This document is a Questions and Answers (Q&A) response file for Request for Proposals DACA27-1-26-102 issued by the Department of the Army (DA). The Q&A addresses 13 inquiries from potential offerors regarding a renewable energy generation project at Fort Bragg with a 50-year lease term.
Key clarifications provided include: DA does not believe nuclear facility development is feasible given the desired project timeline and does not envision owning or operating nuclear generation assets directly, preferring contractor-provided solutions instead. DA has not prescribed required attributes for nuclear generation assets and has no existing supplier or OEM preferences. Offerors are responsible for their own due diligence to ensure development compliance with federal, state, and local requirements and for obtaining all necessary permits at no cost to DA. Individual installations procure their own energy and maintain procurement authority. For non-U.S. suppliers, components, fuel, or services, offerors should reference Section 2.2.9 of the RFP, as additional limitations may apply based on specific technologies proposed. Until a project is identified, DA cannot determine what level of National Environmental Policy Act (NEPA) review will be required. Submission format allows cover letters or executive summaries that do not count toward page limits specified in RFP Section 6. Attachment C of the RFP identifies available Fort Bragg properties available for lease.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following questions were received by the Department of the Army (DA) in reference to Request for Proposals DACA27-1-26-102. The questions and DA’s responses are provided below.
Q.1. What incremental beyond electric power demand the projects contemplated by this RFP does each installation anticipate by 2035 (and beyond)?
A.1. Question is unclear to DA.
Q.2. Is DA open to pursuing NRC licensing for a nuclear facility, or does it envision an alternative regulatory or authorization pathway?
A.2. As it relates to this RFP, DA does not believe a nuclear facility would be feasible given the desired timeline of the Project.
Q.3. Does DA envision owning and/or operating nuclear generation assets directly, or would it prefer a contractor-provided turnkey or power-as-a-service solution?
A.3. DA does not envision owning or operating nuclear generation assets directly.
Q.4. Are there any technology preferences or constraints (e.g., reactor class, size range, maturity level)?
A.4. DA has not prescribed any required attributes for nuclear generation assets.
Q.5. Are there existing supplier, OEM, or contractor relationships that DA would expect to leverage or give preference to?
A.5. No.
Q.6. Are there additional security requirements beyond standard NRC expectations, including workforce clearance levels or access restrictions?
A.6. DA requirements that may vary from NRC requirements for nuclear generation assets located on DA land would need to be determined.
Q.7. Are there limitations or restrictions on the use of non-U.S. suppliers, components, fuel, or services?
A.7. Please refer to Section 2.2.9 of the RFP. Additional limitations or restrictions unknown at this time may apply based upon the specific technologies, components, fuel, or services proposed for the Project.
Q.8. For each site, who is the energy procurement authority: the individual installation, a higher Army command, or another Department-level office?
A.8. Installations procure their own energy.
Q.9. Does the Department of the Army anticipate any opportunities to accelerate NEPA review for a project sited on Army land (e.g., CATEX eligibility, adoption/tiering, or other streamlining pathways)?
A.9. Until a Project is identified, DA cannot address what level of NEPA review and documentation may be required.
Q.10. Beyond NEPA, does the Department of the Army anticipate taking any affirmative role in coordinating, preempting, or otherwise accelerating state and local permitting and approvals for on-base generation projects (e.g., land use, zoning, environmental permits, air permits, utility interconnection, or construction permits)? If so, how does the Army envision that coordination working in practice, and which approvals would remain outside federal control?
A.10. As provided in Sections 2.2.6.a(1) and (3) of the RFP, the Offeror is responsible for conducting its own due diligence and determining to its satisfaction that: (1) The development of the Properties, as contemplated by the Offeror, can be accomplished in compliance with applicable federal, state, and local requirements (including fire, life safety, accessibility, zoning, state and local building codes, and all other local land use restrictions), and (3) The necessary permits, variances, special exceptions and other governmental actions or approvals required for the contemplated development can be obtained at no cost or expense to DA.
Q.11. Does a property have to be expressly situated on Fort Bragg for consideration?
Or if I read this correctly, the government has property available and they are looking for a long lease of the property?
A.11. Attachment C of the RFP identifies the Properties at Fort Bragg that are available for a fifty (50) year lease from DA.
Q.12. May we submit a cover letter or executive summary with our proposal?
A.12. Yes, a cover letter or executive summary may be included with the proposal.
Q.13. Please confirm that a cover letter or executive summary will not count towards the page limits listed in RFP Section 6. Table 1 (page 14).
A.13. A cover letter or executive summary will not count towards the page limits listed in Section 6 of the RFP.