLICATION RATE MUST BE 800 POUNDS PER ACRE OF 10-20-20 FERTILIZER.

c. SOIL CONDITIONERS AND FERTILIZER MUST BE APPLIED AT THE RECOMMENDED RATES AND MUST BE THOROUGHLY WORKED INTO THE LOAM. LOAM MUST BE RAKED UNTIL THE SURFACE IS FINELY PULVERIZED, SMOOTH AND EVEN, AND THEN COMPACTED TO AN EVEN SURFACE CONFORMING TO THE REQUIRED LINES AND GRADES WITH APPROVED

ROLLERS WEIGHING BETWEEN 4-1/2 POUNDS AND 5-1/2 POUNDS PER INCH OF WIDTH.

d. SEED MUST BE SOWN AT THE RATE SHOWN BELOW. SOWING MUST BE DONE ON A CALM, DRY DAY, PREFERABLY BY MACHINE, BUT IF BY HAND, ONLY BY EXPERIENCED WORKMEN. IMMEDIATELY BEFORE SEEDING, THE SOIL MUST BE LIGHTLY RAKED. ONE HALF THE SEED MUST BE SOWN IN ONE DIRECTION AND THE OTHER HALF AT RIGHT ANGLES TO THE ORIGINAL DIRECTION. IT MUST BE LIGHTLY RAKED INTO THE SOIL TO A DEPTH NOT OVER 1/4 INCH AND ROLLED

WITH A HAND ROLLER WEIGHING NOT OVER 100 POUNDS PER LINEAR FOOT OF WIDTH.

e. HAY MULCH MUST BE APPLIED IMMEDIATELY AFTER SEEDING AS INDICATED ABOVE. F. THE SURFACE MUST BE WATERED AND KEPT MOIST WITH A FINE SPRAY AS REQUIRED, WITHOUT WASHING AWAY THE SOIL UNTIL THE GRASS IS WELL ESTABLISHED. ANY AREAS WHICH ARE NOT SATISFACTORILY COVERED WITH GRASS MUST BE RESEEDED, AND

ALL NOXIOUS WEEDS REMOVED.

f. THE CONTRACTOR MUST PROTECT AND MAINTAIN THE SEEDED AREAS UNTIL ACCEPTED.

g. A GRASS SEED MIXTURE CONTAINING THE FOLLOWING SEED REQUIREMENTS MUST BE APPLIED AT THE INDICATED

RATE:

SEEDING RATE

CREEPING RED FESCUE 175 LBS/ACRE

KENTUCKY BLUEGRASS 25 LBS/ACRE

PERRENIAL RYE GRASS 50 LBS/ACRE

h. IN NO CASE MUST THE WEED CONTENT EXCEED 1 PERCENT BY WEIGHT. ALL SEED MUST COMPLY WITH STATE AND FEDERAL SEED LAWS. SEEDING MUST BE DONE NO LATER THAN SEPTEMBER 15. IN NO CASE MUST SEEDING TAKE

PLACE OVER SNOW.

J. DORMANT SEEDING (SEPTEMBER 15 TO FIRST SNOWFALL)

FOLLOW PERMANENT MEASURES SLOPE, LIME, FERTILIZER AND GRADING REQUIREMENTS. APPLY SEED MIXTURE AT TWICE THE

INDICATED RATE. APPLY MULCH AS INDICATED FOR PERMANENT MEASURES.

K. STORM DRAIN INLET PROTECTION

1.STRAW/HAY BALE INLET STRUCTURE

a.BALES MUST BE EITHER WIRE BOUND OR STRING TIED WITH THE BINDINGS ORIENTED AROUND THE SIDES RATHER

THAN OVER AND UNDER THE BALES.

b.BALES MUST BE PLACED LENGTHWISE IN A SINGLE ROW SURROUNDING THE INLET, WITH THE ENDS OF ADJACENT

BALES PRESSED TOGETHER.

c.THE FILTER BARRIER MUST BE ENTRENCHED AND BACKFILLED. A TRENCH MUST BE EXCAVATED AROUND THE INLET THE WIDTH OF BALE TO A DEPTH OF FOUR (4) INCHES. AFTER THE BALES ARE STAKED, THE EXCAVATED SOIL MUST BE

BACKFILLED AND COMPACTED AGAINST THE FILTER BARRIER.

d.EACH BALE MUST BE SECURELY ANCHORED AND HELD IN PLACE BY AT LEAST TWO (2) STAKES OR REBARS DRIVEN

THROUGH THE BALE.

e.LOOSE STRAW/HAY MUST BE WEDGED BETWEEN BALES TO PREVENT WATER FROM ENTERING BETWEEN BALES.

f. ALL STRUCTURES MUST BE INSPECTED AFTER EVERY RAINSTORM AND REPAIRS MADE AS NECESSARY.

g. SEDIMENT MUST BE REMOVED FROM THE DEVICES AFTER THE SEDIMENT HAS REACHED A MAXIMUM OF ONE-THIRD

THE DEPTH OF THE TRAP.

h. HAYBALES MUST BE REMOVED AND THE AREA REPAIRED AS SOON AS THE CONTRIBUTING DRAINAGE AREA TO THE

INLET HAS BEEN COMPLETELY STABILIZED.

2. BLOCK AND GRAVEL INLET PROTECTION

a.PLACE CONCRETE BLOCKS LENGTHWISE ON THEIR SIDE IN A SINGLE ROW AROUND THE PERIMETER OF THE INLET, WITH THE ENDS OF ADJACENT BLOCKS ABUTTING. THE HEIGHT OF THE BARRIER CAN BE VARIED, DEPENDING ON DESIGN NEEDS, BY STACKING COMBINATIONS OF 4-INCH, 8-INCH AND 12-INCH WIDE BLOCKS. THE BARRIER OF BLOCKS

MUST BE AT LEAST 12 INCHES HIGH AND NO GREATER THAN 24 INCHES HIGH.

b.WIRE MESH MUST BE PLACED OVER THE OUTSIDE VERTICAL FACE (WEBBING) OF THE CONCRETE BLOCKS TO PREVENT STONE FROM BEING WASHED THROUGH THE HOLES IN THE BLOCKS. HARDWARE CLOTH OR COMPARABLE WIRE MESH

WITH 1/2-INCH OPENINGS MUST BE USED.

c.STONE MUST BE PILED AGAINST THE WIRE TO BE THE TOP OF THE BLOCK BARRIER. STONE GRADATION MUST BE WELL

GRADED WITH THE MAXIMUM STONE SIZE OF 6 INCHES AND MINIMUM STONE SIZE OF 1 INCH.

d.IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS

FUNCTION, THE STONE MUST BE PULLED AWAY FROM THE BLOCKS, CLEANED AND REPLACE.

3. STABILIZED CONSTRUCTION ENTRANCE

a.SPECIFICATIONS

1. AGGREGATE SIZE: USE TWO (2) INCHES STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.

2.AGGREGATE THICKNESS: NOT LESS THAN SIX (6) INCHES.

3.WIDTH: TEN (10) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH OF POINTS WHERE INGRESS OR EGRESS

OCCURS.

4.LENGTH: AS REQUIRED. BUT NOT LESS THAN FIFTY (50) FEET

5.GEOTEXTILE: TO BE PLACED OVER THE ENTIRE AREA TO BE COVERED WITH AGGREGATE. PIPING OF SURFACE

WATER UNDER ENTRANCE MUST BE PROVIDED AS REQUIRED.

6.CRITERIA FOR GEOTEXTILE: THE FABRICS MUST BE TREVIA SPUNBOND 1135, MIRAFI 600X OR EQUAL.

b. MAINTENANCE THE ENTRANCE MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT MUST BE DONE ON A AREA STABILIZED WITH AGGREGATE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. ALL SEDIMENT MUST BE PREVENTED FROM ENTERING

STORM DRAINS, DITCHES OR WATERWAYS.

C-501

E R

O S

I O

N

A

D

I M

E N

T A

T I O

N

C

O N

T R

T

E S

Z R

J

Z R

J

L D

A

C

D

2 3

C

4 5

A

B

M A

R K

D E

S C

R I P

T I O

N

SHEET ID

D A

T E

US Army Corps of Engineers ®

I S

S U

E

D

A T

E

S O

L I C

I T

A T

I O

N

N

O

C O

N T

R A

F I

M

B E

R

D E

S I G

N E

D

B

Y

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

F I

M

E

M

Y

C

O R

E

N G

I N

E E

R S

C O

G

I O

S

E A

R C

H

A

G

I N

E E

R I N

G

L

A B

O R

A T

O R

Y

C L I M

A T

E

C

O L

D

C

H A

M B

E R

S

H

A N

O V

E R

N

H

N E

W

E

N G

L A

S

T R

I C

T

V

E R

G I N

A

D

C

O N

C O

C O

L B

Y

C

O M

P A

N Y

L

L C

R

K

S

T R

E E

T

P

O R

T L A

A N

S I

D

W W

J B

W W

J D

I S

S U

N

S T

R U

C T

I O

N

SCALE: NTS

SILT SOCK DETAILC3

FLOW

FLOW

FLOW

UP SLOPE AREA OF DISTURBANCE

1. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT

LEAST DAILY DURING PROLONGED RAINFALL. INSPECT FOR SIGNS OF EROSION OR

SEDIMENTATION. REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.

2. SHOULD THE SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE, REPLACE

PROMPTLY.

3. REMOVE SEDIMENT DEPOSITS AFTER EACH STORM EVENT AND WHEN DEPOSITS

REACH APPROXIMATELY 1/2 THE HEIGHT OF THE BARRIER.

JOINING SECTIONS

OF SILT FENCES DOWN SLOPE AREA

TO BE PROTECTED

4" MI

N.

4" MIN

10' MAX.

WRAP SEDIMENTATION

CONTROL FABRIC AROUND

WOOD POST, ONE FULL

TURN

WOOD

POST

SEDIMENTATION

CONTROL FABRIC

WOOD POST

(TYPICAL)

3' TYPICAL

12" EMBEDMENT MIN.

BACKFILL

SEDIMENTATION

CONTROL FABRIC

WOOD POST

4"x4" MIN.

TRENCH

BACKFILL TRENCH AFTER

INSTALLATION OF SILT

FENCE

SCALE: NTS

SILTATION FENCE DETAILC1

END AND SIDE OVERLAP AT

CORNERSSTRAW BALES STAKED WITH

TWO STAKES PER BALE

RUN-OFF WATER

WITH SEDIMENT

STAKED STRAW

BALE

COMPACTED SOIL TO

PREVENT PIPING

FILTERED

WATER

FILTER FABRIC MATERIAL SECURELY

FASTENED TO THE POSTS WIRE MESH (IF

USED)

EXPANSION RESTRAINT

INSTALL SILT SACK UNDER GRATE

NOTES:

1. INSTALL SILTSACK PER MANUFACTURER'S RECOMMENDATIONS.

2. SILTSACKS SHALL BE CHECKED FOR SEDIMENT LEVEL AND OVERALL CONDITION IMMEDIATELY AFTER

EVERY RAIN EVENT AND AT LEAST EVERY DAY DURING PROLONGED RAINFALL.

3. SEDIMENT SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF

THE SILTSACK. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER

THAT WILL NOT ERODE.

4. SEDIMENT SHALL ONLY BE REMOVED BY REMOVING THE SILTSACKS FROM THE CATCH BASINS

ACCORDING TO MANUFACTURER RECOMMENDATIONS.

6. CARE SHALL BE TAKEN TO AVOID SPILLING SEDIMENT WHILE REMOVING THE SILTSACK.

7. ANY DAMAGED SILTSACK SHALL BE REPLACED WITH A NEW SILTSACK.

SILT SACK BY ACF ENVIRONMENTAL

OR APPROVED EQUIVALENT CATCH BASIN

LOOPS FOR INSERTING REBAR

(FOR LIFTING AND REMOVAL)

STAKE ON 10'

LINER

SPACING

WATER FLOW

WORK AREA

AREA TO BE

PROTECTED

PLAN VIEW

SECTION

2"x2" WOODEN STAKE

SILT SOCK SIZE PER

MANUFACTURER

RECOMMENDATIONS

WORK AREA

AREA TO BE

PROTECTED

3" -4

1'- 0"

SILT SOCK SIZE PER

MANUFACTURER

RECOMMENDATIONS

NOTE: SILT SOCK MUST BE IN

CONTINUOUS AND FULL

CONTACT WITH THE GROUND

AT ALL INSTALLED LOCATIONS.

SCALE: NTS

HAYBALE DIKE DETAILA3

SCALE: NTS

INLET PROTECTION - SILT SACK DETAILA1

SECTION VIEW

PLAN VIEW

' M

IN

50' MIN.

EXISTING PAVED

OR GRAVEL

ROAD

EXISTING

PAVED

ROAD

50' MIN.

NOTES:

1. STONE SIZE: 2" USE CRUSHED STONE OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.

2. THICKNESS: MINIMUM OF 6".

3. MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT

TRACKING OR FLOWING OF SEDIMENT ONTO…