This is a federal construction solicitation document containing supplementary conditions and project specifications. The solicitation allows offerors to propose "brand name or equal" products, requiring that equal products meet all salient physical, functional, or performance characteristics specified in the solicitation. Offerors proposing equal products must clearly identify items by brand name and make/model number, include descriptive literature such as illustrations or drawings, and clearly describe any modifications planned to conform to requirements. The Contracting Officer will evaluate equal products based on information furnished by the offeror or reasonably available; the offeror bears responsibility for providing all supporting documentation. Unless the offeror explicitly indicates an "equal" product is being offered, the branded item referenced in the solicitation must be provided.
The contract requires the contractor to commence work within 10 calendar days after receiving the notice to proceed, prosecute work diligently, and complete all work within 480 calendar days, including final cleanup of the premises. A mandatory site visit/pre-proposal meeting is scheduled for August 27, 2026, at a facility in Columbus, Ohio, with all attendees required to arrive by 1:25 p.m. The site visit includes introductions, safety briefing, exterior and interior building walkthroughs, and concludes at 3:30 p.m. Attendees must RSVP by 1:500 hours EST on August 26, 2026, providing name, company, contact information, and DBIDS verification code. Valid Real ID or DBIDS pre-registration documentation is required for access. The document indicates that physical site conditions have been investigated through surveys and auger borings, with weather data available from the National Weather Service and historical data from the U.S. Department of Commerce National Climatic Center.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00 73 00 Supplementary Conditions
Brand Name or Equal (Aug 1999)
(a) If an item in this solicitation is identified as "brand name or equal," the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that "equal" products must meet are specified in the solicitation.
(b) To be considered for award, offers of "equal" products, including "equal" products of the brand name manufacturer, must-
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by-
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate "equal" products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an "equal" product, the offeror shall provide the brand name product referenced in the solicitation.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 480 Calendar Days, after receiving notice to proceed. * The time stated for completion shall include final cleanup of the premises. * The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Surveys and Auger Borings.
(b) Weather conditions: The Contractor shall make his own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being Bloomington/Monroe County Airport.
(c) Transportation facilities: Access ways in the general area are shown on the drawings. Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.
(d) Historical data for all areas may be obtained from: U. S. Department of Commerce National Climatic Center Federal Building Asheville, N. C. 28801
Site Visit (Construction) (Feb 1995)
A Site Visit/ Pre -Proposal Meeting is scheduled for 27 August 2026
We will be holding a site visit following the Pre-Proposal Meeting.
All attendees are required to meet at Parking/ Meeting Location shown on attached map by
1325.
Schedule:
13:30 Introductions & Safety Brief
13:40 Depart BLDG 330 to BLDG 27
13:50 Arrive BLDG 27, begin walk around Exterior of building
14:20 Move to Interior of building
15:30 Conclude Site Visit, escort KTRs to James Rd Gate for departure
No inquiries will be allowed during the site visit. All inquiries must be submitted via the Projnet
Bidder Inquiry site. A Bidder Key is provided with the solicitation information.
Please RSVP the following information:
1. Name of Attendee
2. Company
3. Phone Number and Email Address
4. DBIDS Verification Code for visitor’s pass (as required)
Please remember to bring a Valid Real ID and/ or documents used for DBIDS preregistration in order to attend the site visit.
Send RSVP to Joseph.A.Verdone@usace.army.mil, USACE must receive the email by 1500 hours
EST. on 26 August 2026. No additional attendees will be registered after this date or time. A
Confirmation email will be sent out by 26 August 2026, to confirm each registration. It will include driving instructions to DSCC visitors center. We will also provide a base map and any other pertinent information.
File details come from the government source that posted it. Updated .