This amendment modifies a solicitation for the construction of a climatic chamber building at the Cold Regions Research and Engineering Laboratory in Hanover, New Hampshire. The Army Corps of Engineers seeks responses to sixteen questions regarding specifications for modular construction, metal building systems, electrical and fire alarm wiring, and foundation systems. Clarifications included allowing shared responsibility for site safety and quality control, acceptance of alternative insulated wall panel and foundation systems, and specification of wind and seismic design criteria.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Bid Summary_W912WJ20B0008.pdf PDF
Amendment 0006.pdf PDF
Amend 0005_Architectural Drawing Revisions.pdf PDF
Amend 0005_13 34 19.pdf PDF
Amendment 0005.pdf PDF
Amend 0004_11 01 00.pdf PDF
Amend 0004_13 34 19.pdf PDF
Amend 0003_A-310.pdf PDF
Amend 0003_03 30 00.pdf PDF
Amend 0003_S-301.pdf PDF
Amend 0003_P-501.pdf PDF
Amend 0003_CD-101.pdf PDF
Amend 0003_C-503.pdf PDF
Amend 0003_A-601.pdf PDF
Amendment 0003.pdf PDF
Amend 0003_S-501.pdf PDF
Amend 0003_11 20 00.pdf PDF
Amend 0003_13 34 19.pdf PDF
Amend 0003_28 31 63.pdf PDF
Amend 0003_A-301.pdf PDF
Amend 0003_22 07 19.pdf PDF
CRREL Climatic Cold Chambers - IFC Drawings.pdf PDF
Amendment 0002.pdf PDF
11 20 00 - Amend002_4-17-20.pdf PDF
Amendment 0001.pdf PDF
CRREL Climatic Chamber Pre-Bid Site Visit 16APR20.pdf PDF
Solicitation W912WJ20B0008 CREEL Climatic Cold Chambers Virtual Site Visit 2020-04-16-10-00-04.mp4 MP4 file
Solicitation W912WJ20B0008.pdf PDF
J A_Redacted.pdf PDF
Drawing.pdf PDF
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide responses to RFI's. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ20B0008

X 9B. DATED (SEE ITEM 11)

06-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-May-2020

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

RFI'S 0004

1. Section 1.8.1.2 of specification 01 35 26 Governmental Safety Requirements states that “The Contractor

Quality Control Manager cannot be the SSHO or the Project Superintendent on this project”. Section 3.4.2 of specification 01 45 00 Quality Control states that “The CQC System Manager, in addition to its role and quality control duties as specified herein, may also serve as the Site Safety and Health Officer”. Can the CQC System Manager also act as the SSHO? Please clarify.

RESPONSE: The Government Safety Office does not have an issue with site safety being a shared responsibility with QC.

2. Section 1.6.d of specification 01 35 26 Governmental Safety Requirements states “The Site Safety and Health

Officer (SSHO) shall have a minimum of 1 year experience conducting real time air monitoring (especially for TCE), and interpreting results for the purpose of identifying PPE requirements”. If the contractor’s on-site SSHO does not have this monitoring experience (especially with TCE), would the government accept the use of a third party air monitoring firm in lieu of the SSHO if they act as a direct consultant to the contractor?

RESPONSE: The Government Safety Office does not have an issue with a contractor employing a qualified third party to perform air monitoring for TCE but they must be onsite whenever the potential for TCE exposure exists in order to conduct monitoring.

3. Section 2.1.2 Wall Construction of specification 11 01 00 Modular Office and Restroom/Shower states “Walls to receive insulation sprayed to the interiors using 2x wood stud support for ½ in. gypsum interior surface layer”. After discussing these requirements with multiple firms specializing in modular construction, none of the interested firms have experience with constructing modular assemblies with wood studs.

As an alternative to the wood stud framing for the walls, would the government accept an insulated steel post system with insulated modular wall panels inserted between posts? Note that this alternative system will still allow for panels to be pre-wired and pre-plumbed IAW specification 11 01 00.

RESPONSE: Steel post is acceptable. Amended specification included.

4. In Spec Section 28 31 63(Fire Alarm), part 2.2.10.3 Alarm Wiring, it says “to provide all wiring in rigid metal conduit”. It then goes on to say “EMT is acceptable in dry locations not enclosed in concrete or where subject to mechanical damage”. EMT is not allowed anywhere else on the job according to Spec Section 26 20 00, part

3.1.5.1. Can you please clarify if EMT is acceptable to use or not for Fire Alarm wiring?

RESPONSE: Refer to Amendment 0003, response #20.

5. In Spec Section 26 20 00, part 3.1.5.4 and 3.1.5.5, it says “underground conduit is PVC type 40. If it’s greater than 600V use Rigid Metal Conduit”. In Spec Section 33 71 02, part 2.1.1 and 2.1.2, it says “use PVC for direct burial, riser applications, and concrete encasements”. Can you please clarify which type of conduit will be needed for any feeder over 600V?

RESPONSE: Refer to Amendment 0003, response #21.

6. Section 2.4.2 Finish, e., of specification 11 34 10 Metal Building System indicates "Color: The exterior finish chosen from the manufacturer's color chars and chips." Please confirm the color charts are for the standard color provided by the manufacturer and not any special color selections? Please advise?

RESPONSE: That is correct. The selections will be made based on the standard color charts.

7. Section 3.6 of specification 01 50 00 Temporary Construction Facilities and Controls requires the contractor to provide the Resident Engineer with a separate 12’ x 60’ office adjacent to the contractor’s office. The indicated contractor laydown area on drawing G-101 only measures 50’ x 50’. Can the Resident Engineer’s office be placed at another location on campus as to not limit the already limited laydown space for the contractor? Please clarify.

RESPONSE: Yes, the Resident Engineer’s office can be located at another location on campus. One option is the grassed area just south-east of the site, north of the soil stockpile area shown on G-101.

8. Please confirm that the PEMB should be designed as unheated.

RESPONSE: Refer to the Specifications. The pre-engineered metal building is not intended to be heated or conditioned.

9. Please confirm that there is no roof or wall insulation in the PEMB.

RESPONSE: Refer to Amendment 0003, response # 17.

10. What should be used for the Risk Factor/Occupancy Category for design? Either I-Low Hazard, II-Normal, III- High or IV-Essential? Most government projects are carried as IV-Essential but Building Summary notes drawing A-001 says Occupancy Group S-1.

RESPONSE: Use Risk Category II. Amended specification included.

11. No Wind Exposure was defined, is “C” acceptable?

RESPONSE: Use Wind Exposure ‘C’. Amended specification included.

12. No Site Class was defined, is “D” acceptable?

RESPONSE: Use Site Class ‘D’. Amended specification included.

13. No Spectral Response were defined, is Ss=26.2 and S1 = 8.8 acceptable?

RESPONSE: Use Ss = 0.246, S1 = 0.071. Amended specification included.

14. No roof panel gauge/thickness was defined, is 24Ga. acceptable?

RESPONSE: Refer to the deflection criteria outlined on S-001 and select a panel thickness accordingly.

15. No wall panel gauge/thickness was defined, is 26Ga. acceptable?

RESPONSE: Refer to the deflection criteria outlined on S-001 and select a panel thickness accordingly.

16. Can you provide a copy of the "Security Regulations" per section 01100 para 1.5?"

RESPONSE: The Security Regulations are provided in section 01 11 00 paragraph 1.5 Security. CRREL Security Office does not have any further regulations.

Important Note: Amend 0003_A-301 attachment deleted. There are no revisions to A-301. The only changes were to Amend 0003_A-310.

AMENDMENT 0004 OF SOLICITATION

1.1 CHANGES TO SPECIFICATIONS

Narrative Changes to the Specifications

(1) Section 11 01 00 MODULAR OFFICE AND RESTROOM/SHOWER, Subpart 2.1.2 a.

Insulation, change paragraph read to “1. Rigid polyisocyanurate board insulation to provide minimum R-30 at roofs, and R-38 at floors. Walls to receive insulation to R-19.

2. Walls to receive insulation to the interiors using stud or pipe structure to support insulation and 1/2 in. gypsum interior surface layer.

Framing to be held off the outer walls by minimum 1 in. to allow continuous insulation installation.

(2) Section 13 34 19 METAL BUILDING SYSTEMS, Subpart 1.2.1 Structural Performance, add the following text after the first sentence:

“Snow Load:

ASCE 7-10

Ground Snow: 60 psf Exposure Category B

Wind Load:

ASCE 7-10

Risk Category: II Wind Exposure: C

Seismic Load:

ASCE 7-10

Risk Category II Site Class D Spectral Response: SS = 0.246, S1 = 0.071

(End of Summary of Changes)