This is a Questions and Answers document from the Dugway Proving Ground Industry Day held on January 7, 2026, addressing potential offerors' inquiries regarding an Enhanced Use Lease (EUL) opportunity at the facility.

The document addresses eight key questions covering critical operational and administrative considerations. Regarding consideration options, the Department of the Army's preference is in-kind consideration, with offerors directed to RFP Sections 1.b, 2.2.13, 6.5, and 7.3.5 for specific guidance. For utilities at Site A, offerors should reference Attachment E of the RFP for provider information. Water is available through Dugway's wells for the sole use of Dugway, though the agency cannot confirm whether available water will meet specific project needs; annual water usage is project-specific. An Environmental Impact Statement exists for Dugway but is not specific to the proposed project, requiring offerors to comply with environmental regulatory requirements per RFP Sections 2.2.1 and 2.2.2. Infrastructure details include transmission lines originating from Tooele, Utah, with Dugway operating a 46 kb line. Access to the facility remains available through the main gate during non-office hours, after hours, and Friday through Sunday.

View the file

Other files

File Type Posted
Fort Hood Questions Submitted.pdf PDF
Fort Bliss Industry Day 2.0 QA.pdf PDF
QA - 2.pdf PDF
Fort Bragg Industry Day 2.0 QA.pdf PDF
Fort Bliss Questions Submitted.pdf PDF
Fort Hood Industry Day 2.0 QA.pdf PDF
QA - 1.pdf PDF
Fort Hood Industry Day QA.pdf PDF
Fort Bragg Industry Day QA.pdf PDF
Fort Bliss Industry Day QA.pdf PDF
Data Center RFP Amendment 3.pdf PDF
Data Center RFP Amendment 2.pdf PDF
Data Center RFP Amendment 1.pdf PDF
Data Center RFP Amended.pdf PDF
RFP No. DACA27-1-26-102.pdf PDF
Attachment F Bliss.pdf PDF
Attachment B BTA Sample.pdf PDF
Attachment C EUL Sample.pdf PDF
Attachment H NEPA Implementing Procedures.pdf PDF
Attachment E Bragg.pdf PDF
Attachment D Hood.pdf PDF
Attachment G Dugway.pdf PDF
Attachment A 10 USC 2667.Pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dugway Proving Ground Industry Day Q&A January 7, 2026

Q.1. In the past and in other historical USACE projects such as an Enhanced Use Lease (EUL), the consideration options of cash, in-kind, or a combination thereof, are always a challenge for (entity) to advise and provide guidance to potential lessees on how or what is the best consideration options for the offeror to be awarded the EUL and get a project started for the mission being offered. Under the current Administration, how does USACE, Department of the Army (DA), and/or Department of War (DOW) feel about these consideration options? What consideration type is best for the selection process?

A.1. Please refer to Sections 1.b, 2.2.13, 6.5, and 7.3.5 of the RFP regarding consideration to be provided by the lessee under the lease. Section 7.3.5 provides that DA’s preference is in-kind consideration.

Q.2. What utilities are available at Site A?

A.2. Attachment E of the RFP identifies the utility providers applicable to Sites A, B, and C.

Q.3. Can offerors tap into the water supply at Site A?

A.3. Yes, Dugway has water available in its wells, and the water table is for Dugway's sole use. Nevertheless, DA cannot confirm whether the available water will meet the needs of any specific project.

Q.4. What is the annual water usage for a commercial data center?

A.4. It is project-specific.

Q.5. Is there preference of in-kind consideration services that Dugway would like? Is there a list?

A.5. Please refer to Sections 1.b, 2.2.13, 6.5, and 7.3.5 of the RFP regarding consideration to be provided by the lessee under the lease.

Q.6. Is there an Environmental Impact Statement (EIS) at Dugway?

A.6. There is an EIS, but it is not specific for the Project proposed by this RFP.

Offerors should refer to Section 2.2.1 and 2.2.2 of the RFP regarding compliance with environmental regulatory requirements, including the National Environmental Policy Act.

Q.7. Where do the closest transmission lines come from?

A.7. Tooele, Utah. Dugway has a 46 kb line.

Q.8. Is access available to Dugway during non-office work hours/after hours and Friday- Sunday?

A.8. Yes, access remains available through the main gate.