This amendment modifies solicitation W912WJ20B0008 for the construction of a Climatic Chamber Building at the Cold Regions Research and Engineering Laboratory in Hanover, New Hampshire. The amendment provides the virtual site visit sign-in sheet, presentation slides, and recording for offerors. It also includes responses to industry questions on the modular office/restroom unit and metal building specifications. No changes are made to the solicitation response date or terms. The solicitation is for construction services to build a new Climatic Chamber Building for the Army Corps of Engineers and Cold Regions Research and Engineering Laboratory.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Bid Summary_W912WJ20B0008.pdf PDF
Amendment 0006.pdf PDF
Amend 0005_Architectural Drawing Revisions.pdf PDF
Amend 0005_13 34 19.pdf PDF
Amendment 0005.pdf PDF
Amend 0004_11 01 00.pdf PDF
Amendment 0004.pdf PDF
Amend 0004_13 34 19.pdf PDF
Amend 0003_A-310.pdf PDF
Amend 0003_03 30 00.pdf PDF
Amend 0003_S-301.pdf PDF
Amend 0003_P-501.pdf PDF
Amend 0003_CD-101.pdf PDF
Amend 0003_C-503.pdf PDF
Amend 0003_A-601.pdf PDF
Amendment 0003.pdf PDF
Amend 0003_S-501.pdf PDF
Amend 0003_11 20 00.pdf PDF
Amend 0003_13 34 19.pdf PDF
Amend 0003_28 31 63.pdf PDF
Amend 0003_A-301.pdf PDF
Amend 0003_22 07 19.pdf PDF
CRREL Climatic Cold Chambers - IFC Drawings.pdf PDF
Amendment 0002.pdf PDF
11 20 00 - Amend002_4-17-20.pdf PDF
CRREL Climatic Chamber Pre-Bid Site Visit 16APR20.pdf PDF
Solicitation W912WJ20B0008 CREEL Climatic Cold Chambers Virtual Site Visit 2020-04-16-10-00-04.mp4 MP4 file
Solicitation W912WJ20B0008.pdf PDF
J A_Redacted.pdf PDF
Drawing.pdf PDF
Specifications.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide virtual site visit sign in sheet, provide the virtual site visit presentation slides, provide the recording from the virtual site visit presentation, and to provide responses to RFI's. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0008

X 9B. DATED (SEE ITEM 11)

06-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Apr-2020

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ20B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

RFI'S 0001

We are requesting that a Basis of Design, and two other acceptable manufacturers if possible, for the following items of work:

1. Specification 11 01 00 – Modular Office and Restroom/Shower unit

2. Specification 13 34 19 – Metal Building Systems

Response from A/E: The Modular Office and Restroom/Shower unit, and Metal Building Systems were not based around any particular manufacturers. A Basis of Design will not be included in the project documents.

VIRTUAL SITE VISIT SIGN IN

Name (First and Last) COMPANY Robert Higgins Neagley & Chase Construction Dhawal Patel P&S Construction, Inc Kevin Boring Weiss Tech Technic North America David Hutchinson Turnstone Corporation Kamlesh pate J & J Contractors, Inc Brendan Hanna Structural Associates, Inc.

Tracy Gunderson Structural Associates, Inc.

Nick Brown Classic Site Solutions Paras Patel P&S Construction, Inc.

Geoffrey Gagnon E.S.Boulos Company Michael Stratton Weiss Technik North Ammerica, Inc.

Kevin Boring Weiss Technik North Ammerica, Inc.

Terry Harwood CRREL Campus Manager Liseth Velez L.J.V. Development, LLC Harsh Patel P&S Construction, Inc Stephen Rollins Neagley Chase Construction Company Sean Lynch P&S Construction, Inc.

Matt Dale CCB, Inc.

Andrew Chrusciel Neagley and Chase Construction Company Edward Coleman CRREL Department of Public Works Branch Chief Tom Banks J & J Contractors, Inc Erin E. Bradley Contracting Officer Caitlin Slattery Program Manager Eva Marie D’Antuono Deputy for Small Buisness Christopher Ralph Engineering Technical Lead Sara J. Torres Contract Specialist

(End of Summary of Changes)

W912WJ20B0008